Text Building and Lab operations for Facility and outside vendors Text Building and Lab operations for Facility and outside vendors

Text Building and Lab operations for Facility and outside vendors - PowerPoint Presentation

amey
amey . @amey
Follow
85 views
Uploaded On 2023-09-24

Text Building and Lab operations for Facility and outside vendors - PPT Presentation

5242023 Antenna Development Section Manager Alex Fonseca Point of Operations 2 Building and Lab Facility Support Operations EMNonFlightFlight hardware come in many shapes and sizes Be mindful of your surroundings and always try to stay at least 3ft away from hardware that may be on a wor ID: 1020491

personnel area work lab area personnel lab work esd hardware controlled management facility building signage sensitive prior support performing

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Text Building and Lab operations for Fac..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. Text

2. Building and Lab operations for Facility and outside vendors5/24/2023Antenna Development Section ManagerAlex FonsecaPoint of Operations2

3. Building and Lab Facility Support OperationsEM/Non-Flight/Flight hardware come in many shapes and sizes. Be mindful of your surroundings and always try to stay at least 3ft away from hardware that may be on a work bench, table or other surfaces.If work is around a test or assembly bench, ask area manager or area personnel if it is safe to perform work (don’t assume that there is no hardware present)Try to schedule/coordinate work with area management ahead of time so they can clear area if possibleDo not touch or move any totes, carts, or equipment. Adhere to any signs and stanchions posted by area personnel. Do not move or remove any stanchions. Stop and notify area personnel to gain access beyond any signage.If work to be performed is near or around hardware, notify area personnel prior to performing work. 3WHEN IN DOUBT CONTACT AREA MANAGEMENT/PERSONNEL PRIOR TO PERFORMING WORK NEAR OR AROUND HARDWAREExample of Caution signExample of stanchion with hardware presentExample of Hardware on table

4. Building and Lab Facility Support Operations4If area personnel are not visibly available, area management contact information should be listed at the entrance of each lab/area.When entering a lab/area please pay attention to all posted door signage and messages as they may contain important information needed to enter the premises.Door Signage Example 1Door Signage Example 2

5. Building and Lab Facility Support OperationsFloor tape markings are used to indicate controlled areas and boundariesNever enter an ESD controlled area unless authorizedSafety awareness and authorized entry zones may also be identified by multiple colored tapes or specific signs5ESD Controlled AreaNon-ESD AreaESD Controlled AreaDesignated Delivery AreaSome Labs have electronic components, parts, and assemblies that are treated as ESD sensitive items regardless of whether they are sensitive or notESD protective garments and grounding equipment must be worn at all times within an ESD controlled area (unless they may result in safety risks to personnel, such as during high voltage testing). Facilities services may not need special ESD garments, please check with area management prior to entering lab.Only trained personnel are allowed to come within 3 feet of ESD workstations or exposed sensitive itemsThis is commonly referred to as “the three foot rule”ESD Hardware Markings

6. 6