EN-HE LS2 activities Damien Lafarge, EN-HE EN-HE LS2 activities Damien Lafarge, EN-HE

EN-HE LS2 activities Damien Lafarge, EN-HE - PowerPoint Presentation

spottletoefacebook
spottletoefacebook . @spottletoefacebook
Follow
343 views
Uploaded On 2020-06-24

EN-HE LS2 activities Damien Lafarge, EN-HE - PPT Presentation

Agenda Lifts Lifting equipment Special vehicles MAFI Lifts overview Lifts draft schedule Lifts Refurbishment of PM45 lift being studied Location Replacement Dates Comment PM85 18 ID: 786382

route 2019 yets previous 2019 route previous yets ls2 lift 2018 capacity pm54 lifts lhc tbc 2020 comment dates

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "EN-HE LS2 activities Damien Lafarge, EN-..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

EN-HE LS2 activities

Damien Lafarge, EN-HE

Slide2

Agenda

Lifts

Lifting equipment

Special vehicles // MAFI

Slide3

Lifts - overview

Slide4

Lifts – draft schedule

Slide5

Lifts

Refurbishment of PM45 lift being studied.

Location

Replacement Dates

Comment

PM85

18

Dec.

2017 - 23

Feb.

2018 (YETS)

Route via PZ85

PM54

March 2018 – May 2018 (Run 2),

tbc

Route via temporary worksite

lift in PM54

PM15

18

Feb.

2019 – 26

Apr.

2019

Route via PM18 ? TBC

PM25

15

Jun.

2020 – 21

Aug.

2020 (TBC)

Route via PX24

PM76

15

Apr.

2019 – 05

Jul.

2019

No access to Pt7

PZ33

10

Dec.

2018 – 04

Mar.

2019

No access to Pt3

PZ45

24

Jun.

2019 – 30

Aug.

2019

Route via PM45

PM56

01

Apr.

2020 – 09

Jun.

2020

Route via PM54

PM65

19

Aug.

2019 – 25

Oct.

2019

Route via PZ65

Slide6

Lifting Equipment

Location

What

Dates

Comment

UL54

Installation

of a 3 t lifting platform

5 weeks, YETS

or very beginning of LS2

For handling in LHC machine through PM54 lift. ECR launched.

UXC55

Installation of a second overhead crane in the CMS cavernTBC, YETS or LS2 – 4 weeksInstallation of a second crane in the CMS cavern

Slide7

Special vehicles // MAFI

Location

What

Dates

Comment

LHC tunnel

Refurbishment of the guiding line

TBC, LS2 or YETS – 4 weeks or 2-3 days per

arc

Black paint to be “repaired”, white tape to be replaced. Mandatory before any magnet removal.

UXC55

Repair of

the power supply rails in sector 3-4TBC, LS2 or YETS – 2 weeksMandatory before any magnet removal in sectors 3-4, 4-5, 5-6

Slide8

Slide9

Status of 1st lift - PX24/ALICE

LHC CSAP #35 - EDMS n°1823309 - Damien Lafarge

9

Capacity (t)

Capacity (persons)

Speed (m/s)

Time to Travel

Previous

New

Previous

New

Previous

NewPreviousNew0.63

1

8

13

1

2

1’05’’

0’38’’

Slide10

Capacity (t)

Capacity (persons)

Speed (m/s)

Time to Travel

Previous

New

Previous

New

Previous

New

Previous

New

1213172,52,5

70 sec.

60 sec.

Status

of 2nd lift – PZ85/LHCb

LHC CSAP #35 - EDMS n°1823309 - Damien Lafarge

10