Download Presentation The PPT/PDF document "PART XV- LAND MANAGEMENT" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
PART XV- LAND
MANAGEMENT
(Total 9 periods)
1.2 Demarcation of land boundaries
& maintenance
of land
registers
2 periods
Slide2Scope of activities in maintaining
Land records and inspection
Proper Maintenance of Land Records.Control of land useDetection, Prevention and removal of encroachments.Maintenance of land boundariesUtilisation of land for various purposes by licensing/leasing to other organisations/parties for commercial/other uses including afforestation etc.
2
Slide3RELEVANT CHAPTER OF ENGINEERING CODE & IRWM
CHAPTER
VIII of Engg. Code RULES FOR THE ACQUISITION OF LANDCHAPTER IX of Engg. Code PROCEDURE FOR THE ACQUITION OF LANDCHAPTER X of Engg
. Code
THE CUSTODY, MANAGEMENT & DISPOSAL OF LAND
CHAPTER VIII OF IRWM ACQUITION, MANAGEMENT & DISPOSAL OF LAND
3
Slide4CHAPTER VIII OF ENGG CODE
PARA- E-850 MAINTENANCE OF LAND PLANS
A COMPLETE SERIES OF LAND PLANS FOR THE WHOLE LINE SHOULD BE KEPT IN THE OFFICE OF CHIEF ENGINEER OF THE RAILWAY4
Slide5CHAPTER X OF ENGG CODE
PARA - E-1048
PERIODIC VERIFICATION OF LAND BOUNDARIES: -EVERY RAILWAY ADMINISTRATION IS RESPONSIBLE FOR THE DEMARCATION AND PERIODICAL VERIFICATION OF THE BOUNDARIES AND THE MAINTENANCE OF PROPER RECORDS IN CONNECTION THEREWITH OF ALL LAND IN THE POSSESSION OF THAT RAILWAY.5
Slide6PARA – E-850:MAINTENANCE OF LAND RECORDS
AS PER PARA 806 OF IRWM
THE COMPLETE SERIES OF LAND PLANS FOR THE ENTIRE RAILWAYSHOULD BE MAINTAINED IN CE’s OFFICEORIGINAL TRACINGS DULY CERTIFIED BY STATE GOVERNMENTS SHOULD BE KEPT AS PERMANENT RECORDS IN CE’s OFFICE.
SUFFICIENT COPIES OF CERTIFIED LAND PLANS AFTER CARRYING OUT NECESSARY CONSOLIDATION AND MUTATION SHOULD BE PREPARED AND SUPPLIED TO DIVISIONS
NO NOTINGS SHOULD BE MADE ON CERTIFIED PLANS AND IMPORTANT LETTERS.
Slide7PARA – E-850:MAINTENANCE OF LAND RECORDS
PARA 806 OF IRWM
contd……DURING CONSOLIDATION AND SETTLEMENT OPERATIONS THAT TAKE PLACE AFTER CERTAIN INTERVALS, RE-SURVEY OF ALL THE VILLAGES IS CARRIED OUT BY CONCERNED REVENUE AUTHORITIES.DURING THE OPERATIONS, THE SHAPE OF THE RAILWAY LAND PLANS AND THE TOTAL AREA AVAILABLE WITH THE RAILWAYS MAY GET OBLITERATED IN REVENUE RECORDS.DURING SUCH OPERATIONS, THE CONCERNED SECTION ENGINEERS(WORKS/P.WAY) KEEP A TRACK OF SUCH OPERATIONS TO ENSURE THAT RAILWAY’S LAND IS KEPT INTACT IN REVENUE RECORDS.7
Slide8PARA – E-850:MAINTENANCE OF LAND RECORDS
PARA 806 OF IRWM
contd……IN FULFILLING THIS RESPONSIBILITY, THE DIVISIONS MAY TAKE SUITABLE ASSISTANCE FROM THE LAND CELL OF THE CHIEF ENGINEER’S OFFICE.ALL LAND PLANS SHOULD BE TRANSFERRED TO MICRO FILMS. SUFFICIENT COPIES SHOULD BE KEPT IN HQ AS WELL AS DIVN. OFFICE.8
Slide9PARA – E-850:MAINTENANCE OF LAND RECORDS
:
PARA 807 OF IRWMCOPIES OF ALL LAND PLANS SHOULD BE MAINTAINED IN DEN OFFICE.ALL CHANGES SHOULD BE CERTIFIEDFINAL LAND PLANS AFTER MUTATION ENTRIES,SHOULD BE SENT TO THE CE’S OFFICE FOR SAFE CUSTODY AND RECORD.COPIES SHOULD BE AVAILABLE IN DIVISIONAL AND FIELD OFFICES
9
Slide10PARA – E-850:MAINTENANCE OF LAND RECORDS
:
PARA 807 OF IRWM Contd….LAND RECORD SHOULD BE MAINTAINED AS PER TABLE 8.1 OF IRWMENTERIES SHOULD BE INITIALLED BY DEN/XEN WHENEVER ANY TRANSACTION OF LAND TAKES PLACE.IN CASE OF CONSTRUCTION PROJECTS INVOLVING LAND ACQUISITION , THE FOLLOWING SHOULD BE HANDED OVER BY CONSTRUCTION ENGINEERS
LAND RECORD REGISTER( TABLE 8.1)
THE ORIGINAL PAPERS OF LAND ACQUISITION
10
Slide11PARA – E-850:MAINTENANCE OF LAND RECORDS
PARA 806 OF IRWM
contd……LAND RECORD REGISTER SHOULD BE MAINTAINED IN CE’S/DIVISIONAL OFFICE AS PER TABLE 8.1 OF IRWM
11
Slide12PARA – E-850:MAINTENANCE OF LAND RECORDS
PARA 812 OF IRWM
COPIES OF CERTIFIED LAND PLANS SHOULD BE AVAILABLE IN AEN/ SE( W/P.WAY) OFFICEEVERY SE( W/P.WAY) SHOULD MAINTAIN LAND RECORD AS PER PARA 806(b) IN LAND RECORD REGISTERDURING INSPECTION OF HIGHER OFFICIALS THIS REGISTER SHOULD BE KEPT BY AEN
THE REGISTER SHOULD BE CHECKED ANNUALLY BY AEN/ DEN/ SR. DEN AND OBSERVATIONS RECORDED SHOULD BE FOLLOWED BY SSE
12
Slide13PARA – E-1047 DEMARCATION OF LAND BOUNDARIES
AS PER SECTION 13(A) OF INDIAN RAILWAY ACT OF 1989 & PARA 808 TO 811 OF IRWM
ALL RAILWAY LAND SHOULD HAVE WELL DEFINED BOUNDARIESBOUNDARY MAY BE A CONTINIOUS WALL, FENCE OR DITCH ,POST OR PILLARDISTANCE BETWEEN POSTS SHOULD NOT BE MORE THAN 50 M.
13
Slide14PARA – E-1047 DEMARCATION OF LAND BOUNDARIES
AS PER SECTION 13(A) OF INDIAN RAILWAY ACT OF 1989 & PARA 808 TO 811 OF IRWM Contd. …..
BOUNDARY POSTS SHOULD BE OF SUITABLE SIZE AND SHAPE ,PROJECTING min 500 MM ABOVE GROUND.BOUNDARY POSTS SHOULD BE FIXED AT EVERY CHANGE OF ALIGNMENT14
Slide15PARA – E-1047 DEMARCATION OF LAND BOUNDARIES
AS PER SECTION 13(A) OF INDIAN RAILWAY ACT OF 1989 & PARA 808 TO 811 OF IRWM Contd.
EACH BOUNDARY POST SHOULD HAVE A NUMBERPOSITION OF EACH BOUNDARY POST SHOULD BE MARKED ON LAND PLANON BANK OF RIVERS HIGH BOUNDARY PILLARS SHOULD BE ERECTED.
15
Slide16PARA – E-1047 DEMARCATION OF LAND BOUNDARIES
AS PER SECTION 13(A) OF INDIAN RAILWAY ACT IX OF 1989 & PARA 808 TO 811 OF IRWM Contd. …..
IN AREAS HAVING HABITATION BOUNDARY WALL SHOULD BE PROVIDED.PUCCA BOUNDARY WALL IN URBAN AREAS TO PREVENT ENCROACHMENTPLANTATION OF JULI FLORA OR SIMILARLY EFFECTIVE BUSHES IN THE AREA
16
Slide17PARA - E-1048 :PERIODIC VERIFICATION OF LAND BOUNDARIES & ENCROACHMENTS
AS PER PARA 813 OF IRWM
EVERY ZONAL RAILWAY ADMINISTRATION IS RESPONSIBLE FOR DEMARCATION AND PERIODICAL VERIFICATION OF THE BOUNDARIES AND MAINTENANCE OF PROPER RECORDS.THE SE(WORKS) SHALL INSPECT AND MAINTAIN THE LAND BOUNDARIES AT IMPORTANT STATIONS AND IN RAILWAY COLONIES.THE SE(P.WAY) SHALL INSPECT AND MAINTAIN THE RAILWAY LAND BOUNDARIES BETWEEN STATIONS AND AT UNIMPORTANT STATIONS.
SE(W/P.WAY) SHALL PREVENT AND REMOVE ENCROACHMENTS IN THEIR AREAS OF JURISDICTION.
17
Slide18PARA - E1048 :PERIODIC VERIFICATION OF LAND BOUNDARIES
PARA 813 OF IRWM
Contd….RAILWAY SHOULD MAINTAIN PRINTED REGISTERS AS PER ANNEXURE 8.1(a) & 8.1(b) OF IRWM SHOWING “DETAILS OF ENCROACHMENTS” AND “DETAILS OF THE MISSING BOUNDARY STONES” AND ACTION TAKEN THEREON.THE ENTRIES IN THE REGISTER SHOULD BE MADE BY SETHIS REGISTER SHOULD HAVE ADEQUATE PAGES SO THAT RECORD FOR 15 YEARS CAN BE ACCOMODATED IN ONE REGISTER.
18
Slide19PARA - E-1048 :PERIODIC VERIFICATION OF LAND BOUNDARIES
PARA 813 OF IRWM
Contd….VERIFICATION / INSPECTION BY AEN/ DEN/ SR. DEN DURING INSPECTIONS.A CERTIFICATE IN THE PRESCRIBED PERFORMA SHOULD BE GIVEN BY SECTION ENGINEER ONCE A YEAR WHICH IS TO BE COUNTERSIGNED AND VERIFIED BY AEN19
Slide20FENCING
PARA 811 (ii) FENCING SHOULD BE PROVIDED AT THE FOLLOWING LOCATIONS:
FOR SPECIFIED LENGTHS ON EITHER SIDE OF LEVEL CROSSINGSAROUND BUSY STATION YARDS FOR 30M WIDTH ON EITHER SIDEIN MUNICIPAL LIMITS AND NOTIFIED AREA LIMITS AND IN PROXIMITY TO VILLAGES OR SUCH LOCALITIES WHERE HUTS OR HOUSES ARE CLOSE TO RAILWAYS LINE.FOR PROTECTION OF RAILWAY LAND FROM ENCROACHMENTS20
Slide21LAND BOUNDARY VERIFICATION CERTIFICATE
Station premises / colony / mid section
Location
Rly. Employee / outsiders persons / others
Soft / hard
Area in
Sq.m
.
KM / EM Station ( from- to )
Reference to encroachment plan
1.
2.
3.
4.
5.
6.
21
Value of land approx.
Approx. period since encroachment existing
Purpose: Personal / Commercial / religious / Social other
Action Taken to remove
Remarks
Value
Basis market rate / notified rate / Rough assessment
7.
8.
9.
10.
11.
12.
Year -------------------- Section----------------------
Kms.
--------------- to-------------
Section Engineer(
P.Way
/Works----------------- Sub Division---------------------- Division------------------------------------------------------------------------------------------------------------
I,--------------------------Section Engineer ( works / P. way ) certify that I have inspected the railway land fencings and boundary stones on my section during the year ending ---------------------and that they are in accordance with certified the/land plans. There have been no encroachments except at the following kilometerages that have been reported upon vide reference given against each.
Slide22PARA - E-1048 : PERIODIC VERIFICATION OF LAND BOUNDARIES
DETAILS OF MISSING BOUNDARY STONES
DATE OF INSPECTION
LOCATION
DESCRIPTION
OF MISSING BOUNDARY STONES
ACTION TAKEN
INTIAL
OF INSPECTING OFFICERS
REMARKS
Km
BOUNDARY
STONE NO
22
Slide23PROFORMA FOR LAND BOUNDARY VERIFICATION REGISTER
ANNEXURE 8.1(a) PARA 813(d) (LEFT SIDE OF REGISTER)
DETAILS OF BOUNDARY STONES BETWEEN KILOMETER ----- AND----23
DATE OF INSPECTION
DESCRIPTION
OF MISSING BOUNDARY STONES
ACTION TAKEN
INTIAL
OF INSPECTING OFFICIALS
L
R
Slide24Land Records Register
This register has to be maintained in
Headquarters/ChiefEngineer’s office as well as in Divisional/Executive Engineers’ office. As per the model JPO of September 2001, a register of total railway land with up to date entries shall be maintained by the Section Engineers (Works) of the Engineering Department.RB_LAND_Boundary_ circulars\ID-125.pdf 24
Slide25DUTIES OF ENGINEERING OFFICIALS
DUTIES OF SSE/WORKS
Maintenance of land boundaries, within station premises (if HQ office is within station premises ) & within/around colony premises.Maintenance of land record.To carry out inspections of encroachments and record details of inspection in encroachment inspection register.To carry out inspections for land boundary verification and record details of inspection in land boundary verification register.25
Slide26DUTIES OF ENGINEERING OFFICIALS
DUTIES OF
SSE/WORKSRemoval of encroachment.During inspections of higher officers from the division and zonal Railway, the SSE will keep the land register with him. 26
Slide27DUTIES OF ENGINEERING OFFICIALS
DUTIES OF SSE/P.WAY
Maintenance of land boundaries, in between station limits.To carry out inspection of encroachments and record details of inspection in encroachment inspection register. To carry out inspections for land boundary verification and record details of inspection in land boundary verification register.Frequency of Inspection shall be at least once in a year by SSE (P.Way)/incharge and by JE(P.Way)/Sectional once in 6 months.27
Slide28DUTIES OF ENGINEERING OFFICIALS
DUTIES OF
SSE/P.WAYRandom verification of land boundary during push trolley inspection.Removal of encroachment.Keep land record register with him during higher official inspection from Division/Zonal Railway.28
Slide29DUTIES OF ENGINEERING OFFICIALS
DUTIES OF ASSISTANT DIVISIONAL ENGINEER
Up to date land plans should be available in the AEN office and copies should be made available to the field inspectors.To ensure that every SE(Works/P.Way) maintains a land record as per Para 806(b) and all entries in the register are upto date.Land records register should be checked annually by AEN and observation to be communicated to SE(Works/P.Way) in writing.29
Slide30DUTIES OF ENGINEERING OFFICIALS
DUTIES OF ASSISTANT DIVISIONAL ENGINEER
To ensure that SE(Works/P.Way) inspection for encroachment and land verification are being done as per schedule.Removal of encroachments.During inspections of higher officers from the headquarters and railway board, the land register will kept by the AEN with him.30
Slide31DUTIES OF ENGINEERING OFFICIALS
DUTIES OF
Sr.DEN/ DENTo ensure availability of land records at all times.During consolidation and settlement operation total land area available with the railways may get obliterated in revenue records.Concerned SE(W/P.Way) keep a track of such operations to ensure that railway’s land is kept intact in revenue records.Final land plans, after mutation entries are carried out, should be sent to the Chief Engineer’s office for safe custody and record.31
Slide32DUTIES OF ENGINEERING OFFICIALS
DUTIES OF HOD IN HEADQUARTER:
Complete series of land plans for the entire railway should be maintained in the Chief Engineer’s offices. (Para 850 of Engg code)The original tracings that are duly certified by the State Government should be kept as permanent records in the C.E’s office.Sufficient copies of certified plans should be made out and supplied to divisional engineers.Ensuring availability of land plans in PCE’s office at all the time.32
Slide33DUTIES OF ENGINEERING OFFICIALS
DUTIES OF HOD IN HEADQUARTER:
Scrutinizing the registers related to land boundary/encroachment/boundary pillars submitted by Sr.DEN/DENMonitoring of pending cases of mutation of land.Taking action for removal of encroachments and monitoring the progress of their removal.33
Slide34INSPECTION SCHEDULE
34
Subject
Inspection schedule in connection with land matters
Division
H.Q.
SE/SSE/ Works or P. Way
ADEN
DEN/
Sr.DEN
Sr.DEN/Co.
HOD
Checking of condition and availability of land plans and Land record Registers. (Tables 1 to 4)
Yearly
Yearly
Yearly
Yearly
Yearly
Checking of Land boundary registers and field verification of boundary pillars and offsets. (Tables 5 to 7 and Certificate 1)
Quarterly
Yearly
Yearly
During inspection especially on vulnerable locations. Details be furnished in the Inspection Note.
During inspection especially on vulnerable locations. Details be furnished in the Inspection Note.
Slide35INSPECTION SCHEDULE
Checking of Encroachment Inspection Register & certificate on number of existing encroachment. (Tables 8 and Certificate 2)
Quarterly
Once in six months
Yearly
During inspection
During inspection
Certificate for number of new encroachment. (Certificate 3)
Quarterly
Once in six months
Yearly
Yearly
Yearly
35
Slide36Checking of Mutation Entries of land acquisition in Revenue records & obtaining mutation certificate from concerned land Revenue authorities.
Quarterly
Once in six months
Yearly
Yearly
Yearly
Handing over of land related records of new line projects by Construction
Organisation
.
It should be ensured/confirmed/certified while taking over the new line projects, that the following documents handed over by Construction Organization and taken over by Open Line.
1)Indent placed on Revenue authority for acquisition of land.
2)
Shajra
duly verified
3) Notification for intention for acquisition of land.
4) Notification for declaration for acquisition of land.
5)Award.
6)Taking/ handing over note.
7)Attested copy of mutation.
8)Land plan duly verified by the revenue authorities showing details of mutation.
9)Land record register
Note: The handing over and taking over of all the above documents have to be confirmed by CAO(C) and PCE.
36
Slide37INSPECTION SCHEDULE
Land, plots, shops, etc., leased /licensed by Railway
Once in six months
Yearly
During the inspection, the following items to be checked:
1) Whether the payment made are up-to-
date.
2) Whether ownership as per site verification
is same as that in the Agreement.
3) Whether the total area of land occupied is
same as allotted
NOCs granted for construction of
Govt
& Private buildings near Railway land
Keep a constant look out for any unauthorised extenstion/ new construction.
Keep a constant look out for any unauthorised extenstion/ new construction.
During inspection
During inspection
During inspection
37
Slide38INSPECTION SCHEDULE
Checking of extension/new construction of religious structures
Keep a constant look out for any unauthorised extenstion/ new construction.
Once in six months
During inspection
During inspection
During inspection
Inspection of colony regarding boundary walls/ fencing/ boundary pillars/ encroachment
Quarterly
Once in six months
Yearly
During inspection
During inspection
NOTE:
specific notes related to land matters as mentioned above must be reflected in inspection note for items inspected during the inspection.
38
Slide39Table : Details of land plans
S. No.
Divn.
Concerned SSE/Works/
P.Way
Section
No. of land plans at the end of previous year
Land plans added in the current year
Total no. of land plans, as on …
No. of land plans available during inspection
No. of land plans inspected
No. of missing land plans
No. of authenticated land plans
No. of land plans found in damaged condition
No. of land plans where mutation has not been done
Signature of concerned Divisional officials (i) JE/SE/SSE / Works/ P.way
(ii) AEN/ADEN
(iii) Sectional DEN/ Sr. DEN
Signature of
(i) LCO
(ii) Dy.CE/G
(iii) CE/G
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
39
Slide40TABLE : DETAILS OF MISSING LAND PLANS
S. No.
Divn.
Concerned SSE/Works/P.Way
Section
Land plan No. (if available)
Kilometer from …. to….
Details of place from where missing & date/month/year since it is missing
Action taken to recoup the land plan
Responsibility
Signature of concerned Divisional officials (
i
) JE/SE/SSE / Works/
P.way
(ii
) AEN/ADEN
(iii) Sectional DEN/ Sr. DEN
Signature of
(
i
) LCO
(ii)
Dy.CE
/G
(iii) CE/G
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
40
Slide41TABLE : DETAILS
OF
AUTHENTICATION OF LAND PLANS
S. No.
Divn.
Concerned SSE/
Works/
P.Way
Section
Land plan No.
Km from…..to……
Action taken for authentication
Responsibility
Signature of concerned Divisional officials
(
i
)
JE/SSE
/ Works/
P.Way
(ii)
ADEN
(iii)Sectional DEN/ Sr. DEN
Signature of
(i) LCO
(ii) Dy.CE/G
(iii) CE/G
Remarks
1
2
3
4
5
6
7
8
9
10
11
41
Slide42Table : Details of damaged land plans
S. No.
Divn.
Concerned SSE/Works/P.Way
Section
Land plan No.
Kilometer from …. to….
Details of date/ month/year when damage was detected
Action taken to recoup the land plan
Responsibility
Signature of concerned Divisional officials (i) JE/SE/SSE / Works/ P.way
(ii) AEN/ADEN
(iii) Sectional DEN/ Sr. DEN
Signature of
(i) LCO
(ii) Dy.CE/G
(iii) CE/G
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
42
(Details of this Table should tally with contents of Column 12 of Table 1, otherwise reasons for difference in figures should be clearly indicated)
Slide43Table : LAND RECORDS REGISTER
Division ……………………. Railway ……………………… Section ……………………….
Engg
.
Divn
Land Plan No
Stn. or Kilometrage
Description
Area
(in Ha)
Cost of land acquisition/ relinquishment
Reference to correspondence
Govt. Resolutions & date of sanctioning the transfer of land
Date of consolidation/ mutation with revenue authorities
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(
10)
43
Slide44INDEX:
Land boundary verification registers (LBVRs)
INDEX
Sl. No.
Block Section/Station
Page No.
Remarks
From
To
FROM KM
TO KM
1
2
3
4
5
6
7
44
Slide45Land boundary pillars
:
(Right Side of Register)
PLAN SHOWING RAILWAY BOUNDARY STONES BETWEEN
Km…………………………… To…………………………..
Between Station…………………………… To…………………………..
Left
Track
Km/
C/L
Right
Correctness of offsets wrt track centre of the reference track
Pillar No.
Distances (mt)
Pillar No.
Distances (mt)
1
2
3
4
5
6
45
Slide46Table : INSPECTION DETAILS OF BOUNDARY STONE BETWEEN KM…TO… (Left side of Register)
Date of inspection
Location
Description of missing boundary stones
Action Taken
Initials of Inspecting Officers
Remarks
KM
Boundary Stone No.
1
2
3
4
5
6
7
46
Slide47CERTIFICATE : LAND BOUNDARIES VERIFICATION CERTIFICATE
Year ______________ Section______________
Kms.______________ to______________Section Engineer (P. Way/Works)_______Sub Division______________ Division______________ I,________Section Engineer (P. Way/Works) certify that I have inspected the Railway land fencings and boundary stones on my section during the year ending __________________ and that they are in accordance with the certified land plans. There have been no encroachments except at the following kilometerages that have been reported upon vide reference given against each.47
Slide48Table :Details of Encroachments
Station premises/colony/mid section
Location
Rly. employee/outsiders persons/others
Soft/hard
Area in
Sqm
.
Value of land approx.
ApproxPeriod since encroachment existing
Purpose: Personal/ Commercial
/religious /social
/other
Action taken to remove
Remarks
KM/EM Station (from – to)
Reference to encroachment plan
Value
Basic market rate/notified rate/Rough assessment
1
2
3
4
5
6
7
8
9
10
11
12
48
further certify that boundary wall/ wire fencing and/or boundary stones are available at all locations except at the Kilometerages shown below for which action to replace the same is indicated against each location.
Slide49Table Details of missing boundary stones
Date of inspection
Location
Description of missing boundary stones
Action Taken
Initials of Inspecting Officers
Remarks
KM
Boundary Stone No.
1
2
3
4
5
6
7
49
Slide50CERTIFICATE IN
LBVR
Certificate 1. I certify that Railway boundaries are demarcated correctly that there are no encroachments, except those listed above and there is no new encroachment2. Certified that authenticated land plans pertaining to the above mentioned Section Engineer (Works/P.Way)___________________are available with him except the following. 3. Certified that land boundary pillars have been provided in accordance with the authenticated land plans except the following locations. Asstt. EngineerDEN/SrDEN
Chief Engineer General
50
Slide51Table : Encroachment inspection registers
(Left Page)
LocationName of encroacherFather’s name & address Area occupiedUse of land ---------- Commercial/residential/Cultivation) Date of commencement of unauthorized occupation Date on which encroachment came to the notice for first time,
Reference of File No
51
Date of inspection/Review
Action taken
Date of Removal
Initial of Inspecting official
Note: The encroachment plan has to be prepared to scale and pasted on the right side of EIR.
Slide52CERTIFICATE : EXISTING ENCROACHMENTS
Section Engineer (Works/P. Way) shall give a certificate in the following
proforma, once in three months which shall be verified and countersigned by the concerned AEN. Detail of Jurisdiction "I............................................., Section Engineer (Works/P. Way) certify that I have inspected the Railway land in my section during the quarter ending ..................and there have been no encroachments except at the locations shown in this register, that have been reported upon vide references given against each." sd/- Section Engineer (Works/P. Way)
52
Slide53CERTIFICATE : New encroachments
Section Engineer (Works/P. Way) shall give a certificate in the following
proforma, once in three months, which shall be verified and countersigned by the concerned AEN. Detail of JurisdictionCertificate "I............................................., Section Engineer (Works/P. Way) certify that I have inspected the Railway land in my section during the quarter ending ..................and certify that in my jurisdiction there is no new encroachment/___no of encroachments added/ developed during period ………………..” sd/-
Section Engineer (Works/P. Way)
(Note: For encroachment on Railway land, the responsibility has been distributed among different departments
viz; station area, between stations settlements where SSE (works) is headquartered/not headquartered, workshops, locosheds etc. In case of new encroachments the signatures of concerned Sr sub-ordinates of other departments also will be required on similarly worded certificates, which should be filed in a file, with an endorsement to this effect in the EIR and reported to higher officials)
53
Slide54RAILWAY BOARD LETTERS
LAND RECORDS “ MUST BE DIGITIZED”
RAILWAY BOARD LETTER NO.2009/LML-II/13/19 DT.21.07.2014LAND INFORMATION IN LAND DATA BASE SOFTWARE RAILWAY BOARD LETTER NO.2014/LML-11/2/3 DT.01.07.2014LAND DATA BASE SOFTWARE IS AVAILABLE ON RAILNET 10.50.19.91/landdatabase.THE LOGIN AND PASSWORD TO ACCESS THE DATA BASE IS ZONAL ABBREVIATION IN SMALL LETTER.
54
Slide55RAILWAY BOARD LETTERS
FUTURE USE OF ALL THE VACANT PLOTS
RAILWAY BOARD LETTER NO.2014/LML-11/2/3 DT.28.07.2014SOME OF THE ISSUES RELATED TO LAND MANAGEMENT DURING THE DISCUSSION HELD IN PCE’S CONFERENCE ON 21.05.2014 RAILWAY BOARD LETTER NO.2014/LML-II/2/3 DT.22.05.201455
Slide56RAILWAY BOARD LETTERS
INCLUSION OF LAND PLANS IN PCDOs
RAILWAY BOARD LETTER NO.2014/LML-II/2/3DT.01.04.2014 MINUTES OF CGEs CONFERENCE RAILWAY BOARD LETTER NO.2009/LML/20/1 DT.15.12.200956
Slide57RAILWAY BOARD LETTERS
PRONOUNCEMENT IN BUDGET SPEECH FOR 2014-15 – BOUNDARY WALLS AROUND STATIONS THROUGH PPP MODE
RAILWAY BOARD LETTER NO.LML-1/19/9 DT.13.08.2014CONSTRUCTION OF BOUNDARY WALLS ON RAILWAY LAND.BOARD DESIRE THAT RAILWAY MAY TAKE NECESSARY ACTION FOR PROVIDING IN A PHASED AND PLANNED MANNER:RCC BOUNDARY WALL IN METROS/MAJOR CITIES WHERE LAND VALUE IS HIGHFENCING(STEEL/BARBED WIRE) OR MASONRY WALL IN VULNERABLE URBAN AREASMULTIPLE ROWS OF PLANTATION ON REMAINING LAND BOUNDARY. RAILWAY BOARD LETTER NO.2011/LMB/14/64 DT.26.07.2013
57