4 Smart City Project Initiatives for Test bed Ms Velankani By Design have provided 50 Nos of 5 MP Cameras 14 have been installed amp the balance installation is in progress 4 Smart City Project Initiatives for Test bed ID: 788076
Download The PPT/PDF document "ELCITA UPDATE March 2017" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
ELCITA UPDATE
March 2017
Slide24
Smart City Project Initiatives for Test bed
M/s
Velankani
(By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.
Slide34
Smart City Project Initiatives for Test bed
43
Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.
Slide44
Smart City Project Initiatives for Test bed
Smart Water Meter supplied by M/s GAIA has been installed in IFIM. TCL are providing the network Connectivity.
Slide54
Smart City Project Initiatives for Test bed
M/s
Tejas
Network are providing Network design for entire EC & POE switches for the cameras on the test bed.
M/s
Multiproe have been finalized for supply & installation of Video wall at our command Centre.M/s Wipro Ltd are the integrated partner for Smart City Interface.M/s P Park E are providing parking sensors through LORA network.
Slide6LOCATION MAP
FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)
Slide7PROPOSAL
FOR RELOCATING
SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)
Slide8PROPOSED 400 KLD STP at KSSIDC COMPLEX
Slide94
Estate Management
Modification
of
existing
street light
poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 8 – Pump house Road
E
– Toilets
20 e-toilets Installed & Operational
Estate
survey
Final Data check & Software Training work in progress
Slide10Footpath Works – Completed
Footpath Work along East Avenue 1 (TCS Road)
Footpath Work along
West Lane 1 (MSME Road
)
Slide11Footpath Works – Completed
Footpath
& Drain Work
along
East Lane 1 (
Hical
Road
)
Slide12Footpath Works – Completed
Footpath works near
Erkadi
Systems – West Avenue 2
RCC Culvert near
Erkadi
Systems – West Avenue 2
Slide1313
Footpath & Drain Works – Under Progress
West Avenue-9 (Petrol Bunk Road)
West Avenue-8 (Police Station Side)
Slide14Footpath Works – Under Progress
Footpath works near Siemens – West Avenue 1
Pavers Laying Work near C-dot (West Avenue – 1)
Slide15Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (BWSSB)
3KL Capacity UG Sump for E- Toilet (HP Avenue)
Slide16Sump Works – Under Progress
3KL Capacity UG Sump for E- Toilet (Tech Mahindra)
3KL Capacity UG Sump for E- Toilet (
Opp
DMart
)
Slide17Fabrication Work – Under Progress
Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)
Slide18Other Works – Completed
Sewer line works
opp
HICAL East
Avenue
3 (Tech Mahindra Road
)
2 Nos of Cattle trap at 300KLD STP
Slide19Fabrication Work – Completed
Chain-link fencing for Siemens RMU Yard
Slide2020
Estate Management
Contract Awarded
Proposed
construction of Drains, laying of Pavers,
Kerb
stones and Drain cover slabs from
Xime
Junction
to Tata power rear gate & TCS Gate no 2 to Edizi Tools
junction
(East Avenue 2 & 4), East Phase
Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase
Along Café Corner & JP IT Park Road
Slide2121
Estate Management
Contracts on Anvil
Providing
House Keeping Services to ELCITA within
e-city
Industrial
Township Area.
Modification
of
existing
street light
poles
with LED lights, Splitters, Camera, Advertisement Board, etc
Construction of Concrete Drains, laying of Pavers, Kerb
stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase)Construction of
400
KLD STP in
KSSIDC Land
,
West
Phase.
Construction of 500 KLD STP in KIADB Land, East Phase.
Slide22Total E-waste Disposed – 4 Tons
Total compost Sold and used – 6 Tons
Paper recycled
255.7
Tons
Plastic recycled
370.8
Tons
Metal recycled
21.5
Tons
Glass recycled
87
Tons
Other Dry waste recycled
57.6
Tons
Total Dry Waste recycled
792
Tons
Total waste managed for last two years -
Average capacity use of ELCITA STP - 200 KLD
SUSTAINABILITY
Slide23Thank You