Download Presentation The PPT/PDF document "Duke Energy Carolinas" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Duke Energy CarolinasQuarterly Stakeholder Meeting
Independent Entity Services
Thursday, February 25, 2010
2:00 to 3:00 p.m. ESTSlide2
2
2
2
Agenda
Follow-up Action Items from November 5th, 2009
Return to Daylight Saving Time
Resales & Transfers
Duke OASIS Business Practices
Supplemental e-Mail Notification
FERC Orders 676E and 729
NAESB Update - Wholesale Electric Quadrant
Open Access Transmission Tariff Filing
Duke – Progress Energy Non-Firm ATC Agreement
Wrap-upSlide3
3Action Items
Follow-up from November 5, 2009
Daylight Saving Time Transition to Standard
Reported Problem & Follow-up
Evaluated e-Tag and OASIS Reservation
PJM rejected e-Tag for lack of transmission
PJM OASIS reservation did not match e-Tag timing
Tag was for 2hrs
Reservation was for 1hr
e-Tag and OASIS reservation for Duke were valid
Spring forward will be addressed in later slidesSlide4
4
Return to
Daylight Saving Time
Prepare for Transition
Spring Forward March 14, 2010 – (Eliminate HE 02:00 EST)
Adjust time zone display settings on OASIS & e-TagOATI User Guides for changing Time Zone Settings
OASIS – HELP – Table of Contents – DST Cutover Document
ETS – HELP – User Guide – Contents – General ETS Options
Fall back will be on November 7, 2010
OATI OASIS
Entering A TSR across the change (Eliminate HE 02:00 EST)
OATI E-Tag
Tagging across the time changeSlide5
5
Overview of
Resales & Transfers
Business Practices have not changed
Resales
Resale is a request to convey scheduling rights of a PTP reservation from a Reseller to an Assignee
Price is negotiated between Reseller and Assignee ($/MW – Hour reserved)
Negotiations
On OASIS
Off OASIS
Transfers
Transfer is a request to convey all rights and obligations associated with a reservation for PTP from a Reseller to an Assignee
Price is same as original reservation
Conveyance
Full Transfer
Partial Transfer
Transmission Service AgreementSlide6
6
OATI webOASIS
and Resales
NAESB Business Practice Standards WEQ 001-11.5 & WEQ 013-2.6.7
Not required to use OASIS to make arrangements for sale or reassignment of transmission rights
Reseller is required to post the information on OASIS
On OASIS Off OASIS
Post for Resale
(RESALE)
TransAssign
(Secondary Market RESALE)
*
Reseller
*
Reseller
Creates a Resale Posting OASIS TSR Click
Transmission Resale Offerings * Assignee Creates the Resale Transmission Service Request Details for RESALE user entry can be found on OATI webOASIS on the menu bar click Slide7
7
OATI webOASIS
and Transfers
NAESB Business Practice WEQ 001-12.5
Negotiations may be conducted off OASIS
Transfers must be posted and approved on OASIS
Full Transfer
On OASIS from the TSR click
The amount (MW’s) of the full Transfer will include capacity which is not available for scheduling due to curtailment or other reductions
The Original Reservation and all encumbrances are transferred to the Assignee
Partial Transfer
On OASIS from the TSR click
OASIS will Limit the Partial Transfer to the granted capacity of the Parent Reservation less any reductions to the capacity available for scheduling
Only the capacity available for scheduling can be Transferred (Part_Transfer)
Slide8
8Transmission Service Agreement
(
Resales, Transfers and Reassignments)
Assignee must execute Attachment A-1 of OATT with Duke Energy Carolinas
Executed no later than 24hrs prior to the commencement of the reassigned service
If the service agreement is not executed on time the Resale will be annulled
Process time for execution of the service agreement is dependent on Assignee’s credit requirements with Duke
Attachment A-1must be transmitted to:
Duke Energy Carolinas, LLC
526 South Church Street
Mail Code: EC02A
Charlotte, NC 28202
Attn: Charlotte Glassman
Transmission Contracts Manager
Phone: 704 382-3621
Fax:
704 382-0850
charlotte.glassman@duke-energy.comSlide9
9
9
9
Duke OASIS
Business Practices
Duke Business Practices (BP) Structure and Content change
Alignment with NAESB
NAESB BP Standards are copyrighted
Duke will show references to NAESB Standards and eliminate redundant/conflicting text
NAESB permission has been requested to continue to duplicate certain Practices and Standards
Request Timing Requirements Table
Priorities for Competing Reservation Requests Table
Preemption and CompetitionSlide10
10
10
10
Supplemental
E-Mail Notification
Duke Energy Carolinas has discontinued the Supplemental Electronic Communications program on February 15
Announcement was posted in OASIS Business Practices
Duke has a new program called Supplemental E-Mail Notification
Link
to details of program (posted on Duke OASIS home page)
E-mail notification will be sent directly from our OASIS vendor, OATI
Only e-mail notification is available (fax notification was discontinued)
Subscribers will receive all notices
As in the past, no notification will be provided for changes to linked material
e.g., Duke provides a link to the NAESB Home Page but there will not be any notification when NAESB changes material on the NAESB Home PageSlide11
11
11
11
Supplemental
E-Mail Notification
(continued)
Notification will be provided for new or modified web pages on the Duke OASIS Home Page in the following categories:
+Performance Metrics + Generator Interconnection
+ Business Practices, Waivers + Transmission Service Studies
and Exemptions + Designated Network Resources
+ ATC Information + Transmission Planning
+ Contact Information + Provider Information
+ Transmission Tariff + Independent Entity
+ Transmission Rates + Stakeholder MeetingsSlide12
12
12
12
FERC Orders
676-E and 729
NAESB Business Practice Standards (RM05-013)
Final Order 676-E issued 11/24/09
Published 12/3/09 in Federal Register (74 FR 63288)
Effective date April 1, 2011 (subject to FERC clarification in rehearing)
NERC ATC Standards (Docket Nos. RM08-19-000, RM08-19-001, RM09-5-000, RM06-16-005)
Final Order 729 issued 11/24/09
Published 12/8/09 in Federal Register (74 FR 64884)
Effective date April 1, 2011 (subject to FERC clarification in rehearing) Slide13
13
13
13
NAESB Update
Wholesale Electric Quadrant
WEQ Executive Committee meeting (02/02/2010)
NAESB WEQ Glossary
The EC adopted the recommendation and sent it out for ratification by the NAESB membership
Network Service on OASIS
The timeline for completion of the recommendation was extended to the end of the second quarter 2010
Coordination of Transmission Requests Across Transmission Providers
A team was established to develop the scope of this project prior to the subcommittee’s initiating work. James Manning (NCEMC), Jim Eckelkamp (Progress Energy) and Alan Pritchard (Duke) were among the people named to the team. Also, the timeline for completion of the recommendation was extended to the end of the 4th quarter 2010.
Electric Industry Registry Confidentiality Agreement
The EC decided not to adopt the recommended standardSlide14
14
14
14
Open Access
Transmission Tariff Filing
In 2010 Duke Energy Carolinas will request FERC approval of a new rate for the Transmission Service under our Open Access Transmission Tariff (OATT).
Current rate was approved in 1996 and was based on 1994 data
Costs to provide reliable transmission service have increased however, it is too early in process to quantify rate impacts
Propose to move from a stated (fixed) rate to a formula rate to be updated annually
Propose to have new rates in effect prior to the end of 2010
Intend to have discussions with our Network Customers prior to filing the new rate with FERCSlide15
15
15
15
Duke - Progress Energy
Non-Firm ATC Agreement
Duke Energy Carolinas and Progress Energy Carolinas have negotiated an agreement addressing Non-Firm parallel flows across the PJM interface
Implementation details and timeline are to be determined
Combined Non-Firm ATC with PJM will be calculated and posted on Duke and PEC OASIS sites
Customers will still reserve transmission service with either PEC or DukeSlide16
16
16
16
Wrap-up
Proposed Next Quarterly Stakeholder Meeting
Thursday, May 13, 2010 – 2 p.m. to 3 p.m. ET
Customer Suggested Topics?
This is the forum for discussing emergent topics (Upcoming changes, stakeholder input)
Questions and Comments