PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE
1 / 1

PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE

Author : liane-varnes | Published Date : 2025-08-16

Description: PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE TO EXPERT APPRAISAL COMMITTEE INDUSTRY2 MoEFCC FOR THE PROPOSED ADDITIONAL EXPLORATION AND DEVELOPMENT DRILLING OF 3 WELLS ALONG WITH INSTALLATION AND COMMISSIONING OF EPS GPU AND

Presentation Embed Code

Download Presentation

Download Presentation The PPT/PDF document "PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Transcript:PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE:
PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE TO EXPERT APPRAISAL COMMITTEE (INDUSTRY-2), MoEF&CC FOR THE PROPOSED ADDITIONAL EXPLORATION AND DEVELOPMENT DRILLING OF 3 WELLS, ALONG WITH INSTALLATION AND COMMISSIONING OF EPS / GPU AND ASSOCIATED PIPELINES FOR KG/OSDSF/GSKV1/2016 (GSKV FIELD) IN KG BASIN, KESAVADASUPALEM VILLAGE, SAKHINETIPALLE MANDAL, EAST GODAVARI DISTRICT, ANDHRA PRADESH 1 27h July, 2022 2 AVR oil and Gas proposes additional exploration and development drilling of 3 wells, along with installation and commissioning of EPS / GPU and associated pipelines for KG/OSDSF/GSKV1/2016 (GSKV Field) in KG basin. The proposed additional exploration and development will be carried out in Kesavadasupalem village, East Godavari district, Andhra Pradesh. EPS / GPU will be installed for processing of oil and gas. Gas pipeline will be laid to transport the gas to GAIL. On shore installation EPS / GPU will be constructed near the drilling location. Estimated cost of project is approx. Rs. 100 Crores. PROJECT DETAILS PROJECT DETAILS Fig. GSKV block boundary and proposed well location Total allocated contract area - 24.2 sq.km No. of wells to be drilled – 3 wells (~ 3000-4000 m depth) Installation and commissioning of EPS / GPU facilities Processed crude to be transported by Tanker to nearest Refinery Processed Gas to be transported through pipeline to GAIL pipeline Land requirement – approx. 7 HA (2 HA/well site and 1 HA for EPS/GPU facility) 3 COSTAL REGULATION ZONE (CRZ) STUDIES 4 Source: IRS, Anna University. CRZ studies were carried out by Institute of Remote Sensing (IRS), Anna University as per CRZ notification, 2011, Chennai an institution recognized by Government of India The proposed project block boundary and Tentative Well locations along with EPS/GPU Facilities are superimposed on approved CZMP as per CRZ notification, 2011 by Institute of Remote Sensing (IRS), Anna University, Chennai an institution recognized by Government of India. No mangroves were found in the vicinity of the proposed project site. The details of CRZ classification of the study area is given in the table below COSTAL REGULATION ZONE (CRZ)- INDEX MAP 5 No Mangroves were found in the vicinity of the proposed project site COSTAL REGULATION ZONE (CRZ)- 7KM RADIUS MAP 6 No Mangroves were found in the vicinity of the proposed project site APPROVED CZMP MAP – ANDHRA PRADESH 7 *Image shown above are Indicative only PROJECT CYCLE 8 Bunk Houses for crew 30- 40 persons/shift of 12 hrs. in two shifts/day during drilling operation

Download Document

Here is the link to download the presentation.
"PRESENTATION FOR GRANT OF ENVIROMENTAL CLEARANCE"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.

Related Presentations

Enviromental consulting Community Benefit Fund Community Organisation Grants Grant Acquittal report Department Page of Fingerprint clearance through the California Department of Justice DOJ and the 11 mm clearance white11 mm clearance CMYK11 mm clearance SPA.10 Command Clearance – The Simple Guide WELCOME CSP GRANT RECIPIENTS Determining Crossing Conductor Clearance Using Line-Mounted LiDAR CONCEPT OF CLEARANCE Grant writing Lots of resources on line and in books for how to write a successful grant. Solute Clearance Monika Aggarwal, MD,MS,FASN ENGINEERING STRATEGIES FOR HANDLING COVID-19 FOR ENVIROMENTAL HEALTH AND ECONOMIC SUSTAINIBLITY Renal Function: Clearance ENGINEERING STRATEGIES FOR HANDLING COVID-19 FOR ENVIROMENTAL HEALTH AND ECONOMIC HEALTH Prepared  by Nadia  Jradi