4 Smart City Project Initiatives for Test bed Ms Velankani By Design have provided 50 Nos of 5 MP Cameras 14 have been installed amp the balance installation is in progress 4 Smart City Project Initiatives for Test bed ID: 788076

west avenue works amp avenue west amp works footpath east phase city tons road work progress smart recycled sump

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "ELCITA UPDATE March 2017" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

ELCITA UPDATE

March 2017

Slide2

4

Smart City Project Initiatives for Test bed

M/s

Velankani

(By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.

Slide3

4

Smart City Project Initiatives for Test bed

43

Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

Slide4

4

Smart City Project Initiatives for Test bed

Smart Water Meter supplied by M/s GAIA has been installed in IFIM. TCL are providing the network Connectivity.

Slide5

4

Smart City Project Initiatives for Test bed

M/s

Tejas

Network are providing Network design for entire EC & POE switches for the cameras on the test bed.

M/s

Multiproe have been finalized for supply & installation of Video wall at our command Centre.M/s Wipro Ltd are the integrated partner for Smart City Interface.M/s P Park E are providing parking sensors through LORA network.

Slide6

LOCATION MAP

FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

Slide7

PROPOSAL

FOR RELOCATING

SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

Slide8

PROPOSED 400 KLD STP at KSSIDC COMPLEX

Slide9

4

Estate Management

Modification

of

existing

street light

poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 8 – Pump house Road

E

– Toilets

20 e-toilets Installed & Operational

Estate

survey

Final Data check & Software Training work in progress

Slide10

Footpath Works – Completed

Footpath Work along East Avenue 1 (TCS Road)

Footpath Work along

West Lane 1 (MSME Road

)

Slide11

Footpath Works – Completed

Footpath

& Drain Work

along

East Lane 1 (

Hical

Road

)

Slide12

Footpath Works – Completed

Footpath works near

Erkadi

Systems – West Avenue 2

RCC Culvert near

Erkadi

Systems – West Avenue 2

Slide13

13

Footpath & Drain Works – Under Progress

West Avenue-9 (Petrol Bunk Road)

West Avenue-8 (Police Station Side)

Slide14

Footpath Works – Under Progress

Footpath works near Siemens – West Avenue 1

Pavers Laying Work near C-dot (West Avenue – 1)

Slide15

Sump Works – Under Progress

3KL Capacity UG Sump for E- Toilet (BWSSB)

3KL Capacity UG Sump for E- Toilet (HP Avenue)

Slide16

Sump Works – Under Progress

3KL Capacity UG Sump for E- Toilet (Tech Mahindra)

3KL Capacity UG Sump for E- Toilet (

Opp

DMart

)

Slide17

Fabrication Work – Under Progress

Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)

Slide18

Other Works – Completed

Sewer line works

opp

HICAL East

Avenue

3 (Tech Mahindra Road

)

2 Nos of Cattle trap at 300KLD STP

Slide19

Fabrication Work – Completed

Chain-link fencing for Siemens RMU Yard

Slide20

20

Estate Management

Contract Awarded

Proposed

construction of Drains, laying of Pavers,

Kerb

stones and Drain cover slabs from

Xime

Junction

to Tata power rear gate & TCS Gate no 2 to Edizi Tools

junction

(East Avenue 2 & 4), East Phase

Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase

Along Café Corner & JP IT Park Road

Slide21

21

Estate Management

Contracts on Anvil

Providing

House Keeping Services to ELCITA within

e-city

Industrial

Township Area.

Modification

of

existing

street light

poles

with LED lights, Splitters, Camera, Advertisement Board, etc

Construction of Concrete Drains, laying of Pavers, Kerb

stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase)Construction of

400

KLD STP in

KSSIDC Land

,

West

Phase.

Construction of 500 KLD STP in KIADB Land, East Phase.

Slide22

Total E-waste Disposed – 4 Tons

Total compost Sold and used – 6 Tons

Paper recycled

255.7

Tons

Plastic recycled

370.8

Tons

Metal recycled

21.5

Tons

Glass recycled

87

Tons

Other Dry waste recycled

57.6

Tons

Total Dry Waste recycled

792

Tons

Total waste managed for last two years -

Average capacity use of ELCITA STP - 200 KLD

SUSTAINABILITY

Slide23

Thank You