September 12, 2011 Global Design Effort 1 ILC - slide 1 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 2 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 3 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 4 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 5 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 6 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 7 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 8 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 9 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 10 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 11 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 12 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 13 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 14 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 15 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 16 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 17 of 18 September 12, 2011 Global Design Effort 1 ILC - slide 18 of 18
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer GDE Total FTEs in Revised Budget: 5.5 FTEs DR Technical Area Group Mgmt: 0.25 FTE (Palmer) DR Lattice Design and Physics Studies Sr Personnel

Related Topics

Download this presentation From Below

"September 12, 2011 Global Design Effort 1 ILC" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

01
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer
GDE<br>
02
Total FTEs in Revised Budget: ~5.5 FTEs
DR Technical Area Group Mgmt: 0.25 FTE (Palmer)
DR Lattice Design and Physics Studies
Sr Personnel 0.5 FTE
GRA 0.75 FTE
Electron Cloud: Mitigation Implementation Plan, Ongoing Studies (eg, durability tests and sub-threshold emittance growth studies at progressively lower ey), Simulations (particularly baseline lattice characterization and high power option studies)
Sr Personnel 2.25 FTE
GRA 0.75 FTE
Technician 1 FTE ART Budget Breakdown July 1, 2011 M. Harrison Visit 2<br>
03
Baseline Lattice now Cornell design
Situation seriously constrained by manpower limitations
Much of CFS and design interfacing defaulting to Cornell
Would like to add ~0.5 FTE designer time in order to make this more effective (and accurate) as well as more manageable
Principal tasks
Take Cockroft generated models and…
Update for new baseline
Expand for completely revamped vacuum system (needed for costing as well) and new magnet specs
Confirm CFS assumptions (eg, eliminate conservatism leading to outsized tunnel, etc)
Help with Sources-DR interface and DR-RTML interface layout constraints
Help document EC mitigation plans in vacuum system (sketch/simple model level) Updates July 1, 2011 M. Harrison Visit 3<br>