Download Presentation The PPT/PDF document "Parsons Slough Project," is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Parsons Slough Project,
Elkhorn Slough,CA
Moving the crane barge into position at the start of the project Slide2
Preparation on the RR tie-in at the southern end of the sillSlide3
Completion of the RR tie-in at the southern end of the sillSlide4
Work on the RR tie-in at the northern end of the sill, including
installation of sheet pile with the vibratory hammerSlide5
Installation of sheet pile across Parsons channel with the
vibratory hammerSlide6
Surveying the sill across the channel before dropping the sheets
to gradeSlide7
Installation of the H piles
with the impact hammerSlide8
Placing the rock rampSlide9
The marine mammal monitoring post on the
west side of the sill