System development methodologies System development methodologies

System development methodologies - PowerPoint Presentation

luanne-stotts
luanne-stotts . @luanne-stotts
Follow
398 views
Uploaded On 2017-11-06

System development methodologies - PPT Presentation

Structured design Waterfall development Parallel development Rapid Application development Phased development Prototyping Throwaway prototyping Agile Development Extreme Programming XP Waterfall Development ID: 603162

system project design development project system development design time good analysis poor user requirements prototyping excellent activities planning work management programming plan

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "System development methodologies" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

System development methodologies

Structured design

Waterfall development

Parallel development

Rapid Application development

Phased development

Prototyping

Throwaway prototyping

Agile Development

Extreme Programming (XP)Slide2

Waterfall Development

PLANNING

ANALYSIS

DESIGN

IMPLEMENTATION

SYSTEMSlide3

Waterfall Development

Disadvantages:

Design must be completely specified on paper before programming begins

Use of paper specifications can result in misunderstanding of user requirements

Complex and lengthy – large amount of time elapses between analysis and delivery of the system – user needs may change

Advantages:

System requirements identified long before programming begins

Large degree of management control promotes documentation and ensures ability to trace user requirements thus minimizing changes to requirementsSlide4

Parallel Development

PLANNING

ANALYSIS

OVERALL

DESIGN

OVERALL

IMPLEMENTATION

SYSTEM

SUBDESIGN

SUBDESIGN

SUBDESIGN

SUBIMPLEMENT

SUBIMPLEMENT

SUBIMPLEMENTSlide5

Parallel Development

Advantages

Same as for waterfall development plus:

Time is reduced compared to the waterfall method which decreases the chances that user needs will change before the system is implemented

Disadvantages

Same as for waterfall plus:

Subsystems are not usually independent so changes in one subsystem can affect others

Additional work to coordinate and integrate subsystemsSlide6

Phased Development

PLANNING

OVERALL

ANALYSIS

SYSTEM

VERSION 1

V1 DESIGN

V1 IMPLEMENT

V1 ANALYSIS

SYSTEM

VERSION 2

V2 DESIGN

V2 IMPLEMENT

V2 ANALYSIS

SYSTEM

VERSION 3

V3 DESIGN

V3 IMPLEMENT

V3 ANALYSISSlide7

Phased Development

Advantages

Quickly gets a useful version into the hands of the users

System provides business value sooner compared to structured methodologies

Users able to provide feedback and discover important new requirements sooner

Disadvantages

User begins to work on a system that is intentionally incomplete

Problems with success and acceptance of the system can occur if the essential features are not identified for the first version.

Must manage user expectations in terms of having to wait for features that will be implemented in subsequent versions

Slide8

Prototyping

PLANNING

SYSTEM

PROTOTYPE

IMPLEMENTATION

SYSTEM

IMPLEMENTATION

DESIGN

ANALYSISSlide9

Prototyping

Advantages

Provides users with a system to interact with very quickly

Reassures users that the project is indeed progressing towards a finished system

Helps to refine requirements more quickly – users can interact with the prototype and better understand what it can and cannot do easier than if the system were on paper.

Disadvantages

Fast pace makes it more difficult to conduct a thorough analysis

Initial prototype could lead you down an ineffective path and once started, it is difficult to go back to the beginningSlide10

Throwaway Prototyping

PLANNING

DESIGN

PROTOTYPE

IMPLEMENTATION

SYSTEM

IMPLEMENTATION

DESIGN

ANALYSIS

ANALYSIS

DESIGNSlide11

Throwaway Prototyping

Advantages

Combines complete analysis and design with advantages of prototyping to refine key issues before that system is built

Tends to produce more stable and reliable systems than prototyping.

Disadvantages

Slower than prototyping since the design prototypes are thrown away and do not become part of the final systemSlide12

Extreme Programming (XP)

A team of users and developers document

user stories

Users describe user acceptance tests which will demonstrate that the system provides the required functionality once it is completed

Developers then plan a series of releases – no release to take more than a couple of months to completeGeneral principles:

Superficial planning processContinuous, automated testing (every day)Continuous integrationHeavy user involvement

Pair programmingSpecific attention to human interactions and limitationsSlide13

Extreme Programming

PLANNING

ANALYSIS

DESIGN

IMPLEMENTATION

SYSTEMSlide14

Extreme Programming

Advantages

Fast delivery of results

Works well in projects with undefined or changing requirements

Disadvantages

Requires discipline

Works best in small projects

Requires much user inputSlide15

Selecting a Methodology

Depends on:

Clarity of user requirements

Familiarity with technology

System complexity

System reliability requirementsTime available

Visibility of risk factorsSlide16

Selecting a Methodology

Ability to Develop Systems Waterfall Parallel Phased Prototyping Throwaway XP

With unclear user requirements Poor Poor Good Excellent Excellent Excellent

With unfamiliar technologies Poor Poor Good Poor Excellent Poor

That are complex Good Good Good Poor Excellent Poor

That are reliable Good Good Good Poor Excellent Good

With a short time schedule Poor Good Excellent Excellent Good Excellent

With schedule visibility Poor Poor Excellent Excellent Good Good

Structured

Methodologies

RAD Methodologies

Agile

MethodsSlide17

Selecting a Methodology

Use a little

common sense

What is critical? Enron Arthur Andersen & Co., LLP

WorldCom NortelSlide18

Selecting a Methodology

Requirements Clarity

Technology Familiarity

System Complexity

Reliability Concerns

Time SchedulesSchedule Visibility (Murphy’s Law)Slide19

Project Management

A

hot

skillProject Management Tasks: identifying project size create and manage work plan

staff the project control and direct the projectSlide20

Managing a Info. Sys. Project

Four Phases

:

Initiating

Planning

Executing

Closing Slide21

Three Attributes of an IT Project

System Quality and Functionality

Development Speed

Development Cost

The contemporary thinking is that the

Project Sponsor

gets to pick two, the Project Manager controls the thirdSlide22

Some typical causes of project failure

Not enough commitment from senior management

Not enough commitment to following an appropriate system development methodology - taking shortcuts

Not managing expectations well enough

scope creep

feature creepSlide23

More causes of project failure

Poor estimating techniques

Over optimism

Mythical man-month

Inadequate people management skills

A weak or problematic project team

Insufficient or inappropriate resourcesFailure to adapt to business changeFailure to stick with the plan

Failure to monitor the planSlide24

Creating a Work Plan

Identify Tasks

Estimate Completion Times

Create Deliverable Timetable

Suggest MilestonesSlide25

Project Parameters

From clear objectives, identify high level tasks

Milestones MUST be identified in advance

Recognize that historical time estimates have been poor (222%)Slide26

Negotiating scope

Scope:

Defined in terms of features (size), quality, time, cost, and resources

Also defined in terms of processes, data and stakeholders

Deliverable – a statement of work

May be much more than a section of the system proposal, particularly if it forms the basis for a contract with a consultantSlide27

Statement of Work

I. Purpose

II. Background

A. Problem, opportunity, or directive statement

B. History leading to project request

C. Project goal and objectives D. Product description

III. Scope

A. Stakeholders B. Data

C. Processes D. LocationsIV. Project Approach A. Route B. Deliverables

V. Managerial Approach A. Team building considerations B. Manager and experience C. Training requirements

(continued)Slide28

Statement of Work (concluded)

V. Managerial Approach (continued)

D. Meeting schedules

E. Reporting methods and frequency

F. Conflict management

G. Scope management

VI. Constraints

A. Start date B. Deadlines

C. Budget D. Technology

VII. Ballpark Estimates A. Schedule B. BudgetVIII. Conditions of Satisfaction

A. Success criteria B. Assumptions C. RisksIX. AppendicesSlide29

Estimating Project Size

Expert Opinion goes a long way

Consultants tend to have a proprietary application for this

a significant expertise to bring to a project

Can use historical data (if it exists)

Algorithmic Models Exist (COCOMO)Slide30

Estimating Project Size

An example: IBM

s Function Point Approach

Calculate inputs, outputs, queries, files and interfaces

determine complexity of each, and factor it to determine overall project size convert to lines of code (based on a standard)Slide31

Estimating Time and Effort

Effort: convert from lines of code to person-months (i.e. COCOMO estimates)

Time: schedule time converted from person-monthsSlide32

A Notable Technique:

Timeboxing

Develop a

‘hard’

end dateSystem delivered on time in whatever state can be achievedPopular with software production Something is delivered in the

‘timebox’Slide33

Executing the Project

executing the baseline plan by:

selecting/training/managing the people on the project

getting resources

e.g. space, computers

monitoring progress and adjusting the plan

manage changes to the statement of work

maintain project workbook communicate the project statusSlide34

Techniques: Representing and Scheduling Projects

Several Methods

pen and paper

GANTT chart

PERT charts: arrows and nodes, critical path

in all cases

determine tasks

determine times

determine sequenceSlide35

Gantt Chart

Graphical representation of project showing each task activity as a horizontal bar

length of horizontal bar represents time to completion

visual display of the duration of activities in the project

estimated and actual times can be displayed

most useful for small projects or sub projects (due to number of activities) Slide36

A Gantt ChartSlide37

Gantt Chart showing Progress on Activities versus Planned DurationsSlide38

PERT Chart

PERT (Program Evaluation and Review)

graphic representation of task activities and their inter-relationship

the ordering of the activities is shown by connecting activities with arrows

the arrows indicate the sequence of activities

two arrows emerging from one activity indicate the new activities can be accomplished in parallel ( at the same time)Slide39

A PERT ChartSlide40

Useful risk reduction practices

Prepare 3 estimates – worst, best and estimated, and compare to actuals

Use standard notations and methodologies

Use CASE and other automated project management and control tools

Practice iterative development and

time boxing”Use a formal change-request process

Create “Centers of Excellence

” or specific expertiseRe-use components

Define and use metricsInstitute version control