TECHNICAL MEETING HOUSE HOLD AND PALM OIL MILL IN NORTH SUMATERA Semarang 10 th 11 th of July 2011 Universitas Sumatera Utara USU TWG III Team HOUSE HOLD Household is the biggest runner up electricity consumer sector in Indonesia after industrial ID: 494712

oil palm electricity pome palm oil pome electricity ton cermin energy province bulb calculation lamps biogas waste data village

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "TWG III – Energy Efficiency Master Pla..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

TWG III – Energy Efficiency Master Plan TECHNICAL MEETING HOUSE HOLD AND PALM OIL MILLIN NORTH SUMATERA

Semarang, 10th-11th of July 2011

Universitas

Sumatera Utara (USU)

TWG III TeamSlide2

HOUSE HOLDHousehold is the biggest runner up electricity consumer sector in Indonesia after industrial. In 2003 electricity consumption in household sector reached 35.753,05 MWh, while industry reached 36.497,25 MWh. By assumed the average of electricity requirement growth equal to 7% each year during time range of 30 years, it will cause electricity consumption in household sector increase piercingly out of 21,52 GWh in 2000 become about 444,53

GWh in 2030.Slide3

Padang Cermin is a village which is located in Langkat Sub-Province, it is about 35 km from Medan. Padang Cermin has wide area equal to 1948,2 Ha consisting of 837,6 Ha lowland land, 649,7 Ha plantation land and the rest is applied as settlement land and public facility.Most of Padang Cermin people work as farmers, with population 11.997 people that consist of 6122 men and 5875 women. The major people graduated from Senior High School and only a few of them graduated from scholar education.

Survey for House Hold

Profile of Padang

Cermin

village,

Langkat

Sub-Province Slide4

A number of people use electricity energy as energy source that is applied as lighting and to for some electronic equipments, but there are also some households which still use energy source from oil fuel as kerosene applied as lightings and cooking.People’s houses taken as object of collecting data is distinguished based on level of attached electricity usage, that is 450 VA, 900 VA and 1300 VA. Survey is done to see electronic equipment applied and calculate capacity of each electricity equipment and usage duration.Survey for House Hold

Profile of Padang Cermin

village,

Langkat

Sub-Province Slide5

Bulb Lamps PricesNon Energy and Energy Saver LampSlide6

Bulb Lamps Data figures for 450 VA HHsPadang Cermin village, Langkat Sub-Province Slide7

Bulb Lamps Data figures for 900 VA HHsPadang Cermin village, Langkat Sub-Province Slide8

Bulb Lamps Data figures for 1300 VA HHsPadang Cermin village, Langkat Sub-Province Slide9

Households by Regency/Municipality and Occupancy Status of Dwelling Unit in North SumateraSlide10

NPV Calculation and scenario for 450VA HHs Bulb LampsSlide11

NPV Calculation and scenario for 900VA HHs Bulb LampsSlide12

NPV Calculation and scenario for 1300VA HHs Bulb LampsSlide13

Survey for Palm Oil MillPalm Oil Factory at PTPN IV Mayang Bosar MaligasPalm Factory

Mayang Bosar Maligas is located in Perdagangan, Sub-Province

Simalungun,North

Sumatera, it is about150 km from Medan.. Palm Factory

Mayang

Bosar

Maligas

was built 1951 with mill process of 40 ton/hour.

For steam requirement of electricity power, we need a boiler as the energy source. The used boiler is a waste tube boiler. Boiler has function to change water into high pressured heat vapor which then be used to turn around turbine blade integrated with electric generator to produce electricity.Slide14

Palm Oil Mill Specification at PTPN IV Mayang Bosar MaligasSlide15

Potential of liquid waste (POME)Besides solid waste, liquid waste also has big enough capacity in palm industry. Liquid waste especially produced during clarification processing, deposition and centrifugation which is done during CPO clarification processing. According to the central of palm research (1992-1993) the capacity of liquid waste1-1,3m3/ton bunch of fresh fruit or 2-3 ton liquid waste/ton oil.Slide16

Flow Chart of POMESlide17

POME CalculationPalm Oil Mills in North Sumatera, have capacity around 30 Ton FFB/hour to 60 ton FFB/hour. Palm Oil Mills process during production will produce Palm Oil Mill Effluent (POME) .Every each ton FFB produced 65% m3 of POMEIf one Palm Oil Mill produce 40 ton FFB per hour then it will have 26 m3/hour POMEPOME that produced from the Palm Oil Mill will process at anaerobic pool to have an Biogas. A Chemical Oxigen Demand (COD) is needed at some value to produce Gas from POME. Slide18

From the laboratorium data, COD normally is between 35 – 45 kg/m3With COD 40kg/ m3 we can calculate the production of BIOGAS. For examples for 26 m3 of POME will produce 1040 kg COD.Every each kg of COD it will produce 35% of Biogas, with 1040 kg COD it can have 364 m3 Biogas.With known Low Heating Value (LHV) of Biogas , and assuming 35% efficeincy , the power from generated power can be calculated.

And the generator input power is :364 m3 biogas x 35,880 MJ/m3 = 3,63 MW(t)h (MW(t)h = Mega Watt thermal hour)

Power generated is 3,63 MW(t)h x 0,35 =

1,3 MW(e)h

POME CalculationSlide19

Data for NPV CalculationSlide20

NPV Calculation