/
121.3.13 cold and warm magnets  Power Supply (PS) B. Hanna 121.3.13 cold and warm magnets 121.3.13 cold and warm magnets  Power Supply (PS) B. Hanna 121.3.13 cold and warm magnets

121.3.13 cold and warm magnets Power Supply (PS) B. Hanna 121.3.13 cold and warm magnets - PowerPoint Presentation

alexa-scheidler
alexa-scheidler . @alexa-scheidler
Follow
343 views
Uploaded On 2019-11-04

121.3.13 cold and warm magnets Power Supply (PS) B. Hanna 121.3.13 cold and warm magnets - PPT Presentation

121313 cold and warm magnets Power Supply PS B Hanna 121313 cold and warm magnets Power Supply PS Major goals milestones T4 Milestones Power Supply ready for HWR in PIP2IT RampD Phase ID: 763235

power 121 system supply 121 power supply system pip warm ssr1 ready beam ssr2 line transfer phase cold units

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "121.3.13 cold and warm magnets Power Su..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

121.3.13 cold and warm magnets Power Supply (PS) B. Hanna

121.3.13 cold and warm magnets Power Supply (PS) Major goals/milestonesT4 - Milestones Power Supply ready for HWR in PIP2IT (R&D Phase) Power Supply ready for SSR1 in PIP2IT (R&D Phase ) Power Supply ready for PIP-II SSR1 (CM2) (Construction Phase) Power Supply ready for PIP-II SSR2 ( Construction Phase ) Power Supply ready for PIP-II Warm Units ( Construction Phase ) Power Supply ready for PIP-II Beam Transfer Line (Construction Phase)

121.3.13 cold and warm magnets Power Supply (PS)Proposed WBS for BOE 121.3.13.1 T4 Milestones 121.3.13.2 Project Management and Coordination 121.3.13.3 PIP2IT Power Supply System for HWR and SSR1 (CM1) 121.3.13.4 PIP-II SSR1 (CM2) Power Supply System 121.3.13.5 PIP-II SSR2 (1 st -7 th CM) Power Supply System 121.3.13.6 PIP-II Linac Warm Units Power Supply System 121.3.13.7 PIP-II Beam Transfer Line Power Supply System

121.3.13 cold and warm magnets Power Supply (PS)Proposed WBS for BOE 121.3.13.1 T4 Milestones 121.3.13.2 Project Management and Coordination 121.3.13.3 PIP2IT Power Supply System for HWR and SSR1 (CM1) 121.3.13.3.1 Power Supply System Design, including QPM and controls design 121.3.13.3.2 QPM Procurement 121.3.13.3.3 QM testing and optimization 121.3.13.3.4 Power Supply System Procurement, including power cablings 121.3.13.3.5 Installation and Commissioning 121.3.13.4 PIP-II SSR1 (CM2) Power Supply System 121.3.13.4.1 SSR1 (CM2) Power Supply System Procurement 121.3.13.4.2 SSR1 (CM2) Test/Assembly before installation in PIP-II final location 121.3.13.5 PIP-II SSR2 (1 st -7 th CM) Power Supply System 121.3.13.5.1 SSR2 (1 st -7 th CM) Power Supply System Design 121.3.13.5.2 SSR2 ( 1 st -7 th CM) Power Supply System Procurement 121.3.13.5.3 SSR1 ( 1 st -7 th CM) Test /Assembly before installation in PIP-II final location 121.3.13.6 PIP-II Linac Warm Units Power Supply System 121.3.13.6.1 Warm Units Power Supply System Procurements for Quadrupoles and Correctors 121.3.13.6.2 Warm Units Power Supply System Test/Assembly before installation in PIP-II final location. 121.3.13.7 PIP-II Beam Transfer Line Power Supply System 121.3.13.6.1 Beam Transfer Line Dipoles Power Supply System 121.3.13.6.2 Beam Transfer Line Quadrupoles /Correctors Power Supply System

121.3.13 cold and warm magnets Power Supply (PS) Some additional comments if the SSR2 solenoids need a dump  some design work are required. The current system will have capabilities to include a dump. Calculations need to be done by I. Terechkine . The beam transfer line work does NOT include the PS for the septum magnet, the fast switching magnet or the beam dump switch. Cabling and electrician work for PIP2 is outside of scope. Identify Critical Procurements. As part of the QPM we will need a Cryo status input to indicate that the cryo system is ready