Download Presentation The PPT/PDF document "New York City Master Plan Update NYC Ma..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
New York City Master Plan Update
NYC Master Plan Goals 2 Create a distinct identity for Lubin at 1 Pace Plaza – our flagship buildingCreate a distinct identity for Dyson at historic 41 Park RowCreate a new student center for student successCreate a new exterior identity for 1 Pace PlazaCreate new forms of learning and research spaces WWW.PACE.EDU/NYC-MASTER-PLAN
Phase 1 - The Student Landscape Address the first impressions of the campus, improve visitor and student experience Renovate first floor (west) of One Pace Plaza to create a new Student Union, study areas, and student commons; a new Welcome Center and Spirit Store; new Lubin branded entrance through the courtyard on B-Level with a Lubin learning lab and new Admissions Suite. Design renovations to the Plaza including stairs, ramps, plantings39 Spruce Street Entrance 1 Pace Plaza – Lubin Lobby, Grand Staircase
Phase 1 - The Student Landscape Renovate lower level and 1st and 2nd floors of 41 Park Row to create a new art gallery, student commons, Dyson advising suite and faculty colloquia 441 Park Row – 1st Floor Commons41 Park Row – Art Gallery
Phase 1 – Construction Update1 Pace Plaza and 41 Park Row curtain wall installation has been completed Terrazzo flooring is complete at 1 Pace Plaza Enrollment Management Suite - glass fronts and partitions is in place1 Pace Plaza 1st Floor glass fronts and partitions are in placeNew stair and plaza construction is underwayFire Alarm Installation at 41 Park Row is underway. Fire installation in 1 Pace Plaza complete Ceiling lighting fixtures installation is in progressCourtyard pavers installation is completeUpcoming Milestones9 Spruce Street Entrance changesBowtie Ceiling Construction at 1 Pace Plaza 1 Pace Plaza Inspections AV, Signage and Furniture Installations 5
Phase 1 - Construction Schedule6 Upcoming In Progress Completed
7 1 Pace Plaza, 1st FloorOctober 2018
81 Pace Plaza, 1 st Floor, Student UnionOctober 2018
91 Pace Plaza, 1 st Floor, Study NooksOctober 2018
10 1 Pace Plaza, Lubin EntranceOctober 2018
11 1 Pace Plaza, Lubin LobbyOctober 2018
12 Enrollment Management SuiteOctober 2018
13 Enrollment Management SuiteOctober 2018
1441 Park Row 1 st Floor Art GallerySeptember 2018
1541 Park Row 2 nd floor Lounge AreaSeptember 2018
1641 Park Row 2 nd floor Dyson ColloquiaOctober 2018
1741 Park Row 2 nd floor Advising SuiteOctober 2018
181 Pace Plaza , Entrance ChangeOctober 2018
AppendicesRenderings 19
1 Pace Plaza Student Landscape20
1 Pace Plaza First Floor Entrance and Donor Wall 21
1 Pace Plaza First Floor Student Center22
1 Pace Plaza First Floor Student Commons23
1 Pace Plaza First Floor Student Collaborative Study Area 24
1 Pace Plaza First Floor Welcome Center25
1PP Lubin Lobby and Admissions Suite 26
1 Pace Plaza Lubin Entrance 27
28Grand Stair connecting B level and 1 st floor
One Pace Plaza Lubin Graduate Lounge 29
30Lubin Virtual Lab
41 Park Row Exterior31
41 Park Row First Floor and Lower Level32
41 Park Row First Floor33
41 Park Row Art Gallery34
41 Park Row Second Floor35
41 Park Row Second Floor – Dyson Commons36