Distribute to contractors Post on HSE Notice Boards Include in site HSE Induction PDO Safety Advice Date 10 th August 2014 Injury Fracture of little finger What Happen While ID: 403807

learning hse box tubular hse learning tubular box ensure 2014 hands communication door crew address proper hemp beam derrickman

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "1 Use this Alert: Discuss in Tool Box Ta..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1

Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to contractors  Post on HSE Notice Boards  Include in site HSE Induction

PDO Safety Advice

Date: 10th August 2014Injury: Fracture of little fingerWhat Happen: While box end of DP got held up on work floor level, driller continued slackening the winch line. The Floorman pushed the DP down the V door with his leg causing the DP drifting out of V-Door and the Box end hanging close to the sub-structure beam . As to recover the pipe, the Derrickman placed his right hand into the Box End and signaled the Floorman to pick up the DP. The DP lifted trapping the Derrickman fingers between the DP & substructure beam.Learning from this incident:Ensure adequate communication between crew involved in to the activityDo not place hands at the pinch points, if possible do the task hands offEnsure observing the job activity and proper supervision for all tasksEnsure procedures being complied Empowerment to stop

Ensure proper communication and do tasks hands off where it is possible.

Contact

:

MSE34

for further information or visit the

HSE Website

Learning

No29 10/08/2014Slide2

2

Distribute to contractors  Post on HSE Notice

Boards

Contact: MSE34 for further information or visit the HSE Website Learning No29 10/08/2014Management learning'sDate: 10th August 2014Injury: Fracture of little fingerAs a learning from this incident and ensure continual improvement all Contract Managers are to review

their HSE HEMP against the questions asked below:Does your standards/ procedures address the handling of tubular during LD/ PU in detail ?

Is there a clear method of communication during operations on Rig floor?Is there a clear method of recovering tubular when it is out side of V-door?

Does your HSE HEMP address hazards of not double wrapping tubular and dropped tubular?Do you have a system to ensure actions from lateral Learnings are implemented?Is

the alert/learning advice understood by the crew members?