Steering Committee October 21 2013 AZNet II Arizona Network CENTURYLINK Update AZNet II Arizona Network Agenda Opening Remarks Refresh Updates ID: 726854

arizona network core aznet network arizona aznet core platform refresh call activity legacy datacenters closed summary center part update

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "AZNet II – Arizona Network" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

AZNet II – Arizona Network

Steering Committee

October 21, 2013Slide2

AZNet II – Arizona Network

CENTURYLINK Update Slide3

AZNet II – Arizona Network

Agenda

Opening Remarks

Refresh Updates

NCC Activity

Ticket Activity Summary & SLR Performance Report

Closing RemarksSlide4

AZNet II – Arizona Network

Refresh Status

Slide5

AZNet II – Arizona Network

Core Refresh

Network core

Core routers in all state datacenters

Full integration from old core to new core; legacy MPLS

New MPLS configuration in core, total redesign; agency VRF’s

Upgrade diverse connectivity to Tucson, 10GigNew Carrier host to included geo diversity which was not part of legacyDecommission of legacy connections to TucsonEstablish new DMARC

Datacenter redesign to included carrier relocation

Slide6

AZNet II – Arizona Network

Core Refresh

Voice core

Stood up new Unified VoIP core platform in all state datacenters

Established fail over redundancy in VoIP platform; was not part of legacy

Configured voice services on new server and redundant storage platform

Install multiple gateways within core Stood up new voicemail platform with redundancy for survivability Hooks into legacy SL100 for migration time of refreshed locationsCentralized trunking for refreshed location.Slide7

AZNet II – Arizona Network

Core Refresh

Call Center core

Stood up new call center in Phoenix and Tucson datacenters

Established fail over redundancy platform; was not part of legacy

Configured on hardened server platform, redundant storage platform

Install multiple gateways dedicated to call centerStood up major call center application related to ACA Implemented reporting platform dedicated to call centerStanding up new recording platform for call centerSlide8

AZNet II – Arizona Network

Core Refresh

Security core – Pre Production

All new security equipment has been placed in state datacenters

Burn in and testing

Project plan developed, reviewed and being implemented

Moratorium Working with agency and oversightRedundant connectivity Slide9

AZNet II – Arizona Network

Refresh Projects Completed - Summary by MonthSlide10

AZNet II – Arizona Network

Network Change Activity

Slide11

AZNet II – Arizona Network

Network Change Control (NCC) ActivitySlide12

AZNet II – Arizona Network

Ticket Activity Summary

&

SLR Performance

Slide13

AZNet II – Arizona Network

12-Month Ticket Activity Summary

Total # of Tickets Closed:

23283

Average # Closed per Month:

1940Slide14

AZNet II – Arizona Network Slide15

AZNet II – Arizona Network

Closing Remarks

Slide16

AZNet II – Arizona Network

Operations Status

Slide17

AZNet II – Arizona Network

Operations Update – Sev1/Sev2 Tickets Slide18

AZNet II – Arizona Network

Operations Update –

Tasks Created/Closed Slide19

AZNet II – Arizona Network

Tasks Created by Week – by Type Slide20

AZNet II – Arizona Network

Tasks Closed/Resolved by Week – by Type