Emilio García Neri 18 November 2015 Nuclear Fuel Cycle Royal Commission 3 NUCLEAR AND RADIOACTIVE INSTALLATIONS IN SPAIN RWM in Spain GRWP General Radioactive Waste Plan REGULATION AND LICENSING ID: 807276

cabril disposal lilw facility disposal cabril facility lilw safety ministry nuclear environment national energy control council layer waste long

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "2 El Cabril near surface disposal faci..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Slide2

2

El Cabril near surface disposal facility

Emilio García Neri18 November 2015

Nuclear Fuel Cycle Royal Commission

Slide3

3

NUCLEAR AND RADIOACTIVE INSTALLATIONS IN SPAIN

RWM in

Spain

Slide4

GRWP: General Radioactive Waste Plan

REGULATION

AND

LICENSING

PARLIAMENT

GOVERNMENT

ENRESA

NUCLEAR

SAFETY

COUNCIL

MINISTRY OF

INDUSTRY, TOURISM

AND TRADE

MINISTRY OF

THE

ENVIRONMENT

MINISTRY OF

FINANCE

MINISTRY OF

ECONOMY

GENERAL

SECERETARY OF

ENERGY

NATIONAL

INDUSTRIAL

HOLDING

(SEPI)

NATIONAL RESEARCH

CENTRE FOR ENERGY,

ENVIRONMENT AND

TECHNOLOGY

(CIEMAT)

WASTE

PRODUCERS

CONTROL

20%

80%

REGULATION

AND

LICENSING

PARLIAMENT

GOVERNMENT

NUCLEAR

SAFETY

COUNCIL

MINISTRY OF

INDUSTRY, TOURISM

AND TRADE

MINISTRY OF

THE

ENVIRONMENT

GENERAL

SECERETARY OF

ENERGY

CONTROL

REGULATION

AND

LICENSING

PARLIAMENT

GOVERNMENT

NUCLEAR

SAFETY

COUNCIL

MINISTRY OF

INDUSTRY, ENERGY

AND

TOURISM

MINISTRY OF THE

AGRICULTURE,

FOOD AND

ENVIRONMENT

GENERAL

SECERETARY OF

ENERGY

CONTROL

NATIONAL

INDUSTRIAL

HOLDING

(SEPI)

NATIONAL RESEARCH

CENTRE FOR ENERGY,

ENVIRONMENT AND

TECHNOLOGY

(CIEMAT)

20%

80%

POLICY

(GRWP)

Drawing up and implementation

GRWP

INSTITUTIONAL FRAMEWORK

RWM in Spain

Slide5

5

EL CABRIL:

BACKGROUND

Slide6

DESIGN APPROACHES FOR LILW DISPOSAL FACILITIES

6

L´Aube

, France

SFR,

Sweden

Konrad,

Germany

Drigg

,

United

Kingdom

Rokkasho

Mura, JapanInternational experience

Slide7

EL CABRIL LILW DISPOSAL FACILITY: LAY OUT

7

Slide8

8

LONG TERM CAPPING

Slide9

LILW treatment, conditioning, characterization and disposal operations began in October 1992 in this nuclear installation.

The facility has been designed and constructed to guarantee the absence of any significant impact on human beings and the environment. It is made up basically of a conditioning building, quality verification laboratories, other auxiliary installations and disposal structures, consisting of aligned cells.The operations of a complementary installation at El Cabril

started up in October 2008. It is used for the disposal of very low level wastes (VLLW), such as most of those generated during the dismantling of nuclear power plants and special interventions involving the clean-up of land or contaminated facilities.

El

Cabril

centre

, as key piece of the National system, offers the robustness and operability needed to assure its safety and efficiency, as well as enough flexibility for its optimization (processes improvement, R&D programme on engineered barriers, …)

EL CABRIL: RELEVANT ASPECTS OF MANAGEMENT

Slide10

Waste Acceptance Criteria:

ENRESA has established WAC related to the safety case for operational and post-closure phases. It also set up characterization, Acceptance and verification procedures

Waste Tracking System

Periodic Safety Review:

El

C

abril

safety case has been periodically updated using the knowledge gained throughout the different phases of the Project

According to CSN standards, nuclear facilities are submitted to a safety review every ten years period.

2 PSR covering the periods 1992-2001 and 2002-2011, have been carried out covering

:

Operating experienceExperience on the aspects related to radiation protectionExperience from the application of the WAC methodology

Experience in the study of parameters affecting the long-term safetyExperience in long-term safety assessmentRegulatory changesEL CABRIL: EVOLUTION IN THE IMPLEMENTATION OF REGULATORY REQUIREMENTS

Slide11

CONTAINER

VAULTS WITH

PROVISIONAL COVERING

MOBILE ROOF

INSPECTION GALLERY

PROTECTING

LAYER

LONG-TERM COVERAGE

TOPSOIL

COARSE GRAVEL

WEATHERPROOF LAYER

OF COMPACTED CLAY

SYNTHETIC WEATHERPROOFING

MEMBRANE

REFILL

(DRAINAGE)

1st LAYER SAND

(DRAINAGE)

2nd LAYER SAND

(DRAINAGE)

3rd LAYER SAND

11

EL CABRIL LILW DISPOSAL FACILITY:

CONCEPT DESIGN

Slide12

MIR RW management

Incineration

Compaction

Packages handling

Disposal Units preparation

12

EL CABRIL LILW DISPOSAL FACILITY: TECHNICAL CAPACITIES

Slide13

Supervision of all systems and processes of the facility

Remote handling of equipment both in Conditioning Building and LILW Disposal vaultsRW package Tracking system

13

EL CABRIL LILW DISPOSAL FACILITY: CONTROL ROOM

Slide14

LILW DISPOSAL FACILITY :

INCINERATOR

14

EL CABRIL LILW DISPOSAL FACILITY: INCINERATOR

Slide15

15

EL CABRIL LILW DISPOSAL FACILITY: COMPRESSOR

Slide16

LILW DISPOSAL FACILITY :

ACTIVE VERIFICATION LAB

16

EL CABRIL LILW DISPOSAL FACILITY:

ACTIVE LABORATORY

Slide17

17

Llenado de un contenedor con bultosInterior celda de almacenamiento

EL CABRIL LILW DISPOSAL FACILITY:

HANDLING AND DISPOSAL

Slide18

EL CABRIL LILW DISPOSAL FACILITY: SEEPAGE CONTROL NETWORK

Slide19

ECONOMICS OF EL CABRIL / INVESTMENTS

19Technical and non-technical factors affect repository cost

M€ / 2014

Property

7.5

Engineering

35

Equipment

40.5

Civil

works

83

Assembling and test

16

Decommissioning and environmental restoration10Institutional control - surveillance

40Total230

Slide20

ECONOMICS OF EL CABRIL / OPERATIONAL COST

20By reason of their activities at El Cabril, ENRESA Operational cost is for 18-25 M€ per year including:

National taxes: VAT 8%Regional Government: Operating taxes

Hosting Town Council: Local Activities tax, permits (i.e. Building permit)

Legal instrument for assignments to Town Council located in the neighborhood of RW storage/disposal facilities:

Infrastructure improvements through Cooperative Agreements with competent institutions

Additionally, “Good neighbor policy”

Industrial facility, including RWM processes

Staff (~ 180 people): local recruitmentServices: local supply i.e. building, staff transport, security…Supporting programmes in the fields of social action, healthcare, culture and environment