Jose Botelho Direito ENCVDC Thermosyphon cooling workshop 5 Thursday October 20 2011 Outline Technical Requirements Request for Quotation Design from DATE Construction Schedule 20102011 ID: 245215

2011 cooling workshop thermosyphon cooling 2011 thermosyphon workshop condenser 2012 brine technical construction requirements tubes 1134974 number document superheating

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Condenser supply contract report" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Condenser supply contract report

Jose Botelho Direito EN/CV/DCThermosyphon cooling workshop §5Thursday, October 20, 2011Slide2

Outline

Technical RequirementsRequest for QuotationDesign from D.A.T.E. Construction Schedule

20/10/2011

Thermosyphon cooling workshop §5

2Slide3

Technical Requirements

Thermal Requirements:Total

Condenser cooling power: 170kWDe-superheating: 28.7 kW

Condensing: 135.8 kWSub-cooling: 5.5 kW

DO-26673/EN-CV – EMDS document number 1134974

20/10/2011

Thermosyphon cooling workshop §5

3Slide4

Technical Requirements

Stainless Steel Shell and Cupronickel or SSt cooling tubesFOAMGLAS InsulationStorage capacity of 2.5m3Pressure: PN25Design temperature from -70°C to 63°C

Leak tightness of 10-4mbar.lt/s

Standards:Pressure Equipment Directive 97/23 (PED)Leak tightness: BS EN13184:2001Cleaning: ASTM A380Earthquake loading: EUROCODE 8

20/10/2011

Thermosyphon cooling workshop §5

4Slide5

Request for Quotation

Companies contacted (11x):AEL (de); KLIMAL (de); ALFA LAVAL (se); APPARETEBAU-CRIMMITSCHAU (de); ARSOPI (pt); BOWMAN (uk); D.A.T.E. (fr);

Novoa Equipment Limited (uk

); Onda (it); SWEP (se); GEA (de).Offers received (3x):

D.A.T.E.

ARSOPI

GEA

DO-26673/EN-CV – EMDS document number 1134974

20/10/2011

Thermosyphon cooling workshop §5

5Slide6

Design proposal from D.A.T.E.

20/10/2011Thermosyphon cooling workshop §5

6

DESUPERHEATING and CONDENSATION ZONE

SUBCOOLING ZONE

HEAT TRANSFER COEFFICIENT

299,65 W.m.

-2

°C

-1

112,8 W.m.

-2

°C

-1

HEAT TRANSFERT SURFACE

86,85 m

2

9,07 m

2

PRESSURE DROP

6 mbar

10 mbar

NUMBER OF TUBES

240 tubes

28 tubes

Thermosyphon C3F8 Liquid outlet

Thermosyphon C3F8 Vapour inlet

Brine Condenser IN

Brine Condenser OUT

Brine Sub

-

cooler IN

Brine Sub

-

cooler OUT

De-superheating & Condensing tubes (240x)

Sub-cooling tubes (28x)Slide7

Construction Schedule

Condenser Construction ScheduleOctober 2011: Contract startNovember 2011: Detailed designJanuary 2012 : Purchasing of materialMarch 2012: Condenser construction

April 2012: Final pressure testsApril 2012: Insulation of the condenser

April 2012: Delivery at CERN20/10/2011

Thermosyphon cooling workshop §5

7Slide8

Any questions?20/10/2011Thermosyphon cooling workshop §5

8