Capstone Project: Drift Capstone Project: Drift

Capstone Project: Drift - PowerPoint Presentation

tatiana-dople
tatiana-dople . @tatiana-dople
Follow
451 views
Uploaded On 2016-07-31

Capstone Project: Drift - PPT Presentation

Trike Max Gundrum Popular ideas Video of Drift Trikes Trike Video Drift Trikes Student Documentary Film Motorized Drift Trike Battles Basic Dimensions Video on Trike design ID: 426514

trike day drift bike day trike bike drift blueprint hours needed designs basic 2013 prep video welder project looked start frame materials

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Capstone Project: Drift" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Capstone Project: Drift Trike

Max

GundrumSlide2

Popular ideasSlide3

Video of Drift Trikes

Trike

Video

Drift

Trikes - Student Documentary Film Motorized Drift Trike Battles Slide4

Basic Dimensions

Video on

Trike

designBasic design found on the internet:Slide5

TurboCAD BlueprintSlide6

Prep for Building

Example of bike used

Example after bike is cut downSlide7

Buliding Of Trike

Tools neededSlide8

Work Journal (Starts 4/30/2013)

Work Journal (Starts 4/30/2013)

Day 1: Research of designs and ideas of drift

trike

Day 2: Found designs and plans onlineDay 3: Watched videos to see popular designsDay 4: Looked for a bike to use for the projectDay 5: Looked for pricing of parts and materials neededDay 6: Found basic dimensions and basic welding techniquesDay 7: Started on

TurboCAD

blueprint

Day 8: working on blueprint

Day 9: Finished blueprint

Day 10: Start prep for cutting bike frame/ getting tools needed

Day 11: Start Building (5/20/2013)

Day 12: started cutting bike frame

Day 13: Welder was not working properly

Day 14: Went and found approximate cost for all materials

 

Day 15

:**FOUND THAT THE WELDER NEEDED REPAIR

*

Plans once welder is fixed/replaced

2-4 hours of fabricating and welding metal

2-3 hours of fixing and flaws/ solving problems

1-2 hours of final assembly

~1 hour of final testing, make sure all adjustments are made

1-2 hours of prep for paint and painting

FINISH PROJECT WITHIN 10 DAYS