POWERING for CO2 Colling plant VELO+UT POWERING for CO2 Colling plant VELO+UT

POWERING for CO2 Colling plant VELO+UT - PowerPoint Presentation

Masterchief
Masterchief . @Masterchief
Follow
342 views
Uploaded On 2022-07-28

POWERING for CO2 Colling plant VELO+UT - PPT Presentation

Power distribution today EXD1 EXD2 EXD13 RICH12 OTPSSPD IT TT UPS Online 100kVA UPS Online 100kVA ESD1 63A full switchboard 250A 1 bandeau spare ID: 931308

ups 16a power velo 16a ups velo power tri co2 electrical 250a switchboard 63a 100kva colling plant powering 10kva

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "POWERING for CO2 Colling plant VELO+UT" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

POWERING for CO2 Colling plant VELO+UT

Power distribution today:

EXD1

EXD2

EXD13

RICH1+2

OT+PS/SPD

IT

TT

UPS Online

100kVA

UPS Online

100kVA

ESD1

63A (full switchboard)

250A (1 bandeau spare)

Velo

Systems

ESD2

TDM (several 63A breakers free)

160 A ( limited spare available)

Space for 250A,400A… available

EBD repowering

Slide2

POWERING for CO2 Colling plant VELO+UT

Power available on VELO platform today:

~40 kWESD106: 16A MonoESD109: 16A Mono ESD205: 16A Tri

(~18kW)EXD1305: 16A MonoEXD1307: 16A MonoEXD1306: 10A Tri EXD1311: 10A Tri

(~21kW)

Need for future CO2 cooling systems:(Burkard email to Heinrich-> IBL Atlas specif)UPS: 70kW !!

UPS1: 63A Tri + 16A Tri + 16A MonoUPS2: 16A MonoEXD: 58kW63A Tri16A Tri16A Mono

Possibility if UPS1+2 really need:

-use a part of both 100kVA ‘Online’ (less used after LS2)? -installed new: 2x20kVA (maxi) possible near the 10kVA MSS+DSS in place-find new area for 1x100kVA ?

-use ‘local’ UPS (have few old ‘Online’ APC 10kVA)-> ok with redundancy

Do Velo+UT

need the same ‘cooling power’ of IBL ? (same electrical power)Do we want also +/- the whole system on UPS ?

Slide3

POWERING for CO2 Colling plant VELO+UT

Velo platformReuse the EXD13 switchboard (58kW power to be checked, need new breakers, new cables: + 5

kCHF?) Reuse ESD power for ‘local UPS’ 10kVA ?but need additional UPS power

PZ AlcoveInstall a new EXD switchboardBreaker ABB 250A: 5kCHF

150mm2 cables with installation:4.5kCHFCable trays:1.75kCHFSwitchboard: 10-12kCHFTotal: 20-25kCHF

for Both (if Uninterruptible power confirm)Install new UPS, new switchboard, new cables

Compare different location in term of ‘electrical cost’

Conclusion: cost difference difficult to estimate today (depend on UPS solution)

PZ Alcove ~ 20

kCHF

more but finally could be not a high % of total electrical cost