Cruz Bay Waterfront Plan Cruz Bay Waterfront Plan

Cruz Bay Waterfront Plan - PowerPoint Presentation

yoshiko-marsland
yoshiko-marsland . @yoshiko-marsland
Follow
397 views
Uploaded On 2016-03-22

Cruz Bay Waterfront Plan - PPT Presentation

Ferry Dock Alterations Main Parking Area Alterations Creek Alterations Enighed Pond Alterations Presented By Paul Devine Existing Waterfront Areas Affected Alterations To Include Ferry Dock Area Along Existing Parking Area Near Ferry Dock and Creek Area ID: 265547

dock area existing parking area dock parking existing ferry customs enighed harbor master barge building install public extended alterations main dinghy vendor

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Cruz Bay Waterfront Plan" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Cruz Bay Waterfront Plan

Ferry

Dock

Alterations

Main Parking Area Alterations

Creek Alterations

Enighed Pond Alterations

Presented By Paul DevineSlide2

Existing WaterfrontSlide3

Areas Affected

Alterations To Include Ferry Dock, Area Along Existing Parking Area Near Ferry Dock and Creek Area

Enighed PondSlide4

Approximate Dimensions of Existing Dock

Existing Ferry Dock-Approximately 150 ft X 50 ft

Existing

Dinghy Docks

Ferry

Boats

Ticket/WaitingSlide5

Extended Dock and Building

All Ferries Moved To North Side of Dock

New Marina Area-Overnight, short and long-term slips

Extended Dinghy Dock

Charter Boats

Dinghies

Enlarged BuildingSlide6

Alterations To Ferry Dock Area

Extend existing

ferry dock

to twice its length

Remove and re-install existing south dinghy dock to twice its length

Remove north dinghy dock completely

Install slips on north side of new dock

Install new marina-type metered shore power with water

Install new dumping station at far west end of extended dock

Double width of existing ticket/waiting area and install Customs/ Harbor Master/public bathroom addition

Install Additional lighting at dock and dinghy dock areas

Provides income to PA through hook-up feesSlide7

Extended dinghy dock/charter boat space approx 150 ft Optional dock Extended dock

Slips

Slips

Enlarged ticket/waiting/customs building Extended room for additional ferry boats

Extended Dock and Building Approximately 300 ft X 50

ft

Optional Dock

Shore Power/water for each slip

shoreline

Existing retail areaSlide8

New Dock At Ferry Area

Existing Parking area

Existing Ticket/Waiting Area

The

“Battery”

Area

New Dock w/Vendor and Fish Market areas

Existing Ferry Dock

Existing RoadwaySlide9

New Dock At Ferry Area

Extends the length of the existing parking area and is at least 35 ft

wide

Is well lit and has provisions for electric and water/sewer hookups for vendors and fish market

Provides immediate access to vendors upon arrival of visitors

Allows Park to be used for intended purpose-beautiful grounds, rest and relaxation

Provides a better visitor first experience

Provides income to PA through vendor space rental feesSlide10

Main Parking Area Outline

Existing bathrooms and Customs areas

To “Creek”

Existing vendor areas

Existing OpeningsSlide11

Alterations to Main Parking Area

Remove existing bathroom entirely

Remove Customs and Harbor Master building

Remove existing

vendor buildings,

build new vendor area at corner

Install parking area lighting

Infill existing boat ramp

Install new bulkhead from infill area to Creek bulkhead to create continuous waterfront break

Provides a dedicated taxi parking area close to ferries (waterfront parking to remain)

Provides 40 additional Parking spaces

Provides a larger Carnival area

Provides PA with income from vendorsSlide12

Renovated Main Parking Area

Taxi Parking

Area only

Relocated Vendor Area

Existing opening to remain

New opening

Public parking

In-filled ramp

New opening

Adjoins “Creek” Area

Roadways

The “Battery” Area

Existing P.O.

WaterfrontSlide13

The “Creek” Area

Main Parking Area

New

Public Bathrooms, Customs

, Harbor Master Building

Slips

Add new dock- 200 ft X 20

ft (NTS)

New dinghy dock

Parking

Parking

Continuous access to Main Parking Area

NPS Area

All fencing removedSlide14

Creek Renovations

Provides a new dock with provisions for a 40 boat marina

Provides new Customs, Harbor Master Building (TSA requirements remain intact)

Provides bathroom facilities for public and boaters

Provides additional 20 parking spaces

PA collects fees from overnight and short-term boats

Allows continuous parking to Main Parking area

Provides additional revenues to local businesses

Allows greater access to NPS facilitySlide15

Enighed Pond Barge Area

Primary Barge Docking Area

Secondary Barge Docking

Spoils Area

Road

Entrance Road

Optional Area For International Ferries

Mangrove

Proposed Harbor Master Bldg.Slide16

Alternative Enighed Barge Area

Contant

Area

Mangrove

New

Dock w/ticketing

Buoys arranged for Barge and Ferry Traffic

Line of old break/dike

RoadSlide17

Alternative Enighed Barge Area

Contant

Area

Mangrove

New

Dock w/Ticketing

Buoys arranged for Barge and Ferry Traffic

Line of old break/dike

Road

Optional ferry dockingSlide18

New Enighed Dock

Provides new dock and ticketing area for international travel

Frees Creek area of large boat traffic, allowing for marina

Proposed new Enighed Harbor Master building could also be CustomsSlide19

Proposed Enighed Parking Area

General location of spoils area

150 Parking Spaces

Relocated Harbor Master/Customs w/Public Bathrooms

Proposed entrance/exits

Barge Area

Dedicated Taxi AreaSlide20

Alternate Proposed Enighed Parking Area

General location of spoils area

150 Parking Spaces

Relocated Harbor Master w/Public Bathrooms

Proposed entrance/exits

Barge Area

Dedicated Taxi Area

Customs/TSA/Ticketing

Fenced walkway to ferry dockSlide21

Enighed Pond Area Parking/Buildings

Re-locating Harbor Master/Bathrooms would provide public facilities. (The public cannot enter a TSA area)

Grouping Customs/Ticketing would provide a secure

TSA

area

International travelers can purchase tickets and go through Customs

Dedicated taxi area would provide immediate transportation

New parking area would allow short and long-term parking for international travelers and local parking

Customs close by would allow greater ease of checking of importsSlide22

Questions and Answers