1 Environment Clearance (EC) for Expansion of
1 / 1

1 Environment Clearance (EC) for Expansion of

Author : liane-varnes | Published Date : 2025-06-20

Description: 1 Environment Clearance EC for Expansion of Crude Steel Production from 22 MTPA to 45 MTPA and Cold Rolling Mill from 16 MTPA to 26 MTPA within the existing Premises by Jindal Stainless Limited Kalinga Nagar Industrial Complex Tehsil

Presentation Embed Code

Download Presentation

Download Presentation The PPT/PDF document "1 Environment Clearance (EC) for Expansion of" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Transcript:1 Environment Clearance (EC) for Expansion of:
1 Environment Clearance (EC) for Expansion of Crude Steel Production from 2.2 MTPA to 4.5 MTPA and Cold Rolling Mill from 1.6 MTPA to 2.6 MTPA within the existing Premises by Jindal Stainless Limited Kalinga Nagar Industrial Complex, Tehsil : Danagadi, District: Jajpur, Odisha Consulting Engineers : M. N. Dastur & Co. (P) Ltd. NABET/EIA/1821/RA 0131 -- 2 BRIEF INFORMATION 3 BRIEF INFORMATION 4 LOCATION MAP 5 KML FILE AND GOOGLE EARTH IMAGE 6 TOPOGRAPHICAL MAP 7 LAND ALLOTTED/ACQUISTION STATUS Total Land area under JSL – 1080.18 Ac. The proposed Project does not require any additional Land. The Project will be set up within the available vacant Land area of 320.18 Ac. Details of Land use area : 8 PREVIOUS EC DETAILS EC granted on : 1. “Expansion of Stainless Steel Production from 0.8 to 2.2 MTPA and Cold Rolling Mill from 0.8 to 1.6 MTPA located at Kalinga Nagar Industrial Complex, Danagadi near Duburi in Jajpur District of Odisha”. Env. Clearance No. & Date : J-11011/281/2007-IA-II(I) dated 18.09.2019 2. “ Integrated Stainless Steel Plant (1.6 MTPA) located in Kalinga Nagar Industrial Complex, Duburi Dist. Jajpur , Odisha”. Env. Clearance No. & Date : J-11011/281/2007-IA-II(I) dated 17.05.2018 3. “Modification – cum – Expansion of Integrated Stainless Steel Plant (1.6 MTPA) Kalinga Nagar Industrial Complex, Duburi Dist. Jajpur , Odisha” Env. Clearance No. & Date : J-11011/281/2007-IA-II(I) dated 01.11.2007 4. “4 x 125 MW Captive Power Project at Duburi, District Jajpur, Orissa ”. Env. Clearance No. & Date : J-11011/757/2006-IA.II(T) dated 30.11.2006 5. “1.6 MTPA Integrated Stainless Steel Plant” Env. Clearance No. & Date : J-11011/155/2005-IA II (I) dated 05.08.2005 9 PREVIOUS EC DETAILS 10 PREVIOUS EC DETAILS 11 PREVIOUS EC DETAILS 12 PREVIOUS EC DETAILS 13 PREVIOUS EC DETAILS 14 COMPLIANCE STATUS OF EXISTING UNITS Inspection of RO, MOEF & CC, Bhubaneswar was carried out on 23rd December, 2021. Certified Monitoring Report issued on 10th January, 2022 with No non-Compliance detected. 15 ENVIRONMENTAL SITE SETTINGS 16 EXISTING AND PROPOSED UNIT CONFIGURATION 17 EXISTING AND PROPOSED UNIT CONFIGURATION 18 EXISTING AND PROPOSED UNIT CONFIGURATION 19 EXISTING AND PROPOSED UNIT CONFIGURATION 20 EXISTING AND PROPOSED UNIT CONFIGURATION 21 PLANT LAYOUT 22 EMP – GREEN BELT Total area covered inside Plant premises – 387 Acres (35.8 % of total area) Total nos. of trees planted inside Plant premises – 3, 43,374 Nos. Avenue plantation outside Plant premises – 1, 59,180 Nos. Free distribution

Download Document

Here is the link to download the presentation.
"1 Environment Clearance (EC) for Expansion of"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.

Related Presentations

Optimal Stent Expansion and Optimization Joe Vickery Animal Shelter Expansion Project Imperial Expansion Large Phase 1 Studies with Expansion Cohorts: Clinical, Eth 11 mm clearance white11 mm clearance CMYK11 mm clearance Capacity utilization and expansion in the dynamic energy la Comprehending History from Westward Expansion through Recon Western Expansion SPA.10 Command Clearance – The Simple Guide Determining Crossing Conductor Clearance Using Line-Mounted LiDAR ENVIRONMENT ENVIRONMENT Define environment … Solute Clearance Monika Aggarwal, MD,MS,FASN Renal Function: Clearance