Solar  Energy Overview June 2014 Solar  Energy Overview June 2014

Solar Energy Overview June 2014 - PowerPoint Presentation

olivia-moreira
olivia-moreira . @olivia-moreira
Follow
361 views
Uploaded On 2018-11-03

Solar Energy Overview June 2014 - PPT Presentation

JM Family Enterprises JM Family Photovoltaic Systems 5 DataScan Alpharetta GA 1 00 Building Deerfield FL JM Lexus Service Center Margate FL JM Lexus New Car ShowroomSales Margate FL ID: 712029

building solar capacity power solar building power capacity roi yrs modules date 2011 deerfield lexus 2013 commission 131 pending

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Solar Energy Overview June 2014" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Solar Energy Overview

June 2014

JM Family

EnterprisesSlide2

JM Family Photovoltaic Systems5DataScan , Alpharetta GA

1

00 Building, Deerfield FL

JM Lexus Service Center, Margate FL

JM Lexus New Car Showroom/Sales, Margate FL

500 Building, Deerfield FL

111 Building, Deerfield FL

190 Building, Deerfield FL

Youth Automotive Training Center, Deerfield FL

1

2

4

3

6

7

8Slide3

DataScanCommission Date: Jan. 20 , 2011

202 kW power capacity 1,110 solar modules

ROI 7 yrs Slide4

100 Building Covered ParkingCommission Date: Nov. 18, 2011

33 kW power capacity 131 solar modules

ROI 7 yrsSlide5

500 BuildingCommission Date: Dec. 1, 2011

33 kW power capacity 131 solar modules

ROI 7 yrsSlide6

JM Lexus Service CenterCommission Date: Nov. 18, 2011

33 kW power capacity 131 solar modules

ROI 7 yrsSlide7

JM Lexus New Car Showroom

Commission Date: March 14, 2013

56 kW power capacity

221 solar modules

ROI 7 yrsSlide8

111 Building

Commission Date: Pending

146 kW power capacity

552 solar modules

ROI 6 yrsSlide9

190 Building

Commission Date: Pending

146 kW power capacity

552 solar modules

ROI 7 yrsSlide10

Youth Automotive Training CenterCommission Date: TBD

31 kW power capacity 117 solar modules

ROI 6 yrsSlide11

ChallengesRoof access and noise during business hours installationRoof Attachment Methods ie post-tension concrete deckInsurance company standards not establishedPermitting challangesEnd of utility rebate programSlide12
Slide13

2013 SOLAR PV PERFORMANCE RATIOCombined 2013 average 99.6%Slide14

Solar Production Monitoring JMFEsolar.com

Real-time output monitoring 1,000 MWh production since 2011 inception

Slide15

SuggestionsDemonstrate cost effectivenessVerify vendor experienceProvide progress updates and photosOffer solar installation toursSlide16

JMFE Solar System ParametersPower capacity of array does not exceed building consumption.Components are "Buy American” compliant.ROI of 7 yrs. or less based solely on cost of power and incentives.Meets FM Global requirements.

Meets JM standards above and beyond building code, including safety, functionality, resiliency, longevity, and aesthetics.System maintained by JMSC.

Turn key installation per JM contract and insurance requirements.Industry standard guarantee and material warranties.