Welcome at Presentation at Public Hearing For EC - slide 1 of 133 Welcome at Presentation at Public Hearing For EC - slide 2 of 133 Welcome at Presentation at Public Hearing For EC - slide 3 of 133 Welcome at Presentation at Public Hearing For EC - slide 4 of 133 Welcome at Presentation at Public Hearing For EC - slide 5 of 133 Welcome at Presentation at Public Hearing For EC - slide 6 of 133 Welcome at Presentation at Public Hearing For EC - slide 7 of 133 Welcome at Presentation at Public Hearing For EC - slide 8 of 133 Welcome at Presentation at Public Hearing For EC - slide 9 of 133 Welcome at Presentation at Public Hearing For EC - slide 10 of 133 Welcome at Presentation at Public Hearing For EC - slide 11 of 133 Welcome at Presentation at Public Hearing For EC - slide 12 of 133 Welcome at Presentation at Public Hearing For EC - slide 13 of 133 Welcome at Presentation at Public Hearing For EC - slide 14 of 133 Welcome at Presentation at Public Hearing For EC - slide 15 of 133 Welcome at Presentation at Public Hearing For EC - slide 16 of 133 Welcome at Presentation at Public Hearing For EC - slide 17 of 133 Welcome at Presentation at Public Hearing For EC - slide 18 of 133 Welcome at Presentation at Public Hearing For EC - slide 19 of 133 Welcome at Presentation at Public Hearing For EC - slide 20 of 133 Welcome at Presentation at Public Hearing For EC - slide 21 of 133 Welcome at Presentation at Public Hearing For EC - slide 22 of 133 Welcome at Presentation at Public Hearing For EC - slide 23 of 133 Welcome at Presentation at Public Hearing For EC - slide 24 of 133 Welcome at Presentation at Public Hearing For EC - slide 25 of 133 Welcome at Presentation at Public Hearing For EC - slide 26 of 133 Welcome at Presentation at Public Hearing For EC - slide 27 of 133 Welcome at Presentation at Public Hearing For EC - slide 28 of 133 Welcome at Presentation at Public Hearing For EC - slide 29 of 133 Welcome at Presentation at Public Hearing For EC - slide 30 of 133 Welcome at Presentation at Public Hearing For EC - slide 31 of 133 Welcome at Presentation at Public Hearing For EC - slide 32 of 133 Welcome at Presentation at Public Hearing For EC - slide 33 of 133 Welcome at Presentation at Public Hearing For EC - slide 34 of 133 Welcome at Presentation at Public Hearing For EC - slide 35 of 133 Welcome at Presentation at Public Hearing For EC - slide 36 of 133 Welcome at Presentation at Public Hearing For EC - slide 37 of 133 Welcome at Presentation at Public Hearing For EC - slide 38 of 133 Welcome at Presentation at Public Hearing For EC - slide 39 of 133 Welcome at Presentation at Public Hearing For EC - slide 40 of 133 Welcome at Presentation at Public Hearing For EC - slide 41 of 133 Welcome at Presentation at Public Hearing For EC - slide 42 of 133 Welcome at Presentation at Public Hearing For EC - slide 43 of 133 Welcome at Presentation at Public Hearing For EC - slide 44 of 133 Welcome at Presentation at Public Hearing For EC - slide 45 of 133 Welcome at Presentation at Public Hearing For EC - slide 46 of 133 Welcome at Presentation at Public Hearing For EC - slide 47 of 133 Welcome at Presentation at Public Hearing For EC - slide 48 of 133 Welcome at Presentation at Public Hearing For EC - slide 49 of 133 Welcome at Presentation at Public Hearing For EC - slide 50 of 133 Welcome at Presentation at Public Hearing For EC - slide 51 of 133 Welcome at Presentation at Public Hearing For EC - slide 52 of 133 Welcome at Presentation at Public Hearing For EC - slide 53 of 133 Welcome at Presentation at Public Hearing For EC - slide 54 of 133 Welcome at Presentation at Public Hearing For EC - slide 55 of 133 Welcome at Presentation at Public Hearing For EC - slide 56 of 133 Welcome at Presentation at Public Hearing For EC - slide 57 of 133 Welcome at Presentation at Public Hearing For EC - slide 58 of 133 Welcome at Presentation at Public Hearing For EC - slide 59 of 133 Welcome at Presentation at Public Hearing For EC - slide 60 of 133 Welcome at Presentation at Public Hearing For EC - slide 61 of 133 Welcome at Presentation at Public Hearing For EC - slide 62 of 133 Welcome at Presentation at Public Hearing For EC - slide 63 of 133 Welcome at Presentation at Public Hearing For EC - slide 64 of 133 Welcome at Presentation at Public Hearing For EC - slide 65 of 133 Welcome at Presentation at Public Hearing For EC - slide 66 of 133 Welcome at Presentation at Public Hearing For EC - slide 67 of 133 Welcome at Presentation at Public Hearing For EC - slide 68 of 133 Welcome at Presentation at Public Hearing For EC - slide 69 of 133 Welcome at Presentation at Public Hearing For EC - slide 70 of 133 Welcome at Presentation at Public Hearing For EC - slide 71 of 133 Welcome at Presentation at Public Hearing For EC - slide 72 of 133 Welcome at Presentation at Public Hearing For EC - slide 73 of 133 Welcome at Presentation at Public Hearing For EC - slide 74 of 133 Welcome at Presentation at Public Hearing For EC - slide 75 of 133 Welcome at Presentation at Public Hearing For EC - slide 76 of 133 Welcome at Presentation at Public Hearing For EC - slide 77 of 133 Welcome at Presentation at Public Hearing For EC - slide 78 of 133 Welcome at Presentation at Public Hearing For EC - slide 79 of 133 Welcome at Presentation at Public Hearing For EC - slide 80 of 133 Welcome at Presentation at Public Hearing For EC - slide 81 of 133 Welcome at Presentation at Public Hearing For EC - slide 82 of 133 Welcome at Presentation at Public Hearing For EC - slide 83 of 133 Welcome at Presentation at Public Hearing For EC - slide 84 of 133 Welcome at Presentation at Public Hearing For EC - slide 85 of 133 Welcome at Presentation at Public Hearing For EC - slide 86 of 133 Welcome at Presentation at Public Hearing For EC - slide 87 of 133 Welcome at Presentation at Public Hearing For EC - slide 88 of 133 Welcome at Presentation at Public Hearing For EC - slide 89 of 133 Welcome at Presentation at Public Hearing For EC - slide 90 of 133 Welcome at Presentation at Public Hearing For EC - slide 91 of 133 Welcome at Presentation at Public Hearing For EC - slide 92 of 133 Welcome at Presentation at Public Hearing For EC - slide 93 of 133 Welcome at Presentation at Public Hearing For EC - slide 94 of 133 Welcome at Presentation at Public Hearing For EC - slide 95 of 133 Welcome at Presentation at Public Hearing For EC - slide 96 of 133 Welcome at Presentation at Public Hearing For EC - slide 97 of 133 Welcome at Presentation at Public Hearing For EC - slide 98 of 133 Welcome at Presentation at Public Hearing For EC - slide 99 of 133 Welcome at Presentation at Public Hearing For EC - slide 100 of 133 Welcome at Presentation at Public Hearing For EC - slide 101 of 133 Welcome at Presentation at Public Hearing For EC - slide 102 of 133 Welcome at Presentation at Public Hearing For EC - slide 103 of 133 Welcome at Presentation at Public Hearing For EC - slide 104 of 133 Welcome at Presentation at Public Hearing For EC - slide 105 of 133 Welcome at Presentation at Public Hearing For EC - slide 106 of 133 Welcome at Presentation at Public Hearing For EC - slide 107 of 133 Welcome at Presentation at Public Hearing For EC - slide 108 of 133 Welcome at Presentation at Public Hearing For EC - slide 109 of 133 Welcome at Presentation at Public Hearing For EC - slide 110 of 133 Welcome at Presentation at Public Hearing For EC - slide 111 of 133 Welcome at Presentation at Public Hearing For EC - slide 112 of 133 Welcome at Presentation at Public Hearing For EC - slide 113 of 133 Welcome at Presentation at Public Hearing For EC - slide 114 of 133 Welcome at Presentation at Public Hearing For EC - slide 115 of 133 Welcome at Presentation at Public Hearing For EC - slide 116 of 133 Welcome at Presentation at Public Hearing For EC - slide 117 of 133 Welcome at Presentation at Public Hearing For EC - slide 118 of 133 Welcome at Presentation at Public Hearing For EC - slide 119 of 133 Welcome at Presentation at Public Hearing For EC - slide 120 of 133 Welcome at Presentation at Public Hearing For EC - slide 121 of 133 Welcome at Presentation at Public Hearing For EC - slide 122 of 133 Welcome at Presentation at Public Hearing For EC - slide 123 of 133 Welcome at Presentation at Public Hearing For EC - slide 124 of 133 Welcome at Presentation at Public Hearing For EC - slide 125 of 133 Welcome at Presentation at Public Hearing For EC - slide 126 of 133 Welcome at Presentation at Public Hearing For EC - slide 127 of 133 Welcome at Presentation at Public Hearing For EC - slide 128 of 133 Welcome at Presentation at Public Hearing For EC - slide 129 of 133 Welcome at Presentation at Public Hearing For EC - slide 130 of 133 Welcome at Presentation at Public Hearing For EC - slide 131 of 133 Welcome at Presentation at Public Hearing For EC - slide 132 of 133 Welcome at Presentation at Public Hearing For EC - slide 133 of 133
Description: Welcome at Presentation at Public Hearing For EC (EIA Project) Of IRON ORE CRUSHING SCREENING PLANT CAPACITY- 1.2 MTPA BENEFICIATION PLANT - CAPACITY- 0.48MTPA COAL BASED DRI PLANT - CAPACITY- 2X95 Tonsday WASTE HEAT RECOVERY

Related Topics

Download Presentation

"Welcome at Presentation at Public Hearing For EC" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

slide1. Welcome
at
Presentation at Public Hearing For EC
(EIA Project)
Of
“ IRON ORE CRUSHING & SCREENING PLANT – [CAPACITY- 1.2 MTPA]
BENEFICIATION PLANT - [CAPACITY- 0.48MTPA]
COAL BASED DRI PLANT - [CAPACITY- 2X95 Tons/day] &
WASTE HEAT RECOVERY BASED POWER PLANT - [CAPACITY- 5MW]”
at
(Extent:212.97 Acres, Sy No. 40,41,42,43,44,45,47,53 and 54, KIADB land )
Ranjitpura Village, Sandur Taluk, Ballari District, Karnataka

Of
M/s. RANJITPURA INFRASTRUCTURE PRIVATE LTD.,
Ranjitpura Village, Sandur Taluk, Ballari District, Karnataka

Presented by
Certificate No : NABET/EIA/1821/SA 100

GLOBAL Environment & Mining Services
HOSPET – 583201, Vijayanagara Dist. (Karnataka) Certificate No. : T-5323 1<br>
slide2. 2 Panoramic view of project site<br>
slide3. INTRODUCTION & LOCATION 3<br>
slide4. Toposheet No. 57 A/12.
Latitude & Longitude - 15001’35.56” to 15002’40.21” & 76036’19.44” to 76036’52.00”
Status - The ToR for this project is granted by SEIAA – Karnataka on 18th June, 2020.
The area around the Plant site is agricultural and forest lands,
Ranjitpura village is located at 0.35km North
EIA/EMP studies are carried out with in 10km radius for the period Oct to Dec 2020.
For this project the Post and Telegraph, Bank, Hospital, Education, transportation facilities & Market is available at Sandur.
No Sanctuaries, National Parks are located within 10 km radius from the Plant area.
Kumarswamy Temple (listed under of ASI) is located with in 5.47km SW from the Plant area.
The Iron ore Leases of M/s. NMDC, M/s. JSW, M/s. SMIORE & few other are located within the study area.
Project cost Rs.208 crores. INTRODUCTION & LOCATION 4<br>
slide5. LOCATION MAP 5<br>
slide6. 6 KEY PLAN 6<br>
slide7. 7 GOOGLE PLAN 7<br>
slide8. SURFACE PLAN AND TOPOGRAPHY 8 The general topographic elevation varies from 620 to 707 m. above MSL.

From the central part of plant area there is gentle slope towards northeast & southwest.<br>
slide9. Land use at the end of plan period & at conceptual stage 10 Out of 103.3 acre area proposed for plant include 40.50 acre area earmarked for greenbelt and afforestation.<br>
slide10. 10 RAW MATERIAL REQUIREMENT The yearwise raw material requirement is given in the table shown below:<br>
slide11. 11 CRUSHING & SCREENING PLANT There will be 2 lines of crushing & screening plant of each 0.6MTPA capacity.
This plant consist of primary crushers, secondary crushers, triple deck screens, conveyors, hoppers, discharge bin etc., Source: google<br>
slide12. 12 IRON ORE BENEFICIATION PLANT The iron ore beneficiation plant will have 0.48MTPA capacity
The low grade iron (Fe 52-55%) will be upgraded to 58-62% Fe.
It is totally wet technology for which 400m3 water is required per day.
89% of the water in circuit will be recovered and recycled.
This plant consist of scrubbers, cyclones, classifiers, screens, conveyors, hoppers, discharge bin etc.,
The sized product from this plant will be feed to DRI plant. Source: CDE washing plant<br>
slide13. 13 COAL BASED DIRECT REDUCTION OF IRON (DRI) PLANT It is also called sponge iron plant.
There will be two rotary kiln of coal based DRI plant, each of 95 tons/day capacity.
In this plant the sponge iron (metallic product) is produced through direct deduction of iron ore in the solid stage.
The feed to this plant will be iron ore (9mm to 16mm), coal and limestone
The generated waste (dolochar) will be sold to the power plant, the generated gases will be used for power generation and ash will be utilized for bricks making.<br>
slide14. 14 WASTE HEAT RECOVERY BASED POWER PLANT The generated waste gases in DRI plant will be recirculated and used for power generation.
The capacity of WHRB power plant will be 5MW.
This plant consist of boilers, turbine, cooling tower etc.,
The power from this plant will be utilized power C&S, beneficiation plant, DRI plant and all other activities.
The surplus power will be supplied to govt. power grid. Source: CDE washing plant<br>
slide15. 15 SOLID WASTE MANAGEMENT The common anticipated solid wastes are iron rich tailings from beneficiation plant, dolochar from rotary kilns, ash from bag filters and ESP’s used oil and domestic waste. The details of waste generation and mode of disposal is given in the table shown below:<br>
slide16. WATER REQUIREMENT Ground water is the major source of water.
Around 400 KLD of water is required for Beneficiation Plant.
Around 216 KLD of water is required for sponge iron Plant.
Around 216 KLD of water is required for power Plant.
About 24 KLD is required for dust suppression, domestic and afforestation, which shall be drawn from nearby bore wells.
Permission from concern Department to extract the water is under progress. 11<br>
slide17. BASELINE INFORMATION OF STUDY AREA (DURING STUDY PERIOD OCTOBER-2020 TO DECEMBER-2020 12 Maximum & Minimum Temperatures :
The perusal of mean monthly temperature data shows that lowest & highest temperature of 15.0ºC and 35.0ºC.
Source : www.ksndmc.org/weather_info.aspx & Accuweather Maximum & Minimum Relative Humidity:
The humidity data collected during the study period is shows that the highest humidity 98% and lowest humidity is 32% in Nov-2020.<br>
slide18. BASELINE INFORMATION OF STUDY AREA (DURING STUDY PERIOD OCT- 2020 TO DEC-2020 13 Rainfall:
The Maximum is 161mm rainfall in the month of Oct-2020 and minimum rainfall of 9mm is observed in the month of Dec-2020. Wind rose Diagram of October - 2020 to December - 2020<br>
slide19. 19 LOCATION OF AIR QUALITY, WATER, NOISE & SOIL SAMPLES Oct-2020 to Dec-2020<br>
slide20. AMBIENT AIR QUALITY ANALYSIS
(Oct-2020 to Dec-2020) 15<br>
slide21. ANALYSIS OF WATER SAMPLES (Oct-2020 to Dec-2020) 15 Ground Water Analysis<br>
slide22. ANALYSIS OF WATER SAMPLES (Oct-2020 to Dec-2020) 15 Summary of Surface Water Analysis<br>
slide23. SOIL ANALYSIS REPORT (Oct-2020 to Dec-2020) 15 Chemical Properties of Soil<br>
slide24. NOISE LEVELS Oct-2020 to Dec-2020 23 Description of Noise Monitoring Stations<br>
slide25. The impact on surrounding due to plant operation, transportation and handling is assessed and the mitigative measures to reduce the impact are proposed.
Change in AIR QUALITY
The air quality deterote due to plant operation, handling and transportation of Ore as well as material.
CONTROL MEASURES :
Apart from road transport, the transportation of coal and other material will be preferably done by railway. All the roads will be asphalted.
All raw material handling areas will be connected with de-dusting system. The de-dusting units will be connected to stack having height of 30m.
Water sprinkling and dry fog type dust suppression system will be provided to control the dust from raw material yard and on roads.
The waste gas generated in DRI process will be re-circulated generate electricity through WHRB power plant.
Crushing and screening operations will be carried out in a closed area. All conveyers will be covered with G.I. sheets and bins will be totally packed and covered. 24 ENVIRONMENTAL IMPACT & ENVIRONMENT MANAGEMENT PLAN<br>
slide26. The greenbelt will be developed around the plant to stop the carryover of dust.
Regular cleaning and maintenance of the air pollution control system will be carried out.
The height of the chimneys will be increased based on requirement.
Compound wall of 10 feet height will be constructed and wind barricates will be erected.
The vehicle carrying coal and iron ore will be closed or covered with tarpaulin.
Coal will be stored in a closed shed. While unloading dropping of the of coal/iron ore from height will be avoided.
Dust masks shall be provided to all workers.
The over filling of tippers and consequent spillage on the roads will be avoided.
To avoid the fugitive emissions from gas cutting activities, plasma cutters will be used instead of gas cutting systems.
Air quality shall be regularly monitored both in the core zone and the buffer zone. ENVIRONMENTAL IMPACT & ENVIRONMENT MANAGEMENT PLAN 25<br>
slide27. ENVIRONMENTAL IMPACT & ENVIRONMENT MANAGEMENT PLAN
(Prediction For PM-10) 26<br>
slide28. ENVIRONMENTAL IMPACT & ENVIRONMENT MANAGEMENT PLAN
(Prediction For PM-2.5) 27<br>
slide29. PREDICTED & RESULTANT CONCENTRATION OF PM-10 & PM-2.5 28<br>
slide30. SCHEDULE OF AFFORESTATION The following table shows the year wise development of the afforestation in greenbelt as well as other proposed plantation area. 29 Schedule of afforestation at plant area<br>
slide31. 31 Impact of noise during construction phase
Increase in vehicular movements, material transport, loading and unloading activities, mechanical operations (hammering, digging, drilling, and fitting etc.,) movements of labouers etc., may increase noise levels.
CONTROL MEASURES NOISE LEVELS
Selection of low noise generation machinery / equipment.
Provision of rubber padding / noise isolators / silencers to modulate the noise generated by machinery/equipment, wherever possible.
All vehicles will be arranged silencers to minimize noise.
The high noise zones at site will be demarcated and provided with enclosures and barriers. Preventive maintenance of machinery equipment and vehicles.
All the vehicles will be regularly serviced and their speed will be maintained <25 kmph. They should avoid congestion during rush hours. Unnecessary idling will be avoided. All vehicles should only use filters to their exhaust before entering into the premises.
Board will be displayed to avoid unnecessary horning. ENVIRONMENT MANAGEMENT PLAN<br>
slide32. 32 Impact of noise during operation phase
The main noise generating sources in the proposed plant are crushing and screening, boilers, rotary kilns, turbine, cooling tower, material handling systems, process machineries etc. DG sets will be used during emergency only. The equipment shall be designed to comply with the stipulated limit of 85dB (A).
CONTROL MEASURES NOISE LEVELS
All rotating items will be well lubricated and provided with enclosures as far as possible to reduce noise transmission.
Vibration isolators will be provided to reduce vibration and noise wherever possible.
In general, noise generating items such as fans, blowers, compressors, pumps, motors etc. will be so specified as to limit their speeds to generate minimum noise levels.. All the blower house buildings will be made sound proof.
The areas where high noise levels persist continuously for a significant period of time shall be earmarked as High Noise Zone areas and accordingly it shall be displayed at appropriate places for warning employees. However necessary care shall be taken through Integrated Maintenance Management system to minimize the noise at these areas.
Provision of silencers will be made wherever possible. The insulation provided for prevention of loss of heat and personnel safety will also act as noise reducers.
Layouts of equipment’s foundations and structures will be designed considering the requirement of noise abatement. ENVIRONMENT MANAGEMENT PLAN<br>
slide33. 33 CONTROL MEASURES NOISE LEVELS
Central control room(s) provided for operation and supervision of plant & equipment will be air-conditioned, insulated and free from plant noise. Necessary enclosures will also be provided on the working platforms/areas to provide local protection in high noise level areas.
Engineering specifications shall be stipulated during tendering as a condition for each machinery/equipment to maintain noise level equal to or less than 85 dB(A) at 1 m distance.
Proper housekeeping to avoid excessive noise generation.
In case, where the operation of the equipment warrants the presence of operators in close proximity to equipment, the operators will be provided with necessary safety and protection equipment such as ear plugs, ear muffs etc.
Decreasing noise levels by development of green belt in and around the plant premises.
Noise levels at various areas shall be regularly monitored inside and outside the Plant area.
Silencers shall be used for transport vehicles and other machines of noise sources. Avoid use of horns except emergencies. ENVIRONMENT MANAGEMENT PLAN<br>
slide34. 35 Change in water quality
Impact on water during construction phase
During the construction phase, water will be required for civil works and for the domestic activities. Water requirement is needed mainly for preparation and mixing of concrete; cooling of construction equipment, dust suppression etc.
CONTROL MEASURES
Water is required for constructional activities. However, the construction phase is very limited time and need only 25 KLD. The number of labors needed during construction phase is very limited (approximately 40 no’s). The water needed for their drinking and sanitary facilities is estimated to be around 2 KLD only
Adequate arrangements will be made to ensure proper drainage of wastewater from the construction sites, so that such waters do not form stagnant pools nor aggravate soil erosion.
The waste water during construction will contain only suspended impurities. This water would be passed through settlement ponds and recycled for use in gardening and other non-consumption activities.
Proper and effective Environmental Management Planning will be implemented to minimize the water usage. ENVIRONMENT MANAGEMENT PLAN<br>
slide35. 36 Change in water quality
Impact on water during operation phase
The Water is a natural resource and usage of water is a negative impact on environment. The estimated wastewater from the proposed plant activities such as beneficiation of ore, cooling tower, boiler blow down, softener back wash and domestic purpose will be 856KLD.
CONTROL MEASURES
As a part of conservation or minimization of water usage Air cooled condensers will be provided.
The wastewater generated will be treated to meet on land disposal for green belt development.
Run-off water from the raw material storage yard will be routed through garland drains to catch pits to settle out suspended solids. The clear water will be discharged to natural drains.
No hazardous chemicals shall be used in thickener of beneficiation plant.
Rainwater harvesting pits will be constructed to recharge ground water. The water harvested from rain harvesting pits will be utilized for green belt development and dust suppression. ENVIRONMENT MANAGEMENT PLAN<br>
slide36. 37 Change in soil quality
Impact on soil during construction phase
During construction phase, there will be more vehicular movements and cause soil erosion, dust and gaseous pollution. The open surface area will be reduced due to built up.
CONTROL MEASURES
The materials brought for construction will be stored covered with plastic/tarpaulin sheets and all the discarded materials will be disposed of regularly and shall keep the place neatly.
Care should be taken during construction phase dust will not spread into nearby agriculture lands by covering with tarpaulins.
Water spraying shall be carried out on the roads inside the plant where vehicles carrying materials.
The surface enriched soil removed during foundation should be dumped separately and shall be used in filling the low lying areas and development of green belt.
Also care should be taken spillage of cement, paints, oils by covering the respective places with plastic covers.
Washings should be carried out in the identified areas where surface is cemented and directed into proper channels. ENVIRONMENT MANAGEMENT PLAN<br>
slide37. 38 Change in soil quality
Impact on soil during operation phase
Vehicular movements can cause soil erosion and also cause wind prone particles pollution.
Soil erosion may be caused due to run off from the plant that leads to removal of soil’s organic matter and fine soil particles and finally destroys productivity of land.
CONTROL MEASURES SOIL LEVELS
Dust emissions sources due to vehicular movement will be sprayed by water.
Increase in stack height with high efficiency control system will reduce the concentration of particulates in ambient air. Care shall be taken that dust will not spread to nearby agricultural fields.
Parking areas shall be identified. Unnecessary idling of vehicular movements shall be restricted. Vehicle speed shall be restricted to < 15 kmph.
Other than green belt, all the empty places will be developed with grasses, herbs and shrubs to bind soil particles during dry seasons.
Materials handling, storage and transportation will be done carefully and designated impervious storage area for raw materials, fuels etc. will be provided.
Soil testing results will help to identify the deficient nutrients. Proper soil amendments will help to develop green belt which increases soil moisture and organic matter. ENVIRONMENT MANAGEMENT PLAN<br>
slide38. 39 ENVIRONMENT MANAGEMENT PLAN TAILING MANAGEMENT Around 30% of the feed is expected to be generated as tailings
The tailing will be stored as cake and these are directly salable to the cement industry.
The Silpaulin Plastic Film shall be placed in the tailing pond to avoid percolation to ground water.
Provision is made to stock tailing cakes in the plant area. Before stacking the tailing cakes, Silpaulin Plastic Film shall be spread in the earmarked area to avoid percolation.
A retaining wall shall be constructed all around the foot of the tailing dump. 38<br>
slide39. SOCIO ECONOMIC IMPACT OF PROJECT 40 Impact on socio-economic environment during construction phase
There is a possibility from the proposed plant activities will cause damage to the agricultural land, health to nearby residents, water scarcity and economy.
Positive impact :-
The proponents are going to use more recent available technology (like recirculation of waste gases and total utilization of solid waste) to reduce the emissions.
The proposed unit will provide 239 no. of employment opportunities and the preference will be given to local people. Skill training will be given to local people, to generate more employment opportunities to the locals.
0.5 % of the capital cost (Rs.104 laks) is earmarked for CER activities and action plan.
The expressed views during public hearing will be taken in to consideration while investing money.
Compensation will be given to the nearby farmers having agricultural land in the surroundings if any production loss due to industrial activities.
The medical facilities for the surrounding villages will be provided by conducting health camp.<br>
slide40. SOCIO ECONOMIC IMPACT OF PROJECT 40 Impact on socio-economic environment during operation phase
There is a possibility from the proposed plant activities will cause damage to the agricultural land, health to nearby residents, water scarcity and economy.

Positive Impact :-
The schools maintenance shall be done and the students will be supported by providing books periodicals and scholarships.
The school / college going students will be provided regular transport facilities.
The water will be provided to Ranjitpura village.
Hygiene/Employment Oriented Training will be conducted for localities and youngsters.
Support and training (computer and stiching) will be given to 25 girls from Ranjitpura village and school.<br>
slide41. 42 To develop the socio-economic conditions of local people the industry will invest Rs.104 Cr under CSR activities.
During construction sanitation, drinking water, fuel, restroom etc. facilities will be provided to the constructional laborers as well as to the casual workers.
Constructional activities will be carried out during day time only, so that there will not be any disturbance to nearby habitants during night time.
The project area is well connected with road networks and hence issue of traffic and transport infrastructure is not envisaged.
However, the impacts are insignificant and temporary. SOCIO ECONOMIC IMPACT OF PROJECT<br>
slide42. PROPOSED CSR ACTIVITIES 43 Corporate Environment Responsibility (CER) proposed at Ranjitpura village :-
It proposes to taken up the following CER activities listed below:
Providing solar street lights in school and gram Panchayat
Maintenance of Anganavadi and Govt schools
Cleanliness, maintaining hygiene & half yearly health camp
Agricultural Improvement :-
Help in arranging in association with nearby agricultural department for soil testing and technical inputs for increasing yield.
Employment & Communication :-
Localities will be preferred training & suitable employment on priority basis.<br>
slide43. OCCUPATIONAL HEALTH & SAFETY MEASURE TO
CONTROL DUST INHALATION Dust masks would be provided.

Safety shoes, Helmets & Hand Gloves Shall be provided.

Identification of health hazards, training on malaria eradication and precautionary measures like use of personal equipments etc.,

Regular health monitoring of workers will be carried out. 44 OUR COMMITMENTS….. Appointment of Doctor for regular medical checkup to the near by villages.
Toilets for Govt. High school with overhead water tank facilities.
Tuition fee & Scholarships to meritorious girl students.
Developing the computer lab for Govt. High school, in Ranjithpura village.
Teaching aids, books & periodicals to school.<br>
slide44. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 44<br>
slide45. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 45<br>
slide46. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 46<br>
slide47. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 47<br>
slide48. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 48<br>
slide49. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 49<br>
slide50. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 50<br>
slide51. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 51<br>
slide52. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 52<br>
slide53. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 53<br>
slide54. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 54<br>
slide55. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 55<br>
slide56. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 56<br>
slide57. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 57<br>
slide58. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 58<br>
slide59. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 59<br>
slide60. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 60<br>
slide61. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 61<br>
slide62. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 62<br>
slide63. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 63<br>
slide64. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 64<br>
slide65. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 65<br>
slide66. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 66<br>
slide67. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 67<br>
slide68. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 68<br>
slide69. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 69<br>
slide70. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 70<br>
slide71. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 71<br>
slide72. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 72<br>
slide73. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 73<br>
slide74. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 74<br>
slide75. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 75<br>
slide76. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 76<br>
slide77. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 77<br>
slide78. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 78<br>
slide79. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 79<br>
slide80. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 80<br>
slide81. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 81<br>
slide82. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 82<br>
slide83. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 83<br>
slide84. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 84<br>
slide85. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 85<br>
slide86. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 86<br>
slide87. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 87<br>
slide88. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 88<br>
slide89. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 89<br>
slide90. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 90<br>
slide91. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 91<br>
slide92. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 92<br>
slide93. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 93<br>
slide94. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 94<br>
slide95. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 95<br>
slide96. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 96<br>
slide97. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 97<br>
slide98. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 98<br>
slide99. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 99<br>
slide100. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 100<br>
slide101. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 101<br>
slide102. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 102<br>
slide103. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 103<br>
slide104. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 104<br>
slide105. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 105<br>
slide106. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 106<br>
slide107. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 107<br>
slide108. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 108<br>
slide109. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 109<br>
slide110. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 110<br>
slide111. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 111<br>
slide112. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 112<br>
slide113. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 113<br>
slide114. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 114<br>
slide115. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 115<br>
slide116. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 116<br>
slide117. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 117<br>
slide118. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 118<br>
slide119. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 119<br>
slide120. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 120<br>
slide121. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 121<br>
slide122. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 122<br>
slide123. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 123<br>
slide124. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 124<br>
slide125. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 125<br>
slide126. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 126<br>
slide127. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 127<br>
slide128. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 128<br>
slide129. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 129<br>
slide130. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 130<br>
slide131. STANDARD TERMS OF REFERENCE (TOR) & PUBLIC HEARING. TERMS OF REFERENCE (TOR) 131<br>
slide132. 47<br>
slide133. Presentation By GLOBAL ENVIRONMENT & MINING SERVICES
(Consulting Engineers, Mine Designers, Geologists & Surveyors)
3rd Cross, Main Road, 16th Ward
Basaveswara Badawane
HOSPET – 583201, Vijayanagara Dist., Karnataka, India
Mob: +91 9448479433, +91 9449830533.
Tel: 08394-229433
e-mail: gems_hpt@yahoo.com
Website : www.globalmining.in C R E D E N T I A L S

An ISO 9001:2015 certified company
The company got RQP certificate from Indian Bureau of Mines
Laboratory recognized by NABL & MoEF&CC.
Company is recognized by Govt. of Maharashtra and Govt. of Goa for DGPS surveys.
Company has accreditation of NABET certificate for preparation EIA/EMP for MOEF and SEAC
Obtained OHSAS 18000 : 2007 certificate
Company recognized by C & I Dept, Govt. of Karnataka for DGPS Survey