PDF-Submarine Power Cables

Author : tatyana-admore | Published Date : 2015-11-05

2 Short circuit TestingTesting at the factory is done according to the specied national or international standards and furthermore in strict accorHigh voltage laboratory

Presentation Embed Code

Download Presentation

Download Presentation The PPT/PDF document "Submarine Power Cables" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Submarine Power Cables: Transcript


2 Short circuit TestingTesting at the factory is done according to the specied national or international standards and furthermore in strict accorHigh voltage laboratory partial discharge cables. 001 0 001 00001 10 10 10 10 10 10 Screening perf or mance of va ious types of screen constr uctions 55 65 75 85 95 105 115 125 135 145 155 165 175 EM Shielding eff ectiv eness dBmeter requency Hz Surf ace transf er impedance mohmsmeter Aluminiz ed o have demonstrated the need for reliable electrical installation resistant to fire and able to operate during a fire without propagating it The use of correct electrical installation makes evacuation of buildings easier minimizes the element of panic 1. 2. Always use a gage kit after making a cable to ensure the pin and the dielectric of the SMA connector are in spec. . Maury Microwave #A027A gage kit. Belden #1673A 0.141” o.d. conformal cable. Outline. Mission of the Submarine Force. History. Operations/Mission. Platforms. Combat Systems. Mission of the Submarine . Force. As stated by the CNO's Submarine Warfare Division, the U.S. Submarine Force has several goals: . Sunil Bhat. Types of Cables. Low voltage power and control cables.  . . electrical cables that typically have a voltage grade of 0.6/1 kV or below.. Low voltage instrumentation cables.  . cables . iTOP. Each . boardstack. (1/4 module) requires three LV power inputs. “RAW1”: 1.87V at 14.5A (mostly for FPGA core). “RAW2”: 3.15V at 13.2A (mostly for IRSX ASIC’s). “RAW3”: 4.33V at 5.1A (mostly for preamplifiers). LDO/CWO Applicant Brief. . PERS 422. and. PERS 422A. What is a Limited Duty / Chief Warrant Officer. Why become a LDO / CWO. Eligibility requirements (NAVADMIN 140/14) - . Mid June. Designators. Typical profile / common characteristics of a selectee. Preview. SC-2 May 12, 2014. Robert Konnik. Title. Title changes: Delete Class 1E, Delete “Field” before splices, and change nuclear power generating stations to nuclear facilities.. Deleting Class 1E is to be consistent with changes being proposed in IEEE P60780-323.. By clearly identifying the arctic risks to submarine cables, the telecoms industry will hopefully be better prepared for future projects.. The technical means to reduce risks are available to the cable industry but the careful study of the project route initially through desk top study and site visit activities is essential. Done well, these activities will ensure key project decisions at an early stage are made on an informed basis and lead to a well-engineered and crucially, a reliable cable system.. Where we are today…. Integrated 2 OHIO Class submarines (4 crews) with enlisted women. Completing missions in every theater around the world. Next submarine to begin integration this fall. Committed to integrating VA-Class (fast attack) submarines starting 2021. 13. /03/2018. Patrick Lelong EN-EL-FC. EDMS: 1907977. YETS17-18 PS cabling. . 13. /03/2018. Patrick Lelong EN-EL-FC - . EDMS: . 1907977. N° . PLAN. Action. OSVC. (Provisional). Contact. YETS. 2017-2018. 20. /03/2018. Patrick Lelong EN-EL-FC. EDMS: 1907977. YETS17-18 PS cabling. . 20. /03/2018. Patrick Lelong EN-EL-FC - . EDMS: . 1907977. N° . PLAN. Action. OSVC. (Provisional). Contact. YETS. 2017-2018. NLNG Train 4, 5 and 6. More than 800km of Power , instruments cables. OML 58 PHASE 1. 400km of power, instrument and control cables. AKPO Field . Devt. project. 40km of power cables . Heritage Building Project. Generated from Near-Shore Faults . (M. Legg). Generated from Subaerial and Submarine Landslides . (Synolakis, Borrero, Watts). Large scale near-shore slumps. Failure of sediment in submarine canyons.

Download Document

Here is the link to download the presentation.
"Submarine Power Cables"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.

Related Documents