CO@L4BCC I.Kozsar BE/CO Overview Control System
Description: COL4BCC I.Kozsar BECO Overview Control System Infrastructure Control room OASIS InCA 5262011 I.Kozsar - BECO 2 Control system 5262011 I.Kozsar - BECO 3 DB Layout, FECs, start-up sequences Device Driver and library generation
Related Topics
Download Presentation
"CO@L4BCC I.Kozsar BE/CO Overview Control System" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Presentation Transcript
slide1. CO@L4BCC I.Kozsar BE/CO<br>
slide2. Overview Control System Infrastructure
Control room
OASIS
InCA 5/26/2011 I.Kozsar - BE/CO 2<br>
slide3. Control system 5/26/2011 I.Kozsar - BE/CO 3 DB Layout, FECs, start-up sequences… Device Driver and library generation Design, Instantiation, Deployment Parameter definitions, Settings, Logging, etc. Timber OS<br>
slide4. CO Hardware Analog input
Analog output
Digital input
Digital output
Timing
Level converters and repeaters
Serial link
Miscellaneous
http://wikis/display/HT/Modules+tree 5/26/2011 I.Kozsar - BE/CO 4<br>
slide5. CO drivers Drivergen / encore 5/26/2011 I.Kozsar - BE/CO 5<br>
slide6. FESA v 2.10 – current developments
v 3.0 available October 2011
Upgrade not imperative – concurrent 2.10 & 3.0 5/26/2011 I.Kozsar - BE/CO 6<br>
slide7. Application servers InCA
OASIS
Logging
SIS
File servers 5/26/2011 I.Kozsar - BE/CO 7<br>
slide8. Applications CCM
WorkingSets & Knobs
Timber
Function Editor
Sequencing 5/26/2011 I.Kozsar - BE/CO 8<br>
slide9. Control Room 3MeV test stand CR available by the end of the year
Equipment moved to Linac4 CR in 2013
4 WS Linux/Windows
Fixed displays needed? 5/26/2011 I.Kozsar - BE/CO 9<br>
slide10. OASIS Architecture 5/26/2011 I.Kozsar - BE/CO 10<br>
slide11. Oasis Hardware
6 families (10Hz to 8GHz sampling clk)
Multiplexing if not all signals observed simultaneously -> less ADCs
Trigger distribution -> coherent distant acquisitions
Software
FESA classes – CO (+ equipment groups)
Application server – CO
GUI - OP 5/26/2011 I.Kozsar - BE/CO 11<br>
slide12. OASIS Not initially foreseen in 3MeV test stand
Some requirements received are for the source (16 signals x2)
Equipment groups will acquire their signals -> published via OASIS server
More requirements need to be gathered 5/26/2011 I.Kozsar - BE/CO 12<br>
slide13. InCA 5/26/2011 I.Kozsar - BE/CO 13 ...<br>
slide14. InCA 5/26/2011 I.Kozsar - BE/CO 14 ...<br>
slide15. InCA 5/26/2011 I.Kozsar - BE/CO 15<br>
slide16. InCA No plans for 3MeV test stand
For Linac4 5/26/2011 I.Kozsar - BE/CO 16 2 designated persons for
InCA parameter definition
(OP/ABP)<br>
slide17. Thank you 5/26/2011 17 I.Kozsar - BE/CO<br>
slide2. Overview Control System Infrastructure
Control room
OASIS
InCA 5/26/2011 I.Kozsar - BE/CO 2<br>
slide3. Control system 5/26/2011 I.Kozsar - BE/CO 3 DB Layout, FECs, start-up sequences… Device Driver and library generation Design, Instantiation, Deployment Parameter definitions, Settings, Logging, etc. Timber OS<br>
slide4. CO Hardware Analog input
Analog output
Digital input
Digital output
Timing
Level converters and repeaters
Serial link
Miscellaneous
http://wikis/display/HT/Modules+tree 5/26/2011 I.Kozsar - BE/CO 4<br>
slide5. CO drivers Drivergen / encore 5/26/2011 I.Kozsar - BE/CO 5<br>
slide6. FESA v 2.10 – current developments
v 3.0 available October 2011
Upgrade not imperative – concurrent 2.10 & 3.0 5/26/2011 I.Kozsar - BE/CO 6<br>
slide7. Application servers InCA
OASIS
Logging
SIS
File servers 5/26/2011 I.Kozsar - BE/CO 7<br>
slide8. Applications CCM
WorkingSets & Knobs
Timber
Function Editor
Sequencing 5/26/2011 I.Kozsar - BE/CO 8<br>
slide9. Control Room 3MeV test stand CR available by the end of the year
Equipment moved to Linac4 CR in 2013
4 WS Linux/Windows
Fixed displays needed? 5/26/2011 I.Kozsar - BE/CO 9<br>
slide10. OASIS Architecture 5/26/2011 I.Kozsar - BE/CO 10<br>
slide11. Oasis Hardware
6 families (10Hz to 8GHz sampling clk)
Multiplexing if not all signals observed simultaneously -> less ADCs
Trigger distribution -> coherent distant acquisitions
Software
FESA classes – CO (+ equipment groups)
Application server – CO
GUI - OP 5/26/2011 I.Kozsar - BE/CO 11<br>
slide12. OASIS Not initially foreseen in 3MeV test stand
Some requirements received are for the source (16 signals x2)
Equipment groups will acquire their signals -> published via OASIS server
More requirements need to be gathered 5/26/2011 I.Kozsar - BE/CO 12<br>
slide13. InCA 5/26/2011 I.Kozsar - BE/CO 13 ...<br>
slide14. InCA 5/26/2011 I.Kozsar - BE/CO 14 ...<br>
slide15. InCA 5/26/2011 I.Kozsar - BE/CO 15<br>
slide16. InCA No plans for 3MeV test stand
For Linac4 5/26/2011 I.Kozsar - BE/CO 16 2 designated persons for
InCA parameter definition
(OP/ABP)<br>
slide17. Thank you 5/26/2011 17 I.Kozsar - BE/CO<br>