"Welcome to the Presentation For Issuance of" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Presentation Transcript
01
Welcome to the PresentationFor Issuance of Environmental Clearance of Pachwara South Coal Mines Projectof M/s Neyveli Uttar Pradesh Power Ltd.(NUPPL) –A joint venture of NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited.[Online Proposal no-(Block Area -714.8553 Hectare)Proposed Capacity-9.00 MTPA (Normative) & 13.50MTPA (Peak Rated) for Coal HON’BLE CHAIRMAN & MEMBERS
OF
EXPERT APPRAISAL COMMITTEE (COAL MINING SECTOR)
MoEF & CC, GOVT. OF INDIA
Agenda No……… Meeting of the Expert Appraisal Committee Centre for Envotech & Management Consultancy Pvt. Ltd.
(QCI Accredited “A” Category Consultant Organization)
Regd Off:Plot no-522/3458, Pahal, Bhubaneswar-752101
Mobile-8763703371, website: www.cemcpl.in
E-mail: cemc_consultancy@yahoo.co.in, cemc122@gmail.com Environmental Consultant : Date : ……… 2022 M/s . Neyveli Uttar Pradesh Power Ltd.(NUPPL)
A joint venture of NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited. PROJECT PROPONENT<br>
OF
EXPERT APPRAISAL COMMITTEE (COAL MINING SECTOR)
MoEF & CC, GOVT. OF INDIA
Agenda No……… Meeting of the Expert Appraisal Committee Centre for Envotech & Management Consultancy Pvt. Ltd.
(QCI Accredited “A” Category Consultant Organization)
Regd Off:Plot no-522/3458, Pahal, Bhubaneswar-752101
Mobile-8763703371, website: www.cemcpl.in
E-mail: cemc_consultancy@yahoo.co.in, cemc122@gmail.com Environmental Consultant : Date : ……… 2022 M/s . Neyveli Uttar Pradesh Power Ltd.(NUPPL)
A joint venture of NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited. PROJECT PROPONENT<br>
02
2 OUR REQUEST Grant of Environmental Clearance for a production capacity of 9.00 Million TPA (normative)/13.50 Million TPA (Peak rated) of coal from Pachwara South Coal Mine Project of M/s Neyveli Uttar Pradesh Power Ltd. (NUPPL), is a joint venture of NLC India Ltd. (Govt. of India Enterprise) and Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd. (Government of Uttar Pradesh).<br>
03
Project Background<br>
04
This block is the southernmost part of the Pachwara Coalfield in Dumka District, Jharkhand. Pachwara-Chirudih Sector lies in the western part of Pachwara basin. The east-central, central and north-western part of the block is characterized by three villages, namely Chirudih, Kundapahari and Mahuldabar respectively. Location and Accessibility KML<br>
05
The drainage pattern of the region is dendritic. In the core zone, which is gently undulating in nature, there is Bansloi, the main surface run-off, which is flowing in the central part of the area from west to east along with a few ephemeral streamlets descending from the catchment area of the Bansloi River, forms the drainage system of the area. Apart from Bansloi river, there are few river and nallas in the 10 km radius of the study area. Drainage System map of the Study Area<br>
06
Long term meteorological data was collected from the nearest IMD station, Dumka, District Statistical Department, Office of the Dy. Director of Agriculture & field observation.
The area experiences hot & sub-humid tropical climate. During summers, the mercury rises well above 420 C. Winter in the region marks the mercury dropping to about 70 C. As for the direction of the wind, it mostly blows from the west; the secondary wind direction is from NW. The mean annual wind speed recorded by IMD was 2.6 km/h. The summer starts from middle of March and lasts till the middle of June. The winter starts from December and lasts till the month of February. Well-distributed rainfall between mid of June to mid of September marks the rainy season. The total rainfall on the average is about 1316.8 mm. Temperature Variations along with Rainfall Variations (Source:IMD) Graphical Representation of Maximum & Minimum Temperature and Rainfall Wind Rose Diagram Climatic Condition of the Study Area<br>
The area experiences hot & sub-humid tropical climate. During summers, the mercury rises well above 420 C. Winter in the region marks the mercury dropping to about 70 C. As for the direction of the wind, it mostly blows from the west; the secondary wind direction is from NW. The mean annual wind speed recorded by IMD was 2.6 km/h. The summer starts from middle of March and lasts till the middle of June. The winter starts from December and lasts till the month of February. Well-distributed rainfall between mid of June to mid of September marks the rainy season. The total rainfall on the average is about 1316.8 mm. Temperature Variations along with Rainfall Variations (Source:IMD) Graphical Representation of Maximum & Minimum Temperature and Rainfall Wind Rose Diagram Climatic Condition of the Study Area<br>
07
Exploration - Detail exploration in the block has been carried out since 1987.
Altogether 69 numbers of coring boreholes were drilled and considered for preparation of the Geological Report.
Drill hole spacing found to be around 400m x 400m.
Total meterage considered for preparation of Geological Report is 14506.70m.
Geophysical Logging has also been carried out in 54 number of boreholes drilled in the last phase of exploration carried out by NUPPL.
Overall borehole density within the block is approx.- 9.65 BH/Sq. km. Geological Exploration and Salient Features of the Mining<br>
Altogether 69 numbers of coring boreholes were drilled and considered for preparation of the Geological Report.
Drill hole spacing found to be around 400m x 400m.
Total meterage considered for preparation of Geological Report is 14506.70m.
Geophysical Logging has also been carried out in 54 number of boreholes drilled in the last phase of exploration carried out by NUPPL.
Overall borehole density within the block is approx.- 9.65 BH/Sq. km. Geological Exploration and Salient Features of the Mining<br>
08
8 Further, as per authenticated land schedule by Divisional Forest Officer (DFO), Dumka vide later dated 02.02.2022, the forest land categorized as three types of Notified Forest land and comes to 455.1108 Ha. Summary of the land schedule authenticated by CO, Gopikander vide letter no 69 dated 08.02.2021 Summary of the land schedule (Area 714.8553 Hect) Land utilization Plan (Area 714.8553 Hect)<br>
09
9 Proposed Production Schedule as per approved Mine Plan<br>
10
To meet the essential needs of the workers necessary welfare facilities as per the provisions of Factories Act, 1948 and amendment thereof will be provided by the company. The facilities will include
i) Shelter, Rest Rooms and Lunch Rooms with amenities like drinking water, toilet, etc.
ii) First Aid Appliances
iii) Parking Area and workshop for HEMM etc. Proposed HEMM & Infrastructure/Facility for the Project<br>
i) Shelter, Rest Rooms and Lunch Rooms with amenities like drinking water, toilet, etc.
ii) First Aid Appliances
iii) Parking Area and workshop for HEMM etc. Proposed HEMM & Infrastructure/Facility for the Project<br>
11
For drinking and domestic purpose (100 KLD water) a tube-well shall be installed at the North-eastern part of the block. No objection Certificate (NOC) is obtained from CGWA for abstraction of ground water vide NoC no-CGWA/NOC/MIN/ORIG/2022/14905 dated 25.03.2022
Except for drinking and domestic purpose, initially (for initial 6 years) water (1560 KLD water) will be drawn from the Bansloi River after taking necessary permissions from the Water Resource Department, Jharkhand, afterwards water shall be harvested at mine pit for industrial utilization.
Water Resources Dept. of Jharkhand has already recommended for withdrawal of Surface water (1560 KLD) from Bansloi River on 30.05.2022. Water requirement for the project and it’s Sources<br>
Except for drinking and domestic purpose, initially (for initial 6 years) water (1560 KLD water) will be drawn from the Bansloi River after taking necessary permissions from the Water Resource Department, Jharkhand, afterwards water shall be harvested at mine pit for industrial utilization.
Water Resources Dept. of Jharkhand has already recommended for withdrawal of Surface water (1560 KLD) from Bansloi River on 30.05.2022. Water requirement for the project and it’s Sources<br>
12
12 Terms of Reference (ToR) is granted for preparation of EIA/EMP report for obtaining Environmental Clearance by the MOEF & CC vide letter no. IA-J-11015/18/2020-IA-II(M), dated 5th Nov’2020 for a production capacity of 9 MTPA (normative) and 13.5 MTPA (peak rated).
ToR Compliance Report: ToR<br>
ToR Compliance Report: ToR<br>
13
13 ToR compliance-Additional Conditions<br>
14
14 ToR compliance-Additional Conditions<br>
15
15 ToR compliance-Additional Conditions<br>
16
16 ToR compliance-Additional Conditions<br>
17
17 ToR compliance-Additional Conditions<br>
18
18 ToR compliance-General Conditions<br>
19
19 ToR compliance-Generic Conditions<br>
20
20 ToR compliance-Generic Conditions<br>
21
21 ToR compliance-Generic Conditions<br>
22
22 ToR compliance-Generic Conditions<br>
23
Environmnet Impact Assessment (EIA) Study-Air Quality To monitor the ambient air quality two stations in core zone and eight stations in buffer zone on priority basis have been fixed.
Ambient air quality monitoring was carried out at a frequency of two days per week at each location during the winter season starting from December, 2020 to February, 2021.
The duration of sampling of Particulate Matter (PM2.5 & PM10), SO2, NOx and CO was carried out continuously for twenty four hourly per day.
Samples of air were tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
It has been observed from the sample analysis report that all the values are within prescribed limit.<br>
Ambient air quality monitoring was carried out at a frequency of two days per week at each location during the winter season starting from December, 2020 to February, 2021.
The duration of sampling of Particulate Matter (PM2.5 & PM10), SO2, NOx and CO was carried out continuously for twenty four hourly per day.
Samples of air were tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
It has been observed from the sample analysis report that all the values are within prescribed limit.<br>
24
Environmnet Impact Assessment (EIA) Study-Water Quality Water quality parameters of 5 (five) Surface and 5 (five) Ground water resources within 10km radius of the study area have been studied during the winter season starting from December, 2020 to February, 2021.
Samples of water were also tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
The analytical results of surface water samples at different location for various parameters reveal that all the parameters comply with “IS 2296: Class C” standards indicating their suitability for drinking and other purposes after conventional treatment followed by disinfection.
The analytical results of groundwater samples showed all the parameters are within the prescribed limits as per IS: 10500 standards for drinking water.<br>
Samples of water were also tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
The analytical results of surface water samples at different location for various parameters reveal that all the parameters comply with “IS 2296: Class C” standards indicating their suitability for drinking and other purposes after conventional treatment followed by disinfection.
The analytical results of groundwater samples showed all the parameters are within the prescribed limits as per IS: 10500 standards for drinking water.<br>
25
Environmnet Impact Assessment (EIA) Study-Noise Quality 10 (Ten) noise monitoring stations were identified keeping in view the nature of the monitoring location i.e. residential areas in villages, schools, roads, etc. for the assessment of the existing noise levels in four directions. These are also the stations where air monitoring was undertaken in core & buffer zone.
Readings have been recorded during the winter season starting from December, 2020 to February, 2021.
Readings have been recorded at 1 hour interval for 24 hours.
From the analysis report it is concluded that the noise levels within the study area are well within the specified CPCB standards.<br>
Readings have been recorded during the winter season starting from December, 2020 to February, 2021.
Readings have been recorded at 1 hour interval for 24 hours.
From the analysis report it is concluded that the noise levels within the study area are well within the specified CPCB standards.<br>
26
Environmnet Impact Assessment (EIA) Study-Soil Quality Soil samples were collected during the winter season starting from December, 2020 to February, 2021 from six different sampling locations and were analyzed for the soil structure, texture, moisture, content, nutrient level and other chemical parameters.
Soil samples were tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
The presence of organic carbon, N, P, K and moisture retaining capacity of the top soil indicates that the soils will support plant growth.<br>
Soil samples were tested in the MoEF & CC and NABL accredited laboratory of M/s Center for Envotech & Management Consultancy Pvt. Ltd., Bhubaneswar.
The presence of organic carbon, N, P, K and moisture retaining capacity of the top soil indicates that the soils will support plant growth.<br>
27
Environment Management Plan The mining activities may disturb environment in various ways such as degradation of land, dust generation, deterioration of water and soil quality, affecting the biological and socio-economic environment of the area. For that suggested mitigation measures are as follows:
Water sprinkling on haul road and construction & maintenance of mines haul road to control fugititive dust emission. By covering the loaded material with tarpaulin sheets can minimize the air pollution due to dust generation.
Mine faces shall be regularly cleaned so as to ensure that the same is safe to work.
Vehicles having Pollution under Control (PUC) Certificate will be engaged in the mine. Regular maintenance and testing of all mining equipment as per manufacturer’s guidelines will be done.
Construction of garland drain around the dump, Construction of toilets with septic tank & soak pits, Water Treatment Plant for domestic use of mine pit water.
Suitable PPE will be provided to the exposed workers.
Entry of unauthorized persons will be prohibited.
The directives of Director General Mines’ Safety would be followed.<br>
Water sprinkling on haul road and construction & maintenance of mines haul road to control fugititive dust emission. By covering the loaded material with tarpaulin sheets can minimize the air pollution due to dust generation.
Mine faces shall be regularly cleaned so as to ensure that the same is safe to work.
Vehicles having Pollution under Control (PUC) Certificate will be engaged in the mine. Regular maintenance and testing of all mining equipment as per manufacturer’s guidelines will be done.
Construction of garland drain around the dump, Construction of toilets with septic tank & soak pits, Water Treatment Plant for domestic use of mine pit water.
Suitable PPE will be provided to the exposed workers.
Entry of unauthorized persons will be prohibited.
The directives of Director General Mines’ Safety would be followed.<br>
28
Environment Management Plan For water conservation -contour bund, recharge pit, settling pond, coco filtration etc. can be done. Pond shall be the post mining use of land in the ML area. It shall fulfill the water need of the area for agriculture and will also be used for pisciculture.
Massive afforestation on abandoned mining benches, overburden dumps and other areas shall be done to increase the biodiversity of the local ecosystem and to control air pollution as well as noise pollution.
Provision of safety shoes, dust mask, safety goggles, ear plugs, safety helmets, etc. to workers. Construction of Rest Shelters & First Aid Centre.
Rotation of workers exposed to high noise areas.
It shoul be planned for blasting only in day time on a particular hour, where the movements of the people are restricted and minimal.
The rest shelter must be away from the blasting operation area.
The workers will be periodically checked under Rule 29 (b) of Mines Rule, 1952 and if any worker found to have any occupational disease will be immediately removed from the proposed mine area and will be supported with proper medical care.
Training to the workers on safety aspects, implementation of traffic rules & codes to avoid casualties.<br>
Massive afforestation on abandoned mining benches, overburden dumps and other areas shall be done to increase the biodiversity of the local ecosystem and to control air pollution as well as noise pollution.
Provision of safety shoes, dust mask, safety goggles, ear plugs, safety helmets, etc. to workers. Construction of Rest Shelters & First Aid Centre.
Rotation of workers exposed to high noise areas.
It shoul be planned for blasting only in day time on a particular hour, where the movements of the people are restricted and minimal.
The rest shelter must be away from the blasting operation area.
The workers will be periodically checked under Rule 29 (b) of Mines Rule, 1952 and if any worker found to have any occupational disease will be immediately removed from the proposed mine area and will be supported with proper medical care.
Training to the workers on safety aspects, implementation of traffic rules & codes to avoid casualties.<br>
29
Estimated Project Cost & Environmental Cost and Project Benefit Estimated Capital cost for the Pachwara South Coal Block project is 1795.01 crore (base January, 2018).
Total capital cost towards Environment Protection has been estimated as Rs. 22.30 crore and total recurring cost for the entire life of the mine (38 years) has been estimated as Rs. 36.71 crore. Therefore, operational cost for Environment Protection would be around Rs. 0.96 Crore/year.
Coal from this project is linked to Ghatampur Thermal Power Plant, with a capacity of 1980 MW (3 X 660 MW) at Ghatampur Tehsil in Kanpur Nagar District, Uttar Pradesh.
Benefit to economy due to this specific project will be around 18530.21 Crore.
The national economy will gain to the extent of Rs. 3340.25 crore by the way of wages payable to about 1288 numbers of permanent employees for 38 years and it is expected that around 3000 persons will get indirect employment from this project.<br>
Total capital cost towards Environment Protection has been estimated as Rs. 22.30 crore and total recurring cost for the entire life of the mine (38 years) has been estimated as Rs. 36.71 crore. Therefore, operational cost for Environment Protection would be around Rs. 0.96 Crore/year.
Coal from this project is linked to Ghatampur Thermal Power Plant, with a capacity of 1980 MW (3 X 660 MW) at Ghatampur Tehsil in Kanpur Nagar District, Uttar Pradesh.
Benefit to economy due to this specific project will be around 18530.21 Crore.
The national economy will gain to the extent of Rs. 3340.25 crore by the way of wages payable to about 1288 numbers of permanent employees for 38 years and it is expected that around 3000 persons will get indirect employment from this project.<br>
30
Social Impact Assessment (SIA) Study The SIA study has been conducted in and around Pachwara South Coal Block to formulate compensation package for the PAP and PAF’s.
Following benefits have been structured for the PAP and PAF’s:
Subsistence grant/allowance for displaced families.
Provision of housing units in case of displacement.
Transportation cost for displaced families.
Resettlement Allowance (for displaced families).
Cattle shed/petty shop cost.
Artisan/small traders/others (in case of displacement).
In addition, extra benefits will be provided to SC/ST families as per the provision of RFCTLARR Act, 2013.
For resettlement of populations, infrastructural facilities and basic minimum amenities will be provided as per Schedule-III of the RFCTLARR Act, 2013 to ensure that the resettled population in the new colony can secure for themselves a reasonable standard of community life and can attempt to minimise the trauma involved in displacement. The area of land required for any R & R colony will be acquired by considering the land use breakup and the village population.<br>
Following benefits have been structured for the PAP and PAF’s:
Subsistence grant/allowance for displaced families.
Provision of housing units in case of displacement.
Transportation cost for displaced families.
Resettlement Allowance (for displaced families).
Cattle shed/petty shop cost.
Artisan/small traders/others (in case of displacement).
In addition, extra benefits will be provided to SC/ST families as per the provision of RFCTLARR Act, 2013.
For resettlement of populations, infrastructural facilities and basic minimum amenities will be provided as per Schedule-III of the RFCTLARR Act, 2013 to ensure that the resettled population in the new colony can secure for themselves a reasonable standard of community life and can attempt to minimise the trauma involved in displacement. The area of land required for any R & R colony will be acquired by considering the land use breakup and the village population.<br>