x0000x0000 Rev Note For the purposes of this Design Criteria and subsequent Construction Notes the term 147Jack and Bore148 is used generically to refer to a number oftrenchless const ID: 820351

contractor x0000 slurry mts x0000 contractor mts slurry work rev casing bore string railroad prior commencement head jack ontit

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "MTSBoreDesign Criteria" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

�� Rev MTSBoreDesign Crit
�� Rev MTSBoreDesign Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term “Jack and Bore” is used generically to refer to a number oftrenchless construction methods a few of which are described in these notes.The basic guidelines to be followed for Jack and Bore Design are referenced in the AREMA (The Engineer/ContractorMTSBoreConstruction Generalote�� Rev Prior to any commencement of work, ontit o MTSw and approvalateg all plan and field changes/modifications, certificates of compliance, and s for work affecting railroad rightwayPrior to any commencement of work, ontit o MTSw and approvalin The Contractor shall verify and mark out all railroad ri

ght of way limits and property entitleme
ght of way limits and property entitlements (easements, license agreements, etc.) within the vicinity of the work and/or relatedto the work.Prior to any commencement of work, ontingreceivingfor MTS inspection and acceptanceBoth iseapproved byThe Contractor shall monitor rail elevations prior to and immediatelyafter the Jack and Bore operation. Both rails of each track shall be monitored at the point of crossing, unless otherwise directed by MTS. Top of rail elevations shall be recorded with an accuracy of one (1) onehundredth of a foot (0.01’)and shall be submitted to MTS for review.backfilled or that encroach within a 2:1 downward sloping line from the edge of rightwayBackfilling in all other areas shall be in accordance with the local

jurisdiction’s standards. ontlicin
jurisdiction’s standards. ontlicin addition tois,trash, thellywithin 24 hourstha Jack and Bore OperationsPrior to any commencement of work, ontit o MTSw and approvalss, sContractor may utilizeany one ofthe following methods of installing casing and �� Rev its respectiveJacking:AREMA (ManualFillsthoutholliicithousisAuger Boring:siscasing earthhorizontal auger machine with an otatcasing casing thaill advancing in front oftheaugeruttin etecasing uttor running of earthatecilitattedrrareview and Noteicheouthacasing pipestho�� Rev Directional Drilling (for casings 12” in diameter or less)This method consists of utilizing specialized drilling equipment to bore a small diameter pilot hole along th

e desired alignment using a mechanical c
e desired alignment using a mechanical cutting head with highpressurebentonite slurry to remove the cuttings. The drill string is advanced with the bentonite slurry pumped through the string to the cutting head and then forced back along the string, carrying the cuttings back to the surface for removal. After the cuttinghead reaches the far side of the crossing, it is removed and a reamer (with a diameter wider than the cutting head) is attached to the lead end of the drill string. The casing is attached to the reamer and the casing is then pulled back into its final position.Excavatingthe soil by means of jetting offluid or jetting of slurry are not allowed.Slurry use shall be kept to a minimum and shall only be used for head lubrication an

d/or spoils return. The Contractor shal
d/or spoils return. The Contractor shall calculate anticipated slurry use and monitor actual use during the boring operation in order to determine the slurry loss into thesurrounding soil. The bentonite slurry shall seal the annular space between the casing and the excavated soil with a minimum return of 95%.Jacking and receiving pits shall be fenced on all sides and secured in compliance with OSHA requirements.advanced in a timely mannerwith minimal breaks in operation and no change in crew or operatorotheiseShouls,willin ateateettatelishtablistin ateotein ce �� Rev llyoteif eteis eatethaateit is with a 2sack slurry If ground displacement is detected during the installation of the casing pipe, then all operations shall stop

. The Contractor shall develop a remedi
. The Contractor shall develop a remediation plan that is approved by MTS before resuming operations. The contractor is liable for all damages resulting from ground displacement. Should the track displace, corrective action shall be taken by MTS forces or the Contractor as approved by MTS. MTS expenses shall be reimbursed by the Contractor.Shouateotheuntek, ateunteat the sitethe Contractor shall adhere to the following:The atefor review and approval apaoperatedsisdetetheateateto feeateate�� Rev atese of the railroad trackwayntaeteettck,ciliiscatein iciiclateateiseautholeft in placeentAll underground utilities constructed within railroad rightway or abandoned in place is subject to MTS independent inspection and acceptance.