/
IBL – IBL –

IBL – - PowerPoint Presentation

sherrill-nordquist
sherrill-nordquist . @sherrill-nordquist
Follow
373 views
Uploaded On 2017-05-08

IBL – - PPT Presentation

UniGe involvements UniGe Team G Barbier F Cadoux A Clark S Débieux D Ferrère C Husi G Iacobucci M Weber Other member KEK Y Takubo Currently opened LD position ID: 545997

stave loading daq integration loading stave integration daq ibl tests electrical work test unige pipe jigs cooling system activity

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "IBL –" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

IBL – UniGe involvements

UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. WeberOther member (KEK): Y. Takubo Currently opened LD position: research engineer to work on IBL QA and commissioning

Participation to IBL MB: F. Cadoux (WG3 – Integration-Installation) , S. Débieux (WG4 – Off-detector) Work involvement in: - Integration, beam pipe installation, IST - Stave to beam pipe integration - Loading and QA - Commissioning

UniBE

UniGe

IBL-Upgrade kickoff meeting Slide2

Near Future Events IBL general meeting

8-10 June 2011 at CERNhttps://indico.cern.ch/conferenceDisplay.py?confId=135834Involvements:WG2: Stave – O. Rohne, E. Vigeolas UniGe: Talk about loading activityWG3: Integration & Installation - R. Vuillermet, F. Cadoux UniGe: Talks about integration, IST, … WG4: Off-detector - T. Flick, S. Débieux

UniBe: Talk about RX plugin LHCC Upgrade Session 14 June 2011https://indico.cern.ch/conferenceDisplay.py?confId=141306Talk proposed by G. Darbo to D. Ferrère about IBL Technical Progresses

Vertex 2011

19-24 June 2011 Austria

http://vertex2011.hephy.at/

Talk from F.

Cadoux

about “Novel material for tracker experiments”

Others?Slide3

Module assembly site(s)Stave & flex circuit assembly site(s)

QA doneStave loading site

Reception tests

Visual inspection, electrical tests

Visual inspection, leak tests, metrology of references

Loading

Metrology

Wire bonding

Electrical tests - cold

Thermal cycling

Electrical tests - cold

Rework?

Storage

Rework?

Rework?

Wing gluing

Rework?

QA done

Electrical test?

Pull test

?

Shipment Transport

Shipment Transport

What type?

Connectivity tests at PP0?

Is it required?

Loading Activity – Flow Diagram (Not frozen yet)

High chance to be at

UniGe

USBPix

Seabas

DAQ system

Mitutoyo

Trained personal

Need a new climate chamberSlide4

Loading Activity and QA before Integration Questions today to IBL community:

What DAQ shall we use for Stave Electrical Characterization? Adaptation of USBPIX, a DAQ close to ROD-BOC, or another readout system?  None identified so far working on this and USBPIX experts are improving the software/firmware DAQ for individual FE module readout.  Y. Takubo is a DAQ firmware and software expert with Seabas FPGA board (KEK) Is it enough to do electrical tests and QA by warm cooling with water and later test at CERN SR1 with CO2 plant before integration to beam pipe?What to do for us: Work preparation for possible loading at UniGe:

Loading tools to be qualified. Done on short staves but work is progressing toward full length CFRP handling jigs (1 per stave) to be designed and fabricated and will follow the life of the stave from loading to the integration Tools for wire bonding and pull test in addition to the qualification work Metrology tools and program to be made under the Mitutoyo dual probe (touch/vision) Test system to be setup with temporary PPs attached to PP0  a lot of work is expected there but depends of the DAQ choiceSlide5

Loading Activity – 3D Models

Loading activity currently under investigation: Short stave prototypes - Done Full length stave – under progressNeed to investigate:Handling frame Loading and wing attachment jigs Bonding jigs

Wire pull test jigs Metrology jigs and program Test box and PPs for the electrical QA Slide6

From Integration to Commissioning TestsClean the cooling pipe by doing a liquid/

gaz flowMake a stave reception test with CO2 cooling with DAQ system in SR1Remove the temporary PP for each of the staves at the 2 endsExtend the cooling pipe by Brazing technique (baseline)Mount every stave on the beam pipe with proper integration tools (also done by UniGe)Make the electrical connection to type 1 services at PP0Move the all IBL into a cold test boxMake the electrical connection at PP1 with temporary PPConnect all the cooling fittings and check for leaksPower and monitor the temperature, supply and current on the modules

Run the final DAQ system by doing basic calibration tests If time allows it make a physics run with cosmic raysNB: DCS and DAQ systems should be the final version to be used for ATLAS operation All of this is a lot of work in various field to commission the all IBL and therefore would require a non negligible work anticipation for this

Related Contents


Next Show more