CMS beam vacuum layout for Run4 Roadmap as

CMS beam vacuum layout for Run4 Roadmap as
1 / 1
CMS beam vacuum layout for Run4 Roadmap as - slide 1 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 2 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 3 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 4 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 5 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 6 of 7 CMS beam vacuum layout for Run4 Roadmap as - slide 7 of 7
CMS beam vacuum layout for Run4 Roadmap as discussed with EN-ACE On behalf of all contributors J. Sestak Updated presentation 15082025 Two ways of handling the ECR document for Run 4 Complex document integrating all functional aspects,

Related Topics

Download this presentation From Below

"CMS beam vacuum layout for Run4 Roadmap as" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

01
CMS beam vacuum layout for Run4 Roadmap as discussed with EN-ACE On behalf of all contributors J. Sestak
Updated presentation 15/08/2025<br>
02
Two ways of handling the ECR document for Run 4

Complex document integrating all functional aspects,
Usually lacking clarity, very heavy, complicated for the follow-up.

Simple summary document serving as the link to all sub-documents.
Implementing product lifecycle documents from conceptual – development – production – OP stage
Elegant way however – All sub-documents must be released. ECR document<br>
03
Functional specification (per layout)
Interface specification (per interface)
Engineering specification (per equipment type – chamber, support, etc.)

Ok, sounds easy but:
We need to have general “design consideration agreement per functional specification”.
We need to have limits & margins.
Based on which we can produce dedicated specification per IR.

And we need to have all this released… Sub-documents 25 August 2025 Presenter | Presentation Title 3<br>