Christian Irmler HEPHY Vienna C Irmler HEPHY Belle II New Collaborators Meeting Belle II Schedule httpsbelle2cckekjp twikibinviewDetectorBelleIISchedule Presented by Y Ushiroda at B2GM March 2013 ID: 799826

hephy irmler 2013 vienna irmler hephy vienna 2013 25th april christian svd ladder 2014 assembly august ready beam mount

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Schedule 25th April 2013" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Schedule

25th April 2013

Christian Irmler (HEPHY Vienna)

C. Irmler (HEPHY)

Belle II – New Collaborators Meeting

Slide2

Belle II Schedule

https://belle2.cc.kek.jp/~

twiki/bin/view/Detector/BelleIISchedulePresented by Y. Ushiroda at B2GM March 2013VXD ready by 8/2015VXD Installation 01/2016Physics Run 10/2016

2

Christian Irmler (HEPHY Vienna)

25th April 2013

Slide3

SVD construction schedule

http://www.hephy.at/project/belle/belle2svd/schedule/

3

Christian Irmler (HEPHY Vienna)

25th April 2013

MS Project 2010

Considers dependencies between tasks

Need information from collaborating institutes!

Latest version online (

including updates

by Toru)

Slide4

Milestones 2013

March: delivery

of Origami & PAMay: mockup evaluation done

mechanical design of ladders and mount blocks finalizedJune:

FADC & FTB & DATCON connectivity testJuly: mechanical design finished

of cones, shell, end flanges and heavy metal shields finished

August:

all parts for ladder assembly must be ready

September:

ladder

assembly

starts

ladder

mount procedure designed

Oct. – Dec. :

preparation of DESY

beam

test

November: SVD readout electronics ready for beam test4Christian Irmler (HEPHY Vienna)25th April 2013

Slide5

Milestones 2014+

January 2014: VXD beam test @ DESY

August 2014: all parts for ladder mount must be ready

ladder production should be almost completedSeptember 2014: start of SVD assemblyladder mount

installation of cooling pipes and servicescommissioningtesting, testing, testing, ….

5

Christian Irmler (HEPHY Vienna)

25th April 2013

Slide6

Sept. 2014 – Aug. 2015

6

Christian Irmler (HEPHY Vienna)

25th April 2013

August 2015:

SVD should be ready!

Sept. 2014 – August 2015:

~1 year for assembly, commissioning, system tests, …

only little contingency included

August 2015:

VXD (PXD+SVD) delivery

Slide7

Responsible persons

Mechanics, Cooling & Services

 I. GfallEnd flanges, shielding, support shell  S. Tanaka

Electronics  M. Friedl

, C. Irmler

Ladder assembly  C. Irmler, Y. OnukiL3  Melbourne, G. Taylor

L4  TIFR, R.

Kamesh

/G.

Mohanty

L5  Vienna, C. Irmler

L6  IPMU, Y. Onuki

Sensors

Barrel sensors, HPK

 T.

Tsuboyama

Trapezoidal sensors, Micron 

M.Valentan

/T.BergauerMockup  KEK, DESYThermal mockup  C.NiebuhrPrecise mechanical mockup  S. Tanaka

SVD

assembly and installation

Procedure, table and tool design  T.

Tsuboyama

, S. Tanaka

SVD assembly work  KEK, Vienna, (Tata, Melbourne) 

tba

7

Christian Irmler (HEPHY Vienna)

25th April 2013

Slide8

Responsible persons continued

Beam / system tests coordinationPXD

 C. MarinasSVD  M. Friedl

DAQ  T. HiguchiFTB, data link, copper, DatCon

 Cracow, KEK, BejingFTB

 W. Ostrowicz

data link  K. Hara

copper

 T. Higuchi

DatCon

 M. Schnell

Software

 A.

Bozek

DAQ, Slow control, Run / configuration database

Radiation, temperature, humidity monitoring

 T. Tsuboyama

8

Christian Irmler (HEPHY Vienna)25th April 2013

Slide9

Thank you

9

Christian Irmler (HEPHY Vienna)

25th April 2013

Slide10

Others

Please check the scheduleIf something is missing?

If something is wrong?Any delays / changes?Please tell me

10Christian Irmler (HEPHY Vienna)

25th April 2013