Operations expected to resume in September Tests ready for September ChDR theory validation cBPMs continuation of BL via EOSD Xrays ChR any other Vacuum test stand location for invacuum tests identified 730 mm long 40 mm ID: 1030850
Download Presentation The PPT/PDF document "CLEAR planning CLEAR in shutdown, machin..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
1. CLEAR planningCLEAR in shutdown, machine commissioning started. Operations expected to resume in September Tests ready for September?ChDR theory validationcBPMscontinuation of BL via EOSDX-rays ChR…any other?
2. Vacuum test standlocation for in-vacuum tests identified: 730 mm long, 40 mm dia straight after cBPMs. Target location of Xrays ChR testMME will update the layout. Need to produce supportcompatible with different vacuum chamberstransverse / vertical mover needed?
3.
4.
5.
6. Digital camera upgradeAt present we have8 digital cameras (cfv-2010-btvclear) 7 analog cameras (cfv-2010-btvclex1) 6 analog cameras (cfv-2010-btvclex2)
7. Digital camera upgradeAt present we have8 digital cameras (cfv-2010-btvclear) 7 analog cameras (cfv-2010-btvclex1) 6 analog cameras (cfv-2010-btvclex2)
8. Digital camera upgradeSW: FESA Class “BTVDC” available, but GUI missing. Preliminary version should be ready 1st half of August, final version will be developed by new member of SW team starting 1st Sept (Until then: PyBasler)HW: started procurement of equipment. PoE switch located in KG connected to FECCables (eth + coax): need to be pulledTwo additional positions for new injector in PHIN