Singh NITI Aayog 1432016 Policy Perspectives Urban Mobility Session Outline Urbanisation Facts Trends Policies and challenges Perspectives on Mobility Supply vs Demand ID: 565800

metro urban rail cities urban metro cities rail source transport hmr amp hyderabad city smart cost station mobility india

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "1 Jeetendra" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1

Jeetendra

Singh NITI Aayog14.3.2016

Policy Perspectives Urban Mobility Slide2

Session Outline

Urbanisation Facts, Trends, Policies and challenges Perspectives on Mobility – Supply

vs Demand Linkages between Urban Planning, Urban form and MobilityTransport Mode Choice Policy initiatives National Urban Transport Policy Transit Oriented DevelopmentIndia’s Urban Rejuvenation Mission Financing Urban Mass Rapid Transit Slide3

Urbanization is a recent phenomena worldwideIndia’s

urban population is 377 million (31% of total) (census 2011)Urbanization level is low compared to 45% in China, 54% in Indonesia, 78% in Mexico and 87% in Brazil

Growth rate of urban population Annual Growth Rate: 1970s: 3.8%, 1980s: 3.1%, 1990s: 2.73%, 2001-2011: 2.76%Urban areas contribute 63% of GDP Urban areas constitute 3% of land areaUrban Development a State subject - 29 States & 7 Union Territories3

Urbanization FactsheetSlide4

Key Trends in Urbanisation (India)

Large increase in towns

– emergence of census towns2001: 5161 towns 2011: 7,933 towns Concentration of urban population in large cities70% of urban population lives in 468 agglomerations with population more than 1 lakhLarge chunk in metros: 53 million plus cities (43% of urban populatSprawling of cities Low densities Growth of peri-urban areas Slide5

Urbanisation levels vary widely (India)

Urbanization levelsStates/UTsHighDelhi (97.5%), Mizoram (51.5%), Tamil Nadu (48.5%), Kerala (47.7%), Maharashtra (45.2%), Gujarat (42.6%) Medium

Punjab (37.5%), Andhra Pradesh (33.5%), West Bengal (31.9%), LowUttar Pradesh (22.3%), Odhisha

(16.7%),Assam (14.1%), Bihar (11.3%), Himachal Pradesh (10%) Slide6

Sources of increase in Urban Population (India)

6Slide7

200m new urban residents by 2030

(India)

City population category

590m

377m

Source: ITDPSlide8

Urban Development in India

Source: NITI-CSTEP Report on Smart Cities Workshop, Sep 2015Slide9

Key challenges of urban areas

Creation of more jobs

– Cities as “Engines of Economic Growth” – Transport as wheelsFrom 1952 to 2014-15: share of agriculture & allied activities in GDP reduced from 51% to 16% whereas labour force employed in these sectors reduced only from 70% from 54.6% Lack of infrastructure & basic amenities - water, sewerage, drainage, affordable housing, affordable public transport,

non-motorised transport (pedestrian & cycling tracks). This leads to Inefficiencies & low productivity High coping cost for low income groups/migrants/unorganized sector - non inclusive

Difficulties for businesses/industryHigh energy footprint Lack of proper solid and liquid waste management Pollutes ground and water bodies – sustainability issuesGovernance

Disaster Resilience

9Slide10

Issues in mobility with increasing Urbanisation

Access to

labour markets, education and leisure difficult – explosive growth of motor vehicles Sprawling cities discourage NMT – higher cost of travel for poorSafety - increased accidents and fatalities Congestion Energy intensityAir pollution -health impacts Slide11

How people in India’s top 53 cities commute to work

Public Transport

Less than 20%in 33 cities, 20%-30% % in 11 cities, 31-40% in 7 cities, 44% in 2 cities - Mumbai, VasaiVirarExceptions – Greater Mumbai Region and Kerala citiesOnly 1/4 to 1/3 residents use private Motor Vehicles but it receives the most attentionCycle/FootMore than 50% in 4 cities Between 40 to 50% in 10 cities Between 30 to 40% in 24 cities Between 20 to 30% in 14 cities

17% in 1 city Source: Census 2011, Live Mint, Nov 30, 2015Slide12

More Roads & Vehicles but what about Mobility ???Slide13

Cities for cars or people?Slide14

Over a third of trips on foot

BUT

WHERE ARE THE FOOTPATHS?Slide15

Is this common??Slide16

Will increasing supply of infrastructure solve the problem? Slide17

Urban Spatial Structures and Mobility

Deciding the preferred urban spatial structure

Intensify the density of existing built up areasExtend the city at the fringes of the built up areaMultiply nodes by building satellite towns (Delhi NCR) Deciding the land use Deciding densities Dispersed patterns – single use, low density: sprawls

Fragmented patterns – patches of high density single use pockets connected by highways Compact patterns – mixed use, medium/high density (TOD) Slide18

Our sustainable transport agenda

Public Transit

Walk & Bike

New

Smart Mobility (shared)

Transit Oriented Dev’t

Mobility Planning & Data

Travel Demand

Mgmt

(parking & congestion management)

What we

need to do ?

Source: ITDPSlide19

National Urban Transport Policy (India)

VISIONPlan for people not for vehicles - people at centre stage

Make cities most livable in the world Cities to act as “Engines of Growth” Evolve urban form best suited for unique geography of city and support main social and economic activitiesEncourage growth of urban transport along low carbon path Slide20

NUTP Objective

Plan for the people rather than vehicles by providing mobility and accessibility to all citizens to jobs, education, social services and recreation at affordable cost and within reasonable time Slide21

Realizing NUTP Objectives

AVOID – SHIFT – IMPROVEIncorporate urban transport planning at urban planning stage and not as a consequential requirement

Integrate land use with transport planningEquitable allocation of road space; people as the focus not vehiclesComprehensive Mobility Plan for citiesModal Mix priority NMT (pedestrian, cycle) Public Transport Personalized motor transport Slide22

Realizing NUTP Objectives

Why?

Work, School, Shopping, RecreationWhen? Peak/Off-PeakDay/EveningWeekday/WeekendWhere?

CommunityNeighborhoodCity

How? Walk or CyclePublic Transport Car/MotorbikeTRANSPORT DEMAND MANAGEMENTSlide23

Realizing NUTP Objectives

Transit Oriented Development Control the use of personal motor vehiclesPedestrianised

areasCar limited zones Congestion pricing zones High parking charges Planning for Freight Traffic Reduce pollution levels through changes in traveling practices, better enforcement, stricter norms, technological improvements, etc Focus on multi-modal integration, seamless travel across modesSlide24

Realizing NUTP Objectives

Build capacity to plan sustainable urban transportInnovative financing – land as a resource Involve private sector - tap their strengths

Promote cleaner technologies Intelligent traffic management systemsParticipatory approach Slide25

City population category

Small

Medium

Large

Walking &

Cycling Infra

Buses &

Paratransit

BRT / LRT

-

Metro

-

-

Transport Modes choice by

C

ity

SizeSlide26

Comparing Public Transport Modes

Investment

CapacitySpeed ReliabilityEnvironmental ImpactBusLow

MediumLowLowHigh

BRTMediumHighHighHighMedium

Light RailHighHighHighHighVery Low

MetroVery LowVery HighVery HighVey HighVery Low

Source: UN-HABITATSlide27

Capital Cost vs Capacity

Capacity (per/

h/d)Capital cost (USD/Km)Capital cost/CapacityTwo lane highway200010m - 20m5000-10000

Urban street (car only)8002m – 5m2500-7000

Bike path (2m)350010000030Pedestrian path (2m)4500100000

20Bus Lane100001m – 5 m300-500Bus Rapid Transit

5000-400001m – 10 m200-250Light rail10000-3000010m – 25 m800-1000

Commuter

Rail

20000-40000

40m – 80 m

2000

Metro Rail

20000-70000

40m-80m

2000-5000

Source: UN-HABITATSlide28

Rapid Transit WorldwideSlide29

A Cohesive Institutional Framework

Multiple OrganisationsMultiple Laws

29Slide30

Issues in establishing Lead Institutions

Legal BasisJurisdiction Functions

Planning Infrastructure Provision Regulation Operation of services Management structure Financing structure Slide31

Urban Metropolitan Transport Authority (UMTA)

Better coordination in planning & implementing urban transport projects

Integrated planning – land use + transport Integrated transport service Integrated management Eliminates overlaps & confusion Hyderabad, Chennai, Pune and Kochi have set up UMTA Slide32

Four Mega schemes to transform Urban India

Atal Mission for Urban Rejuvenation and Transformation (AMRUT) Smart Cities Mission

Housing for All by 2022National Heritage City Augmentation and Development Yojana (HRIDAY) Central Assistance of over 31 billion US Dollar (Rs 2 lakh crore) in 5 years Slide33

Atal Mission for Urban Rejuvenation & Transformation

(AMRUT)

500 citiesElements covered Universal coverage of piped drinking water and sewerage/septageGreen spaces/parksDrainage Non-Motorised Transport – walkways and cycle track City Bus

Funding – Rs 50,000 crore from Centre, equal share from States/ULBs

Flexibility – bottom up approach Incentive for Reforms Slide34

Smart City Mission

100

Smart cities Outlay from Centre Rs 50,000 croreSelection through a challenge processA Smart City will havebasic infrastructure, uses ‘smart’ solutions to make infrastructure and services better, and relies on Area based developmentSlide35

Smart Cities Mission Objectives

Provide basic infrastructure

Quality of life & LivabilityClean and sustainable environment.Apply Smart Solutions – make services & infra betterSet examples to be replicated both within and outside the Smart City and catalyze the creation of similar Smart CitiesSlide36

Smart Cities Mission Strategy

Develop Areas step-by-step – three models of area-based developments

Retrofitting,Redevelopment,GreenfieldPan-city initiative in which at least one Smart Solution is applied city-wide.Slide37

City wide Smart SolutionsSlide38

"In situ" Slum Redevelopment

Using land as a resource

With private participation Extra FSI/TDR/FAR if required to make projects financially viable

Housing For All (Urban)

Housing shortage – 20 million

Credit

Linked SubsidyInterest subsidy for EWS /LIG

for

new/

incremental

housing

6.5% for loan

upto

Rs 6

lakhs

, tenure of 15 years

Higher tenor/loan sizes admissible

Affordable

Housing in

Partnership

Private/

public sector including

p

arastatal

Central

Assistance

@ Rs 1.5

lakh

/

EWS house

where

35% of constructed houses are for EWS category

Subsidy

for beneficiary led individual house

construction

For

individuals of EWS category requiring individual house

State

to prepare a separate project for such beneficiaries Slide39

Financing Urban Infrastructure Mass Rapid TransitSlide40

Capital Investment required in Urban Sector

40

Source: Isher Ahluwalia High Powered Expert Committee report (March 2011) In Rs lakhCroreSlide41

Private sector involvement Brings investment

Improves service quality through better management and efficiencies Outcome based approach allows scope for innovation, reduces costs; Life cycle approach - tackles the maintenance issues; Traditional construction contracts suffer from huge time and cost over-runs – almost twice the initial estimates

Creation of institutions, streamlined processes and standardized documents increase capacity to design and execute projectsFinancing Urban Infrastructurethrough Private investmentSlide42

PPP: The financial model Slide43

PPP: the Biding parameter

Option 1 - Tariff based bidding

Specify minimum quality of service, concession period and offtake Award Concession to the Bidder proposing the lowest TariffOption 2 - Grant/Premium based bidding Specify minimum service, maximum tariff and concession period Award Concession to the Bidder asking the lowest GrantOption 3 - Annuity based biddingSpecify concession period and technical parameters. Award Concession to the Bidder bidding the lowest project costSlide44

Policy guidelines for PPP Projects

Approval and Appraisal

Guidelines on Formulation, Appraisal and Approval of PPP projects (PPPAC)Financial Support Guidelines on Financial support to PPP projects (VGF scheme)Scheme for financing through India Infrastructure Finance Company (IIFCL)Bidding Framework (word files available on website) Model RFP for selection for Technical, Financial and Legal Advisers Model RFQ for PPP projects

Model RFP for PPP projects Slide45

Viability Gap Funding scheme

Financial support in form of grant of 20% (+ 20%) of total project cost

Concession Agreement between Govt and a private entity Concessionaire selection through open competitive bidding Project to provide service against payment of pre-determined user chargeBidding criteria: VGFVGF disbursement after equity infusion by Concessionaire

Approval by Empowered Institution and Empowered Committee Slide46

Mixed Traffic

Traffic Grid lock-

Oliphanta

,

Secunderabad

Hyderabad Traffic – Inadequate Public TransportSlide47

Miyapur

Ameerpet

Jubilee Bus Station

Parade Grounds

Falaknuma

L.B.Nagar

Nagole

Shilparamam

JNTU

KPHB Colony

Kukatpally

Balanagar

Moosapet

Bharat Nagar

Erragadda

ESI

S.R.Nagar

Panjagutta

Irrum Manzil

Khairatabad

Lakdi-ka-pul

Assembly

Nampally

Gandhi Bhavan

OMC

Malakpet

New Market

Musarambagh

Dilsukhnagar

Chaitanyapuri

Victoria Memorial

Gandhi Hospital

Musheerabad

RTC X Road

Chikkadpally

Narayanaguda

Sultan Bazaar

Salarjung Museum

Charminar

Shalibanda

Shamsheergunj

Jangammet

Uppal

NGRI

Habsiguda

Tarnaka

Mettuguda

Secunderabad

Paradise

Rasoolpura

Prakash Nagar

Begumpet

MadhuraNagar

Yusufguda

Jubilee Hills Road No.5

Jubilee Hills Check Post

Peddamma

Temple

Madhapur

Durgam

Cheruvu

Hitec City

Hyderabad Metro Rail Corridors

3

Traffic corridors (

72 km

) in phase I. Cost

Rs. 14, 132 Cr.

1.

Miyapur

L.B.Nagar

: 29 km; 27

stns

2. Jubilee Bus Station –

Falaknuma

: 15 km; 16

stns

3. Nagole –

Shilparamam

: 28 km; 23

stns

1

2

3

2

1

3

Survey of India

M.G.Bus Station

Secunderabad R.S

Metro Rail Interchange

Ameerpet

Parade Grounds

M.G.Bus Station

MMTS Integration

Bharat Nagar

Khairatabad

Malakpet

Lakdi-ka-pul

Falaknuma

Begumpet

Integration with

Rail Terminals

Nampally

Secunderabad

Begumpet

Integration with

Bus Stations

Miyapur

M.G.Bus Station

Jubilee Bus Station

Dilsukhnagar

Charminar

Koti

Falaknuma

Uppal

Rethifile

(Raidurg)

3

Cyber Gateway

Source: Hyderabad Metro Rail (HMR)Slide48

Financial Plan

Project Cost - Rail System

Rs in

Crore

Metro Rail

 

EPC

10674

IDC

1942

Other Costs

1516

Total

14132

 

 

Real Estate-TOD 1

 

EPC

1721

IDC

279

Other Costs

243

Total

2243

 Total Project Cost for FC

 16375

Means of Finance

 

 

Metro Rail

 

Equity

2768

Debt

9906

Grant (Equity Support)

1458

Total

14132

 

 

Real Estate-TOD 1 (6 m

sft

)

 

Equity

671

Debt

1572

Total

2243

No. of Participating banks

10 nos.

Tenure

15 Years

Interest Rates

225 basis points over the Base rate of SBI

Rs in

Crore

Source: Hyderabad Metro Rail (HMR)Slide49

Lenders’ Engineer

Consultants for Carbon Credits

Independent Engineer : Louis Berger, USA

Safety Consultant :

Eptisa, Spain

Programme Manager

Concessionaire’s Engineer(CE)

Independent Safety and RAM Assessor

Lenders Insurance Consultant-Marsh India Pvt. Ltd.

Operation & Maintenance Contractor

The

Team

Concessionaire : L&TMRHL

Authority : Hyderabad Metro Rail Limited (GoTS)

Source: Hyderabad Metro Rail (HMR)Slide50

Financial issues

Repayment Loan – 15 years; including 6 years

of moratoriumBreak even point – 5th year from the date of

CODComposition

of revenue – Fare box

revenue - 50%Non fare box revenue- 45%

Advertisement- 5%

Land Details

-

Total

269 Acres

Pvt.

204 Acres

Govt

65 Acres

Handed over

269 Acres

Source: Hyderabad Metro Rail (HMR)Slide51

Row of piers

Source: Hyderabad Metro Rail (HMR)Slide52

Erection of Segments

Source: Hyderabad Metro Rail (HMR)Slide53

Laying

OHE

masts & traction lines on viaduct Source: Hyderabad Metro Rail (HMR)Slide54

Signalling & Communication system

Source: Hyderabad Metro Rail (HMR)Slide55

Completed view of viaduct at Metro station

Source: Hyderabad Metro Rail (HMR)Slide56

Station Design

Roof

Platform Level

Concourse Level

Street Level

Source: Hyderabad Metro Rail (HMR)Slide57

Miyapur

Depot - Completed Workshop as on 22.04.2015

Source: Hyderabad Metro Rail (HMR)Slide58

HMR's elevated viaduct – With two trains

Source: Hyderabad Metro Rail (HMR)Slide59

HMR station – Completed view

Source: Hyderabad Metro Rail (HMR)Slide60

HMR Uppal depot - Command Control Center

Source: Hyderabad Metro Rail (HMR)Slide61

HMR station - Street furniture & facilities

Source: Hyderabad Metro Rail (HMR)Slide62

HMR station - Landscaping & plantations

Source: Hyderabad Metro Rail (HMR)Slide63

HMR's Metro train-On trial run at night

Source: Hyderabad Metro Rail (HMR)Slide64

Innovative procurement in Urban Transit Kochi Metro

Automatic Fare Collection system costs approx $ 80 million (Rs 500 crore)

Innovative procurment by Kochi Metro Rail Ltd (KMRL) through private investment Axis Bank to procure, install, operate and maintain the AFC system for KMRL for 10 years and would also pay premium of $ 32 million (Rs 208 crore) over 10 years. Business model of Axis Bank - issue co-branded pre-paid smart cards to users of Kochi Metro for paying fares as well as using them for all kinds of merchandise including e-commerce. Axis Bank would also share with KMRL a portion of the revenue accruing from the utilisation of co-branded cards outside KMRL system. More such potential revenue generating opportunities with targeted advertising in MRTS Slide65

Thank You

Related Contents

Next Show more