WATER RESOURCES DEPARTMEN T MINOR IRRIGATION Chief Engineer Minor Irrigation 1 SEPTEMBER2015 2 Minor Irrigation Deals with investigation and execution of Minor Irrigation Sources of ayacut up to 5000 Ac ID: 461997

2015 ayacut acres irrigation ayacut 2015 irrigation acres total tanks minor works amp project lakh lakhs water andhra tank

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "GOVERNMENT OF A.P" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

GOVERNMENT OF A.P

WATER RESOURCES DEPARTMENTMINOR IRRIGATION

Chief Engineer, Minor Irrigation

1

SEPTEMBER-2015Slide2

2

Minor Irrigation Deals with investigation and execution of Minor Irrigation Sources of ayacut up to 5000 Ac.

Minor Irrigation is providing irrigation facilities to increase the agriculture production by means of creating new ayacut, stabilizing the existing ayacut of 25.60 lakh acres and also provides drinking water to villages during summer season.

Minor Irrigation plays an important role in the development of agriculture and livelihoods particularly in drought prone areas and areas outside command of Major

Irrigation sector consist components like, construction of new sources and stabilizing the gap Ayacut schemes viz., NABARD, AIBP, APILIP, RRR TSP and SCSP.

In MI Department the benefits will be attained early i.e., by taking up repairs to the sources, the benefits will get in next cropping season.

MINOR IRRIGATIONSlide3

SECTORS IN IRRGATION DEPARTMENT

3

Major

61,29,022 Ac.

66%

Medium

5,30,452 Ac.

6%

Minor

25,60,444 Ac.

28%Slide4

Category wise sources under Minor Irrigation

4

Total Number of Sources 41,478 --- Total Ayacut covered 25,60,444Slide5

DISTRICT WISE MINOR IRRIGATION TANKS WITH AYACUT IN ACRES

5

Sno

.

District

Tanks having

Tanks having

Total

Ayacut Irrigated in Kharif 2014

ayacut

> 100 Ac

.

ayacut

< 100 Ac.

No.

Ayacut

No.

Ayacut

No.

Ayacut

MI

PR

Total

1

SRIKAKULAM

915

96431

7639

178955

8554

275386

111461

122710

2341712VIZIANAGARAM944110943831815737662622683191041051338552379603VISAKHAPATNAM23215779831117286733432306655061829315799334EAST GODAVARI2639101212533940315161304157097223660946325WEST GODAVARI3358124610543140913891126552001812095321136KRISHNA2487879066324903911103693300428685387277GUNTUR8122478213923029431708198876123260108PRAKASHAM3391219495511829389014024211267300115679SPSR NELLORE7222465249843632817062828521199321636113629310YSR KADAPA2347559315423227917761078721475525200011KURNOOL15768342454118186118016038160131055126512ANANTAPUR30389897219952039250214193624410244113CHITTOOR66816375373951365548063300307602513157340 SUB TOTAL5441140475635376801454408172206210586403368049954452 Anicuts & open head channels 661354234  661354234  41507 GRAND TOTAL610217,58,99035,3768,01,4544147825,60,4445,86,4033,68,0499,95,959

Total Capacity of MI Tanks : 142.59 TMC, Total Capacity of PR Tanks : 84.99 TMCSlide6

OBJECTIVES OF MINOR IRRIGATION DEPARTMENT

:The ultimate objective of the department is to

Restoring the existing M.I sources to original standards where necessary.

Construction of new Minor Irrigation Sources.

For stabilizing the irrigation potential created

Controlling the wastage of water through water

conservation plans and better water management plans.

Bridging the gap ayacut.

6Slide7

KHARIFF - 2014 AYACUT IRRIGATED IN ACRES

7

S.NO.

DISTRICT

NO. OF TANKS

TOTAL AYACUT IRRIGATED DURING

KHARIF - 2014 IN ACRES

MI

PR

TOTAL

MI

PR

TOTAL

1

2

3

4

5

9

10

11

A

TANKS

1

SRIKAKULAM

954

6937

7891

111461

122710

234171

2

VIZIANAGARAM

944823991831041051338552379603VISAKHAPATNAM232344936815061829315799334EAST GODAVARI263123214957097223660946325WEST GODAVARI335104613812001812095321136KRISHNA248675923300428685387277GUNTUR81187268198876123260108PRAKASAM33956590411267300115679SPSR NELLORE72296216841199321636113629310YSR KADAPA234154217761475525200011KURNOOL15747763438160131055126512ANANTHAPUR303960126324410244113CHITTOOR66873958063602513157340 TOTAL54803366639146586403368049954452BOPEN HEAD CHANNELS/ANICUTS/CHECK DAMS Etc20540041507GRAND TOTAL ( A+B)54803366641200586403368049995959OR SAY 9.96 LAKH ACRESSlide8

8

STATEMENT SHOWING THE DISTRICT WISE GAP AYACUT UNDER MINOR IRRIGATION

Sno

.

District

Total Registered Ayacut in Acres

Ayacut Irrigated in Kharif 2014

Gap Ayacut in Acres

1

SRIKAKULAM

275386

234171

41215

2

VIZIANAGARAM

268319

237960

30359

3

VISAKHAPATNAM

230665

79933

150732

4

EAST GODAVARI

130415

94632

35783

5

WEST GODAVARI

112655

32113

80542

6KRISHNA10369338727649667GUNTUR317082601056988PRAKASHAM140242115671286759SPSR NELLORE28285213629314655910YSR KADAPA107872200010587211KURNOOL80160512652889512ANANTAPUR141936244113949513CHITTOOR3003077340292967 Anicuts & open head channels 35423441507312727 GRAND TOTAL25604449959591564485 Or say in Lakh Acres25.69.9615.64Slide9

9

STATEMENT SHOWING THE DISTRICT WISE AYACUT PLANNED FOR THE YEAR

2015-16 UNDER MINOR IRRIGATION

Sno

.

District

Total Registered Ayacut in Acres

Ayacut Irrigated in Kharif 2014

Total Gap Ayacut in Acres

Proposed Gap Ayacut to be Bridged during the year 2015-16

Ayacut Planned for the

Khariff

2015

1

2

3

4

5=3-4

6

7 = 4+6

1

SRIKAKULAM

275386

234171

41215

20767

254938

2

VIZIANAGARAM

268319

237960

30359

29638

2675983VISAKHAPATNAM23066579933150732223531022864EAST GODAVARI130415946323578378961025285WEST GODAVARI11265532113805427500396136KRISHNA103693387276496610356490837GUNTUR317082601056985091311018PRAKASHAM1402421156712867510354219219SPSR NELLORE2828521362931465591030714660010YSR KADAPA1078722000105872134741547411KURNOOL801605126528895250657633012ANANTAPUR1419362441139495431994564013CHITTOOR30030773402929673801145351 Anicuts & open head channels 3542344150731272768989110496 GRAND TOTAL256044499595915644853130001308959 Or say in Lakh Acres25.609.9615.643.1313.09Slide10

10

STATEMENT SHOWING THE DISTRICT WISE PROPOSED GAP AYACUT TO BE BRIDGED UNDER MINOR IRRIGATION FOR

THE YEAR 2015-16

AYACUT IN ACRES

S.NO

DISTRICT

SCHEMES

TOTAL

NSP

DESILTING

SCSP

TSP

NABARD

RRR

APCBTMP

1

2

3

4

5

6

7

8

9

10

1

SRIKAKULAM

2959

3145

49

1051

 

627

12936207672VIZIANAGARAM109964227 4833  9582296383VISAKHAPATNAM63742180 750  13049223534EAST GODAVARI29501416 3530   78965WEST GODAVARI13506150 0   75006KRISHNA3925041977   3946103567GUNTUR65037636780   50918PRAKASHAM4242265120460284 1131103549SPSR NELLORE148911151002798148 57551030710YSR KADAPA260015305196394 3754 1347411KURNOOL13592292113910 509449292506512ANANTAPUR2573795334606181090746384319913CHITTOOR2682136021736333 1881363838011 Open Head Channels & Anicuts68989      68989 GRAND TOTAL15690838065234211168910502226359604313000Slide11

11

STATEMENT SHOWING THE DISTRICT WISE PROPOSED AYACUT TO BE BRIDGED QUARTER WISE FOR YEAR 2015-16

UNDER MINOR IRRIGATION

Sno

.

District

Target- Gap Ayacut to be Bridged during the year 2015-16 in Acres

1St Quarter

(Apr 2015 - Jun 2015)

2nd Quarter

(Jul 2015 - Sep 2015)

3rd Quarter

(Oct 2015 - Dec 2015)

4th Quarter

(Jan 2016 - Mar 2016)

1

SRIKAKULAM

20767

2077

4153

6230

8307

2

VIZIANAGARAM

29638

2964

5928

8891

11855

3

VISAKHAPATNAM

22353

2235

4471670689414EAST GODAVARI78967901579236931585WEST GODAVARI75007501500225030006KRISHNA1035610362071310741427GUNTUR50915091018152720368PRAKASHAM1035410352071310641429SPSR NELLORE10307103120613092412310YSR KADAPA13474134726954042539011KURNOOL250652507501375201002612ANANTAPUR4319943208640129601728013CHITTOOR38011380176021140315204 Anicuts & open head channels 689896899137982069727596 GRAND TOTAL313000313006260093900125200 Or say in Lakh Acres3.130.3130.6260.9391.252Slide12

12

ACTION PLAN FOR THE YEAR 2015-16

S.No

District

 

All Schemes  

No of Schemes

Total Aycut in Acres

Amount Rs in Lakhs

1

SRIKAKULAM

1160

36433

32159

2

VIZIANAGARAM

1054

51996

28351

3

VISAKHAPATNAM

652

39216

19063

4

EAST GODAVARI

463

13853

11524

5

WEST GODAVARI

335

13158168046KRISHNA25318168103707GUNTUR122893230678PRAKASAM31718165118309SPSR NELLORE374180821465110YSR KADAPA591236391501611KURNOOL33643974798412ANANTHAPUR494757881438613CHITTOOR11366668637142 Anicut & Open Head Channels 121033  TOTAL7287549123222344 Total gap ayacut to be stabilized / bridged is 3.13 Lakh Acres (57% of total ayacut of 5.49 Lakh Acres)Slide13

Sl.No

Targets

Physical

Financial

(Rs in

Crores

)

No of

Sources

Gap Ayacut to be

Stabilized

(In

Lakh

acres)

1

7287

3.13

2223

TARGETS OF BOTH PHYSICAL AND FINANCIAL DURING 2015-16

:

The above physical and financial targets will be achieved by taking up the repairs, restoration and renovation of Minor Irrigation sources under different programmes.

13

Total gap ayacut to be stabilized / bridged is 3.13 Lakh Acres (57% of

total

ayacut

of 5.49 Lakh Acres

Slide14

14

Unit

of Measurement is in Thousand Acres.

The progress as on 30-06-2015

is

37,000 Acres

(

37 Thousand

Acres)The progress as on 07-09-2015 is 36,330 Acres (36.33 Thousand Acres

)KEY PERFORMANCE INDICATORS: 

Irrigation of entire contemplated ayacut of 25.60 Lakh Acres.

Agricultural production which is output of irrigated agricultural system.

Economic benefits derived from the Agricultural production.

 

Sl. No.

Indicator

Unit of Measurement

April - June

July - September

October - December

January - March

Target

Progress

Target

Progress

Target

Progress

Target

Progress

1

Gap Ayacut to be Bridged under Minor Irrigation

in 000 Acres

31.3

3762.636.3393.9 125.2 Slide15

15

AYACUT STABILISED IN ACRES DUE TO

S NO

DESILTING OF TANKS

Taking up , repairs and construction of water harvesting structures

TOTAL

STABILISED UPTO 7/2015

AS

ON

07.09.2015

1

3622

552

4173

3376

807

2

3684

2367

6051

3990

2061

3

1926

530

2456

2077

395

4

1268

1188

2456

1468

97556829101478435330251364366986535243719897346215224984340815778289019534842248224009692846973961498591710326117455005156734411124823214569622183598121300452958281110475013749034501094041056908TOTAL4950623518730233700036330Slide16

16

ACTION PLAN FOR FIVE YEARS 2015-20

S.No.

District

All Schemes

No of Schemes

Total Aycut in Acres

Amount Rs in Lakhs

1

SRIKAKULAM

5766

355528

199054

2

VIZIANAGARAM

5469

319062

168939

3

VISAKHAPATNAM

3842

215450

139257

4

EAST GODAVARI

2150

151967

75915

5

WEST GODAVARI

1728

134167

78604

6KRISHNA120896567548247GUNTUR573.554251234668PRAKASAM1569.5119089628919SPSR NELLORE20641608228922310YSR KADAPA23741472307781911KURNOOL1106945433904912ANANTHAPUR26031406558632713CHITTOOR5853340826191884TOTAL36306233015612872511) Out of Total ayacut of 25.6 lakh acres during Five (5) years plan 23.3 lakh acres will be stabilized 2) Out of 23.3 lakh acres the Gap ayacut is 13.34 lakh acres i.e., 57%Slide17

Budget Estimate 2015-16

17

Rs. In Lakh

S.No

Head of Account

Budget 2015-16

1

Normal State Plan

 

a.

General

7476.05

b.

TSP

1905.50

c.

SCSP

1327.70

d.

MGNREGS Convergence

200.00

e.

Estab

. & Others

7700.75

2

NABARD

7273.80

3

AIBP

+RRR

8120.79

 

CE/MI Total 34004.594MD, APSIDC 15866.41CE MI Budget49871.00Slide18

18

Important activities to be undertaken under the Neeru-Chettu

sub-Mission:Inventory of existing water harvesting structures and repairs

needed.Construct new water harvesting structures using remote sensing

technology.

Construction of targeted recharge structures (roof water

harvesting, artificial recharge of aquifers and defunct wells).

Restoration of major, medium and minor irrigation systems

(repair of breach to structures and supply channels,

desilting of tanks).

Participatory Hydrological Monitoring (surface and groundwater)

for community water audit and crop water budgeting.

Promote sustainable water use by improved Irrigation and

Agricultural practices.Slide19

19

NEERU - CHETTU DAILY PROGRESS REPORT

DESILTING OF TANKS

Dt :

07-09-2015

S.

No.

District

Tanks having

ayacut

more than 100 Acres (MI)

Tanks having

ayacut

less than 100 Acres (PR)

Total No of Tanks

No. of Tanks

desilting

work in progress

Total Quantity of silt Excavated

No of excavators Deployed on

07-09-2015

.

Works taken by MI (By Machinery)

Works taken by Farmers (By Machinery)

Works Taken by RD (

Mannual

)

Total No of Tanks

by MI (Machinery)

by Farmers (By Machinery)

by RD(manual)

Total

Nos

NosNosNosNosNosNosCumCumCumCumNos12345678910111213141SRIKAKULAM91576398554164020012165292503707031515995655202VIZIANAGARAM944831892621780396241408914700923636410127834203VISAKHAPATNAM2323111334387028732960164220203652727529492904EAST GODAVARI 26312531516294111831253110017538491120000003485086145WEST GODAVARI335105413892501316134116183437025898611877329806KRISHNA248663911259824808219792740169144254060612024788107GUNTUR812132941344797011517762954965122792552952062808PRAKASAM33955189033062267260364445872537781246188794455309SPSR NELLORE722984170629901548184717862364011829701904533429910YSR KADAPA2341542177612115860598227815287100617575889643860

11

KURNOOL

157

454

611

194

0

6531

6725

4308061

0

2514830

6822891

18

12

ANANTHAPUR

303

2199

2502

568

3

653

1224

2571808

28740

982273

3582821

86

13

CHITTOOR

668

7395

8063

983

1

5542

6526

17846600

960

2744182

20591742

286

TOTAL

5441

35376

40817

3371

181

35186

38738

92112963

3332053

40689826

136134842

733Slide20

20

Status of Bills pertaining to Desilting

of tanks

Dated :-

07-09-2015

Rs In Lakhs

SI.No

District

BILLS PAID SO FAR

BILLS SENT TO PAO FOR PAYMENTS

TOTAL VALUE OF WORK DONE

1

2

3

4

5

1

Srikakulam

1776.43

182.63

1970.00

2

Vizianagaram

432.93

0.00

496.32

3

Visakhapatnam

500.43

0.00

547.48

4

East Godavari228.110.00249.515West Godavari4202.00246.004693.206Krishna3687.0068.004709.007Guntur1963.5143.392251.268Prakasam1423.00130.001868.939SPSR Nellore1081.92873.875180.0810Kadapa518.0071.00806.6411kurnool1043.0018.001249.3412Ananthapuram371.9140.40745.8213Chittoor4131.43488.407126.13Grand Total21359.672161.6931893.71Slide21

WORKS UNDER NORMAL STATE PLAN

21

Rs. In Lakh

Total Expenditure up to

31-08-2015

: Rs 20316.2 LakhsSlide22

22

Minor Irrigation - SCSP Works

Abstract of

Spillover Works permitted by Govt. to continue during 2015-16

Amount in Lakhs and Ayacut in Acres

Sl

Name of District

Works approved by Nodal Agency

and

Spillover to

2015-16

Works completed

Works in Progress

Remarks

Nos

Amount

Ayacut

Nos

Amount

Ayacut

Nos

Amount

Ayacut

 

1

2

3

4

5

6

7

8

9

1011121Srikakulam86380.20136383367.201314313.0049 2Krishna32280.97296226239.971940326.00977 3 works deleted.3Guntur12188.39678   12188.39678 4Nellore2129.40566   2129.40566 5Prakasam1469.992244629.99238840.002006 6Ananthapur29.20240   29.20240 7Chittoor25179.3792514119.50639636.08164 5 works deleted.8Kadapa63752.90357243352.94267620399.96896 9Kurnool169851.56119941277.22603157774.3411391  Grand Total4052841.98245441841186.8274102131616.3716967 Slide23

23

Minor Irrigation - TSP Works

Status

of Works approved by Nodal Agency during

2014-15 and Spillover to 2015-16

Amount in Lakhs and Ayacut in Acres

Sl

Name of District

Works approved by Nodal Agency during F.Y

2014-15

and 2015-16

Works completed

Works in Progress

Nos

Cost

Amount approved by N.A for 2014-15

Ayacut

Nos

Cost

Ayacut

Nos

Cost

Ayacut

1

2

3

4

5

6

7

8

9

1011121Srikakulam66466.70466.70190018114.9850948351.7213912Vizianagaram122790.31309.66337700.000122790.3133773Visakhapatnam3161.4080.00890137.001402124.47504East Godavari1471620.09612.162149854239.086478931381.01150205West Godavari158616.90215.80583800.000158616.958386Guntur219.4719.4713300.000219.471337Prakasam24117.82117.821160627.762581890.069028Ananthapur28.608.604800.00028.6489Chittoor41248.48249.921409837.3734733211.11106210Kadapa46375.37375.372373986.6645637288.711917 Grand Total35814425.142455.503862696542.85818826213882.2930438Slide24

24

Sl. No.

Tranche No.

year

District

No of Schemes

Amount of Estimate

Rs. in

lakhs

Ayacut in Ha

Expenditure Rs. in

lakhs

Remarks

1

XVI

2010-11

Chittoor

7

2778.85

1939.08

1122.78

Work proposed for conversion

under NSP vide T.O

lr.No

. DCE-I/OT3/T3/NABARD- XVI & XVII/Dropping /2015

Dt

: 21.08.2015

2

XVI

2010-11

Kurnool

2

806.01

464.18157.843XVII2011-12Srikakulam1482.55341.97178.664XVII2011-12Vizianagaram1350.00 291.380.00Total: 114417.413036.611459.28 WORKS UNDER NABARD SCHEME (TRANCHE XVI & XVII)Slide25

25

WORKS UNDER NABARD SCHEME (TRANCHE XX)

Sl. No.

District

No. of Schemes

Amount of Estimate

Ayacut in HA

No of works

Rs. in Lakhs

Agreement concluded and works started

Tenders

finalized,

Agency

finalized

Agreement to be concluded

Estimates sanctioned and tender process in progress

Technical sanction to be accorded

1

Anantapuramu

15

1174.55

1165.06

11

 

1

3

2

Chittoor

14

2199.15

2510.74

10

2

2 3YSR Kadapa 81895.901508.6333114Kurnool 21139.69556.411 1 5Nellore 2139.0060.002   6Prakasam 3135.42115.003   7Krishna 21754.88970.22   28West Godavari 21342.001640.001 1 9Srikakulam 1975.00950.001   TOTAL4910755.599476.0632566Slide26

26

WORKS PROPOSED UNDER NABARD SCHEME (TRANCHE XXI)

Sl. No.

District

No. of Schemes

Amount of Estimate

Ayacut in HA

Remarks

Rs. in Lakhs

1

Chittoor

3

1094.300

2083

Proposal

were submitted to the

Finance

Dept vide T.O

Lr.No.

DCE-I/OT3/T3/NABARD-XXI/2015 Dt. 21.08.2015 for

sanction.

2

Visakhapatnam

1

111.500

324

3

Srikakulam

2

1296.000

501

4

Krishna

4610.0002525Ananthapur19893.0006066Kurnool176.0001217Prakasam4699.00010178Vizinagaram2320.0009979SPSR Nellore190.00024610Guntur2263.00040211Kadapa2242.000115 Total 415694.8006665 Slide27

27

ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP)

Rs. In Lakhs

Sno

.

 

District

 

Sanctioned

Completed

Works in progress

No. of Schemes

Cost

year

IP Proposed in acres

No. of Schemes

Cost

year

IP Created in acres

No. of Schemes

Status

 RAYALASEEMA

1

Kurnool

1

307

2009-10

637

 

 

 

 

1Head works completed, Canal works are under progress2Chittoor 13802008-0913101549.372010-111310   Sub Total 2687 19471549.4 13101 ANDHRA  3Visakhapatnam 12802007-085881230.76 588  4West Godavari 124102008-093967    1Work is in progress5Prakasam 544802008-09122352374.122009-1021343Work are under progress Sub Total 77170 167903604.9 27224  Total of Andhra & Rayalaseema 97857 1873741154 40325 Minor Irrigation - Centrally Sponsored Schemes Slide28

2

8

Minor Irrigation - Centrally Sponsored Schemes

REPAIRS, RENOVATION & RESTORATION (RRR

)

Sl. No.

District

Sanctioned

Completed

Balance Works

No. of Schemes

Cost

Year

Agt. Value

IP

Stabilizati--on

in

acres

No. of Schemes

Cost

Year

IP Stabilized in acres

No. of Schemes

Status

Rayalaseema

1

ATP

138

2898

2011-12

1942.8434337.1411815642013-14 & 2014-15 268772017-Progress3-Terminated2CHT5617992011-121275.1610613.614910282013-14 8732 7Works are in progress 3KDP4714392011-12767.3812435.46444772013-14 8681 3Works are in progress 4KNL7826452011-121574.0937229.40609582013-14 & 2014-15 23649 188-Progress5-Terminated5- To be terminated Sub Total 3198781 5559.4794615.612714027 6793948  Andhra 5SKLM233642011-12277.726216.17202332013-14 5,589 3Works are in progress  Sub Total 233642011-12277.726216.17202332013-14 5,589 3 Total of Andhra & Rayalaseema 34291455837.19100831.7829142607352851 Slide29

Andhra Pradesh Irrigation and Livelihood Improvement Project (APILIP)

Objectives

To increase agricultural production by constructing and rehabilitating irrigation facilities.

Improving water management and agriculture practices, enhancing agricultural income.

Alleviating the poverty.

Project Scope

Construction of new Minor irrigation Tanks : 1 No. (Prakasam District).

Formation and Capacity Building of Project Water User Associations

Support to Sector Reform (Trainings to Engineering staff)

Consultation Services ( Nippon Koei company Ltd, Japan company (3

rd

party quality control))

29Slide30

The Project commenced with effect from 1

st April – 2007.

Loan Disbursement is upto July – 2016.

AP outlay for Minor Irrigation Rs. 2.32 Cr.AP Government agreed extension of the project

upto

March-2016 and addressed the

GoI

.

Project consists of 1 new Minor Irrigation Project for creation of Irrigation Potential 272 Acres.

30

APILIP –

Andhra Pradesh Irrigation and Livelihood Improvement Project

Status

District

No. of Projects

Ayacut (Acres)

Amount

Rs. in Cr.

Status

PRAKASAM

Formation of New Tank at

G.Mekapadu

,

Byyanapalem

(V)

Kandukuru

(M)

1

272

2.32

Head Works and Canals completed.

Field Channels are in progress Slide31

31

PROJECT DEVELOPMENT OBJECTIVE

Selected tank based producers improve agricultural productivity and water user associations manage tank system effectively

Rehabilitation of 975 MI tanks in A.P (2007-2016).

Project outlay is Rs. 462.40

crs

, for AP

Restoration of about 2.98

lakh

Ac.

Spread over 12 districts.

Andhra Pradesh Community Based Tank Management Project

Dist.

No. of Tanks

Works completed

Works on Going

ATP

142

130

12

CTR

165

160

5

EGD

17

17

0

KDP

63

63

0

KRI

95887KNL 44359NLR 1271189PKM 38353SKL 823547VSP 906525VZM 996336WGD 13130TOTAL975822153Slide32

OVERVIEW (APCBTMP)

Approx. Project outlay is Rs. 462.40

crs

. for the residual state of Andhra Pradesh.

Project commenced in July’ 2007 and extended up to July’2016.

Civil Works for 975 tanks

approved for Rs. 343

crs

.

to stabilize ayacut of 3.01 lakhs acres in

12 Districts.

Out of 975 tanks ,

822 Tanks

work completed and

698 tanks

were handed over to WUA for future maintenance.

Cumulative expenditure is

Rs.364.97

Crs

(Up

to August 2015

).

BE for FY

2015-16 is Rs. 84.50

Crs

. Expenditure during the year 2015-16 is Rs. 8.13

Crs

upto

August 2015.

32Slide33

MGNREGS Convergence

Programme

Out of total 2364 works grounded ,

1155nos

of works are completed.

387

Nos

of works are in progress and 822

Nos

of works are not grounded, necessary relaxation orders on Finance Department UO Note Dated 12.08.2014 for all the works are awaited from the Government.

Sl. No

District

No. of Works

Works Completed

Balance works

Tank Nos

Cost Rs in Lakhs

Ayacut in ac

Tank Nos

Cost Rs in Lakhs

Tank Nos

Cost Rs in Lakhs

1

Vizianagaram

290

734.75

8616.21

138

255.26

152

479.492Visakapatnam22173.95237114112.30861.653East Godawari58580232000585804West Godawari3343704.0113902.78147794.791872909.225Krishna1841761.4418842.831401054.2744707.176Guntur73883.4510301.353629.7420253.717Prakasam71506.494613.0341306.4430200.058Nellore2511823.8313611741429.7777394.039Chittoor3883605.72327432622262.72126134310Kadapa4274603.962135050478.93774125.0611Anantapur1911406.897395.63136847.2855559.6712Kurnool75545.6248750075545.62 Total236420330.08158691.811558171.47120912158.6133Slide34

MEMOIRS OF SMALL TANKS

Over View

About 35,376 No of small tanks having ayacut less than 40 Ha ( <100 Acres) all over Andhra Pradesh are transferred from Panchayat Raj Department to Minor Irrigation Department vide G.O. Ms. No. 216, PR & RD ( PROGS I) Dept Dt.13.6.2005.

Government has decided to prepare Memoirs of these small tanks

( <100 Acres)

as there is any permanent record on these tanks. It is proposed to take up Memoirs work in two phases i.e. (

i

) 10 – 40 Ha ayacut in First Phase and (ii) less than 10 Ha ayacut in second phase. The Government vide G.O. Rt. No.1157, I & CAD ( MI.IV) Dept, Dt. 14.7.2009 has given Administrative Approval for Rs.14.84

Crore for preparation of Phase-I Memoirs of 12,977 tanks by way of outsourcing.

The Memoirs work was entrusted to 11 Agencies in 13 districts of Andhra Pradesh in Phase – I. The work is nearing completion and information regarding 9,659 tanks were uploaded by APSAC in their website as a part of TIS Project.

Government vide G.O.

Rt

No.287 I&CAD (MIG-I) dept dt.18.03.2013 has given administrative approval for Rs.23.11 crore for preparation of Phase-II memoirs of 22,399 tanks in second phase by way of outsourcing. The work is entrusted to 6 agencies and the same is under progress.

34Slide35

MEMOIRS OF SMALL TANKS

35

Rupees in Lakhs

Sl. no

.

Phase

Sanctioned

Completed

Progress

No. of Tanks

Cost of Memoirs

No. of Agencies entrusted

No. of Tanks

Cost of Memoirs

No. of Tanks

Cost of Memoirs

1

Phase - I having ayacut 10 to 40 Ha.

12977

1484

11

9435

914

3542

570

2

Phase - I having

ayacut

<

10 Ha.

22399

2311

6

  223992311 TOTAL353763795169435914259412881Slide36

Development of Tank Information System

(TIS)for Andhra Pradesh through APSRAC

Over View For Development of Tank Information System (TIS) in the State of Andhra Pradesh through Andhra Pradesh State Remote Sensing Applications Centre, Hyderabad administrative approval accorded vide G.O.Ms.No. 139 I & CAD (

MI.Genl) Dept.Dated:16-09-2011 under Normal State Plan Funds within the budget provision of M.I. for Rs.598.65 lakhs

(Rupees Five hundred ninety eight

lakhs

and sixty five thousand only

). (Rs.347.22 Lakhs

for Residual A.P +Rs.251.33 Lakhs for State of Telangana ). The main objective of the study is to develop and compile natural resources information related to catchment and command areas of tanks in Andhra Pradesh on 1:50,000/1:25,000 scale and assessment of run-off in each tank catchment using remote sensing, GIS and GPS techniques.

Accordingly technical sanction was accorded for Rs 598.65 Lakhs in C.E/M.I, Further the

MoU

was concluded with the Director (Technical) of APSRAC, Planning Department, Govt. of A.P, Hyderabad

36

Tank Information System – Status

Rupees in Lakhs

Sanctioned

Completed

Progress

No. of

MI & PR Tanks

Cost of Project

No. of

MI & PR Tanks

Cost

No. of

MI & PR Tanks

Cost

41076

347.22

9789

86.8

31287

260.42

41076347.22978986.831287260.42Slide37

Objective :

It is proposed to study linkage of tanks i.e., Cascade system and to identify new tank sites using Remote Sensing.

The Govt. Vide G.O.Ms,No.17, Dt: 31-01-2012 has sanctioned an amount of Rs. 24.93

Crore for preparation of Preliminary Project Report (PPR).

Under this programme 5 Districts covered for preparation of preliminary project reports.

1)

Vizainagaram

2) Visakhapatnam 3)

Chittoor 4)

Srikakulam 5) Anantapur

TRAID project will cover tank reliant areas of the State. Initially

Chittoor

district has taken up on pilot basis for preparation of Tank cascade system development.

The PPR preparation for five districts was entrusted to M/s APSRAC vide G.O.Ms.No.17, dt:31-01-2012. The Government has issued an administrative approval for Rs.2493.82 lakhs for preparation of PPR for 5 districts.

The M/s APSRAC has prepared draft preliminary project report (PPR) for 3 districts viz.,

Chittoor

, Anantapur and Srikakulam and Rs. 4

crore

paid to APSRAC as an advance for preparation of PPRs.

TRIAD (TANK RELIANT IRRIGATED AREA DEVELOPMENT)

37Slide38

38

Representation for works received from Public Representatives

ABSTRACT

Sl. No.

District

No. of Works

Amount

Rs. in Lakhs

1

Anantapuramu

322

17,445.33

2

Chittoor

420

19,604.96

3

East Godavari

3

5,169.20

4

Guntur

4

234.55

5

Kadapa

10

139.49

6

Krishna

53

2,435.75

7

Kurnool2 135.25 8Nellore142 2,323.36 9Prakasam357 13,050.36 10Srikakulam25 237.18 11Visakhapatnam72 3,086.62 12Vizianagaram40 551.34 13West Godavari43 363.19  TOTAL:149364776.58(or) Rs. 647.77 croresSlide39

39

Thank You