Download Presentation The PPT/PDF document "All Experimenters’ Meeting" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
All Experimenters’ Meeting
November 03, 2014
Photo by Greg VogelSlide2Slide3
Accelerator Operation Summary
Calendar Week # 44NuMI Weekly Integrated Intensity
5
.60
E18
protons Beam Hours To NuMI 147.2 hours
From :
October
27,
2014 (0000 hours)
To:
Nov
ember 03,
2014 (0000 hours)Slide4
Accelerator Operation Summary
Calendar Week # 44NuMI Weekly Integrated Intensity
7.95 E18
protons
Beam Hours To NuMI 145.4 hours BNB Weekly Integrated Intensity 5.76 E18 protons
Beam Hours To BNB
155.3 hours NMuon Weekly Integrated Intensity 3.49 E16 protonsBeam Hours To NMuon 130.6 hoursMTest Weekly Integrated Intensity 5.71 E14 protonsBeam Hours To MTest 105.8 hours
From :
October
27,
2014 (0000 hours)
To:
Nov
ember 03,
2014 (0000 hours)Slide5Slide6Slide7Slide8Slide9
AccessThursday – 8/21/14Beam off at 0600Keys available at 0700Install Refurbished Booster RF Cavity
Keys back at 1500Other jobs that fit during cavity changeBeam by beginning of evening shiftSlide10
Fall Shutdown Intensity Reduction PlanBegins Saturday, August 30
th @ 0800Main Injector will run $23 events instead of $2A events to NuMI (~80 KW reduction)Linac and Booster will meet program needsBNB should be unaffectedSeaQuest will go down from 4 turns to 3 turns.Beam off Friday, September 5th @ 0800Slide11
2014 ShutdownSix full weeks into the shutdownLinac and Booster Operational
Main Injector/Recycler startup todaySlide12
2014 ShutdownNuMI WorkBeryllium vacuum window leak
Replace windowHorn Stripline maintenanceWork complete by Monday, October 27th Switchyard WorkF1-F3 Vacuum recoveryOnce 46B work is doneImpact MI for ~3 hoursFeeder 43 maintenanceScheduled for Saturday, October 25
th
G1 Stub Magnet Installation
Magnet installed Leak check and final workFeeder 46B workPrevents daytime operation of switchyardExpected to be complete by end of weekVarious Safety System TestsMeson Center WorkMC6D-3Slide13
Complex StatusNuMI
Started upPerformed ScansLow intensity run until this morningIncreased intensity until tomorrowSwitchyardSigned off - October 31
st
Beam to Switchyard Absorber
SeaQuest
Working on target issuesMeson TestSign off later this week (Wednesday Morning?)Meson CenterMagnet replacement beginningBNBSetting up for another testPossibly next weekSlide14
Wilson Hall OutagesLow ImpactTues
day, October 10thPower to Wilson Hall (Entire site except Main Injector, Muon Campus, and Village)From 0700-0730MSS off KRSS backfeedSlide15
Upcoming IssuesIn July 2015 we will need to power the entire site (except the village) off of Kautz
Road SubStation (KRSS) for a year while operatingA new Master SubStation (MSS) will be built beside the old oneWe have the capacity, but don’t know if we can run a Physics ProgramPossible noise on the lines
Expect some problems with the Proton Source
Planned on starting up from the shutdown with the site on KRSS to test
Gives us some time to address
problemsWe don’t know what impact it may have on the rest of the LabWill lights flicker?Will processes be sensitive to the Main Injector ramp?Slide16
When do we test?Met with FESS and AD Departments to discuss possible test dates and impacts to schedules
Met with Division/Section power representatives to confirm test dateLocked in a test starting date – Tuesday, November 4th
The duration of the test will depend on the results
If we can operate, stay on KRSS for some time to allow the Lab to cycle through its normal power usage. Look for an agreeable time to switch back.
If we cannot operate, switch back to using both substations after a few days, apply fixes, regroup, retest
Worked with FESS HV to put together a likely schedule for the rolling power outages across the lab while the power feeds are being configuredSlide17
Rolling Outage Times(Estimated)Slide18
Wilson Hall Power OutagesSaturday,
October 18th – Sunday, October 19thPower outage to Wilson Hall0700 – 1600 SundayWilson Hall closed except authorized personnelRemote Operations Center West (ROC West) availableSaturday
,
November 8
st
– Sunday, November 9thRescheduled from Nov. 1st & 2nd Power outage to Wilson Hall0700 – 1600 Sunday (Last one ~2130 Sunday)Wilson Hall closed except authorized personnelRemote Operations Center West (ROC West) unavailableNeed to perform work impacting transfer switch on Saturday or SundayFurther scheduling and more details required – based on work accomplished this weekFriday, November 28th – Saturday, November 29th Rescheduled from Oct. 20th & 21st
Power outage to Wilson Hall
0700 – 1600 SundayWilson Hall closed except authorized personnelRemote Operations Center West (ROC West) availableCOMPLETEDSlide19
Schedules and Links:Schedule
can be accessed from the Operations Home Page- Schedules -> Operations Schedule Direct link to schedule- http://www-ad.fnal.gov/ops/schedule.html