Download The PPT/PDF document "Report by LST-SYS coordinator" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Report by LST-SYS coordinator
M.Teshima
Max-Planck-Institute for Physics
Slide2Current Key Participants-I
CTA-Proto-LST structure
Structure
LST SYS
M.Teshima
LST STR
T.Schweizer
LST CAM
O.Blanch
About 50 people subscribed in CTA-proto-LST
Slide3Current key participants-II
Institutes/members
MPP;
P.Collin
, T.Schweizer, E.Lorenz,
R.Mirzoyan
, M.Teshima, R.Wagner,
D.Fink
,
O.Reimann
, H.Wetteskind,
C.Jablonski
Telescope structure, Camera, MC
IFAE;
O.Blanch
,
M.Martinez
,
D.Mazin
,
J.Cortina
,
M.Barcelo
,
Camera, Telescope Bogie, Physics
LAPP;
G.Lammana
,
G.Deleglise
,
L.Brunetti
Camera support arch structure, Driving system
IN2P3;
P.Vincent
,
P.Brunetti
,
F.Touissenel
,
Electronics
CEA;
P.Micolon
Alternative telescope design
CIEMAT;
E.Carmona
M.C. dedicated to CTA-LST
UCM;
J.A.Barrio
,
J.M.Miranda
Electronics
INFN Italy;
M.Mariotti
, R.
Paoletti
Mirror, Electronics
ETH/Zurich;
A.Biland
,
AMC
Japan;
H.Kubo
,
R.Orito
,
S.Inoue
,
R.Enomoto
FPI, Electronics, Mirrors, Physics
Maybe about 30 people are really interested in CTA-Proto-LST
Slide4Current Key participants
For individual elements
CTA-STR (Structure and optics)
Telescope structure MPP, CEA
Telescope Bogie MPP, IFAE
Telescope Arch LAPP, MPP
Telescope Drive LAPP
Mirrors INFN, Japan
AMC ETH,
U.Zurich
CTA-CAM
Camera Structure MPI, IFAE
Cooling MPI, CIEMAT?
FPI MPI, IFAE, Japan
Winston cone ??
Readout Electronics INFN, Japan, IN2P3
Trigger IFAE
Slide5Options for technologies
Telescope Structures
MPP+MERO+LAPP Design (full CFRP
Space frame structure)
CEA alternative (CFRP mirror mount, steal under-structure and pit)
Camera
Sealed camera with low weight, low power consumption
FPI
Hamamatsu R8619, Electron Tube XXXX (not yet delivered)
Readout
Dragon,
Nector
, (Target?)
Slide6Project Plan
Baseline Design Doc (BDD)
Detail Design
Technical Report
Prototype of elements
Prototype Report
Final Design Doc
Prototyping of LST (beginning of 2013)
Slide7Resources-I
PP budget will support a part of the following actions
Testing CFRP elements (Only critical elements)
Design by MERO (2nd / 3rd iteration)
FPI development of PM with Hamamatsu
Missing significant part of prototyping
Individual groups must look for the resources
Slide8Resources-II
Problem: We can not enjoy the cost reduction in the mass-production. Everything must be very close to the market price. No big discount from industries.
Rough estimation by M.T.
(Total LST Proto project may cost about 8-9MEuro)
Structure (3MEuro)
Telescope Structure Prototyping
2000KEuro
Foundation
500KEuroDriving sys/Motors 500KEuro?
Camera (2.5MEuro)
PMTs
for Proto-Camera (3000PMTs)
1000KEuro
Readout Electronics (3000ch)
1000KEuro
Slow control, LV, HV, etc (3000ch)
300KEuro
Cooling /Humid. Control
200KEuro
Optics (1.5-2MEuro)
Mirrors (400m2)
1000KEuro
AMC (400 units)
400KEuro?
Others (1MEuro)
Local labors, Calibration system, Online System, UPS, Shipping, contingency
Slide9Resources-III
We need to define the specification/requirements and design of LST
asap
, and then estimate the cost for
for development (
PMTs
,
Mirrros
, CFPR tubes, electronics, etc.)
for Prototyping (the first telescope)
for Mass production (7 more telescopes)
For examples, offers for 3000PMTs and 150,000PMTs are quite different
Slide10Critical Path
We need the dedicated MC for LST
For the optimization of F/D and FOV
Structure will require
F/D = 1.2, FOV=4 degrees, 2ton cameras
If the requirements exceed these numbers, the current design will experience the significant change/modification
Slide11Risks
I do not see any significant risks at a moment, but we need to list up all possible risks at least before starting prototyping.
Slide12Cost estimate
It is now on-going by T.S. and O.B.. They will deliver us reliable numbers with our best knowledge.
We need three costs
Cost for developments/prototyping elements
Cost for prototyping LST
Cost in the construction phase (mass production)