PPT-Baffle update

Author : yoshiko-marsland | Published Date : 2017-03-20

Zhiwen Zhao 20130813 Acceptance study condition Vacuum plane in front of EC and GEM everything else are kryptonite or vacuum Virtual plane in front of EC R90270cm

Presentation Embed Code

Download Presentation

Download Presentation The PPT/PDF document "Baffle update" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Baffle update: Transcript


Zhiwen Zhao 20130813 Acceptance study condition Vacuum plane in front of EC and GEM everything else are kryptonite or vacuum Virtual plane in front of EC R90270cm to record hits limited by . While in offices salesrooms and administrations in most cases closed suspende d ceilings are used baffle systems are often used in machine halls at production lines and in other technically complex environments The absorption coefficient of such baf The integrity of the entire suspended ceiling depends on the 5mm gal rod and Unigrid Suspension Clips and Channel being used which satisfy Australian New Zealand standard 27852000 1 Before You Start All material delivered to site should be checked 1 Before ou Start All ma terial delivered to site should be checked for dama ge unopened and original packa ges At this sta ge if you are unsure of the suitability of ma terial for this project ask questions as it is ver y expensive to remove ma ter NATURAINLET TAt the heart of every efficient ven-tilation system is a well designed -ing durability. AP air inlets and chimney systems pro-vide you with the precise control and distribution of incomi Zhiwen. Zhao. 2013/10/15. Intro. Previously, I couldn’t obtain an ideal baffle with the code (makebaf5.C). For the . writeup. , we used “. BaBar. more1 block” which is based on Eugene’s . BaBar. baffle update. Zhiwen. Zhao. 2013/05/17. 1. Babar magnet and Babar baffle. It is in the original proposal and . preCDR. The label is wrong. It should be 50uA 85% polarized 11GeV beam on 40cm LD2 for 120 days. baffle update. Zhiwen. Zhao. 2013/04/02. Current Baffle. The total distance from plane 1 to 6 is 150cm which is a few cm . overlapping with . endcap. . nose. . and no place for 2. nd. GEM behind last baffle plane. Thermal . analyses. Summary of previous thermal analyses performed in 2010-2011. S.Basso. – F. . Borsa. . (I.N.A.F. – . Osservatorio. . Astronomico. di . Brera. ) . Catania, 11/. Jun. ./2014. PVDIS. Achievements, concerns,. and the way forward . Achievements. Started with the proposal. We now have a reasonable design for all of the detectors, etc. This was a huge job.. Mechanical structure better defined.. short a in front of three separate West End establish- ments. The tales of drugged handkerchiefs, sweets, and flowers had so many variants as to create the impression that the homes of the country mu Technical data | mineral tiles re Approx. 24 mm (OWAcoustic All metal components are galvanised and/or painted white.From top of baf aLIGO. Hiro Yamamoto LIGO/Caltech. Introduction. Loss related to geometry. Loss related to as-built arms. Loss . related . to aberrations. Loss . related . to thermal deformations. Summary. 1. 1W input H1. aLIGO. Hiro Yamamoto LIGO/Caltech. Introduction. Loss related to geometry. Loss related to as-built arms. Loss . related . to aberrations. Loss . related . to thermal deformations. Summary. 1. 1W input H1. Satish Patil and N.P. GulhaneM.Tech Scholar, VJTI, Matunga, Mumbai, India VJTI, Matunga, Mumbai, India Abstract

Download Document

Here is the link to download the presentation.
"Baffle update"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.

Related Documents