Custom Projects Any Energy Savings Capital Measure that is not covered by Standard Spreadsheets AND is a proven technology If you have a project idea with verifiable energy savings let us know ID: 676879
Download Presentation The PPT/PDF document "Lucie Huang | May 20, 2014" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Lucie Huang | May 20, 2014
Custom ProjectsSlide2
Any Energy Savings Capital Measure that is not covered by Standard Spreadsheets, AND is a proven technology.
If you have a project idea with verifiable energy savings, let us know.
It is probably eligible for funding!
What is a Custom Project?Slide3
New Construction beyond Code
Industrial Processes
Data CentersControls
Ventilation / Economizer
Common Sources of Custom ProjectsSlide4
Oversize ducts
Heat Recovery
Data Center
Increase economizer hours
Decrease economizer hours
Some ExamplesSlide5
Funding for energy conservation:
Custom Incentive RatesSlide6
Bypass cooling/heating coils in airstream to reduce pressure drop and fan energy
Example – Bypass Dampers
250
hp
total fan power
110,000 kWh/
yr
savings
$29,000 incentiveSlide7
Submit Application
Meet with your SCL EMA
Submit Custom Incentive Proposal
Review
proposal
and
documents
with EMA
EMA will draft a Custom Incentive Agreement
Customer
signs Incentive Agreement with
SCL
– before ordering or installing
equipment
SCL Custom Incentive ProcessSlide8
Baseline
Establish and clearly describe baseline operating conditions and energy consumption.
Schematics / drawings / trend data
Description of existing building systems & controls.
Proposed
Detail planned changes & how energy is reduced
Define controls sequence and
set points
.
Energy savings calculation methodology & spreadsheet.
Cut sheets
& schematics.
Custom Incentive ProposalSlide9
Incentive Contract must be signed by both the customer and Seattle City Light
BEFORE
any equipment is purchased or installed.When can I implement my project?Slide10
Apply
Early
& OftenDocument
the baseline conditions
Equipment
I
nventory
Summarize changes that deliver energy savings
Be specific!
Reduced fan power
Additional economizer hours
Provide electronic copy
of calculation
spreadsheet
Tips & TricksSlide11
SCL
It’s a Team Effort
OWNER
TRADE
ALLYSlide12
Compile Payment Package:
Inspections of completed project
Submit M&V
Submit documents:
Final paid invoice
Final as-building drawings
&
control sequence
Test reports
ECMs are Implemented – Now What?Slide13
Final trend data in Excel format, 15 minute increments with same time stamp for all data
Final equipment list
Final set points
Screen shots
Measurement & VerificationSlide14
Read the
contract
Know what’s required for payment
Be prepared for trending
Track invoices or payments if it’s a long term project
Tips & Tricks for Payment
Tell your EMA that the project is complete
Intermediate inspectionsSlide15
Colocation site
Data Center Cold Aisle Containment
$40,000 Incentive
70% cost capSlide16
Get Started:
Please contact us
BEFORE
you start so that we can discuss eligibility and help you with the rebate process.
Visit us online:
www.seattle.gov/light/conserve
Call us:
(206) 684-3800
Seattle City Light
Energy Advisors
Email us:
SCLEnergyAdvisor@seattle.gov
Contact Conservation Resources Slide17