/
BG Consulting Engineers BG Consulting Engineers

BG Consulting Engineers - PDF document

esther
esther . @esther
Follow
370 views
Uploaded On 2021-08-06

BG Consulting Engineers - PPT Presentation

wwwbg21comINGENIOUS SOLUTIONSBG CONSULTING ENGINEERSPRESENTATION TO CERN 15102020PIERRE EPARS PHILIPPE PONS NIMA NILIPOUR JRMY VOIRON15102020A22221Voje1BG Consulting EngineersSUMMARYGeneral ove ID: 858270

2020 consulting voje engineers consulting 2020 engineers voje a222 project management time tunnel lhc client frame construction point design

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "BG Consulting Engineers" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 BG Consulting Engineers www.bg - 21.com
BG Consulting Engineers www.bg - 21.com  INGENIOUS SOLUTIONS BG CONSULTING ENGINEERS PRESENTATION TO CERN | 15.10.2020 PIERRE EPARS | PHILIPPE PONS | NIMA NILIPOUR | JÉRÉMY VOIRON 15/10/2020 A222.21/ Voje 1 BG Consulting Engineers SUMMARY  General overview  Our values  Our strategic areas  Offices  Networked thinking

2  Projects around the world  Market
 Projects around the world  Market development  History  Our projects 15/10/2020 A222.21/ Voje 2 BG Consulting Engineers 15/10/2020 A222.21/ Voje 3 GENERAL OVERVIEW  Founded in Switzerland in 1954  Turnover 96.9 MCHF in 2019  22 offices in Switzerland, France, Italy, Portugal and Algeria  Employee - owned  Pro

3 jects around the world  Multidiscipli
jects around the world  Multidisciplinary project teams  Innovative solutions  Recognised engineering and consulting services in the areas of:  Infrastructure  Environment  Building construction  Energy BG Consulting Engineers OUR VALUES  Creativity  Reliability  Team spirit  Social and environmental aw

4 areness 15/10/2020 A222.21/ Voje 4 BG Co
areness 15/10/2020 A222.21/ Voje 4 BG Consulting Engineers 15/10/2020 A222.21/ Voje 5 CHALLENGES OF THE FUTURE Environmen t Mobility Living space Energy Population Housing space Infrastructure Resources BG Consulting Engineers 15/10/2020 A222.21/ Voje 6 OUR FOUR STRATEGIC SECTORS Infrastructure Buildings Environment Energy BG Consulting

5 Engineers 15/10/2020 A222.21/ Voje 7 SU
Engineers 15/10/2020 A222.21/ Voje 7 SUPPORT THROUGHOUT THE LIFE CYCLE A BROAD RANGE OF SERVICES – A SINGLE POINT OF CONTACT As a multidisciplinary consulting firm, BG can assist its clients in defining their requirements, through design and construction to commissioning and operation of each project . BG Consulting Engineers 15/10/

6 2020 A222.21/ Voje 8 OFFICES BG Consulti
2020 A222.21/ Voje 8 OFFICES BG Consulting Engineers QUALIFIED EMPLOYEES – THE STRENGTH OF BG  Average number of employees in 2019: 640  367 employees in the French - speaking part of Switzerland  89 employees in the German - speaking part of Switzerland  184 employees in France  60% engineers  7% trainees  30

7 nationalities  28% women  Average
nationalities  28% women  Average age: 40 years 15/10/2020 A222.21/ Voje 9 BG Consulting Engineers 15/10/2020 A222.21/ Voje 10 PROJECTS AROUND THE WORLD BG Consulting Engineers 15/10/2020 A222.21/ Voje 11 THE BG GROUP IN SWITZERLAND BG Consulting Engineers 15/10/2020 A222.21/ Voje 12 MARKET SEGMENTATION 48.15% 13.31% 34.23% 4.30%

8 French part of Switzerland German part
French part of Switzerland German part of Switzerland France Others 2017 BG Consulting Engineers 29.5 33.6 38.2 53.2 60.6 65.3 71.4 72.6 75.2 81.7 85 82.9 85.2 86.5 0 10 20 30 40 50 60 70 80 90 100 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 44.2 50.4 59.4 79.8 84.6 83.6 85.7 87.2 90.3 89.9 93.5 91.2 96.9 96.9

9 0 10 20 30 40 50 60 70 80 90 100 2006 2
0 10 20 30 40 50 60 70 80 90 100 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 15/10/2020 A222.21/ Voje 13 TURNOVER 2019 Turnover in M CHF Turnover in M EUR BG Consulting Engineers 15/10/2020 14 1954 – 2019: DEVELOPMENT OF THE COMPANY 15 A222.21/ Voje Number of employees BG Consulting Engineers 15/10/2020 A2

10 22.21/ Voje 15 ORGANIZATION CHART BG Con
22.21/ Voje 15 ORGANIZATION CHART BG Consulting Engineers 15/10/2020 A222.21/ Voje 16 EXECUTIVE BOARD Anne - Claire Pliska, Directrice du Développement et de l'Innovation Pierre Epars , CEO Henriette Haas - Brutus, CFO / COO Roselyne Loeb, DRH Gilles Pirat , Directeur Bâtiment & Energie (DB) Philippe Pons, Directeur Infrastructu

11 res & Transport (DI) Alexis Pourprix, D
res & Transport (DI) Alexis Pourprix, Directeur du domaine Eau & Environnement (DE) Sylvain Riss , Directeur Numérique et BIM BG Consulting Engineers 15/10/2020 A222.21/ Voje 17 BOARD OF DIRECTORS Nicolas Rist Martin Wickenhäuser Alain Guttmann, Chairman Daniel Crausaz BG Consulting Engineers OUR PROJECTS 15/10/2020 A222.21/ Voje

12 18 BG Consulting Engineers LOETSCHBERG
18 BG Consulting Engineers LOETSCHBERG BASE TUNNEL (CH)  Construction of an alpine rail link  BG was involved at every step:  Design and construction management of civil engineering works and railway equipment  Project management  A provisional phase of the works was commissioned in 2007 with the works only being part

13 ially completed  On behalf of the BLS
ially completed  On behalf of the BLS railway company, a group of engineering firms, including BG, developed the scheme design in order to calculate the completion costs. The consortium is also in charge of the studies, the construction management and supervision of the future development of the tunnel. 15/10/2020 A222.21/ Voje

14 19 Client: BLS AlpTransit AG Time frame
19 Client: BLS AlpTransit AG Time frame: 1998 – in progress BG Consulting Engineers LYON – TURIN (F/IT)  BG has been involved in the Lyon – Turin Transalpine high - speed railway venture since the very beginning.  After having managed and coordinated for nearly 10 years the studies for the elaboration of a Reference P

15 roject finalized for the entire internat
roject finalized for the entire international section, BG, with its partners from the GEIE ALLTI consortium, is in charge of the project management of the base tunnel between the foot of the Villarodin - Bourget/Modane ramp and Italy.  The mandate covers project studies, the production of company consultation documents, assista

16 nce with the works contract and the man
nce with the works contract and the management of the works and their acceptance. 15/10/2020 A222.21/ Voje 20 Client: Tunnel Euralpin Lyon - Turin (TELT) Time frame: 2009 – in progress ©TELT BG Consulting Engineers GRAND PARIS EXPRESS (F) Many tunnel boring machines are simultaneously excavating below the Paris suburbs installi

17 ng 200 km of new driverless metro lines
ng 200 km of new driverless metro lines. BG covers:  General assistance to the project owner of lines 15 South, 16 and 17: project management, optimization and coordination, administrative management  Assistance to the geotechnical project owner for lines 14 South and a section of line 15 South 15/10/2020 A222.21/ Voje 21 Cli

18 ent: Société du Grand Paris Time frame:
ent: Société du Grand Paris Time frame: 2013 – 2030 Saint - Denis Pleyel © Société du Grand Paris - Agence Kengo Kuma & associates 2 BG Consulting Engineers GRAND PARIS EXPRESS (F) 15/10/2020 A222.21/ Voje 22 Client: Société du Grand Paris Time frame: 2014 - 2015  Spoil Management  Geological and geotechnical analysis 

19 Spoil management of polluted materials
Spoil management of polluted materials  Production of models of materials management  Multi - criteria analysis | optimizing transport BG Consulting Engineers NANT DE DRANCE (CH)  Construction of a 900 - MW underground pumped - storage scheme between the Emosson and Vieux - Emosson reservoirs  BG's role in the project:

20  Tender phase  Assistance for the
 Tender phase  Assistance for the geological investigations  Detail design of the main caverns (excavation, support system and powerhouse concrete structure)  Fire safety concept and HVAC (Heating, ventilation and air conditioning)  Site supervision and as - built drawings 15/10/2020 A222.21/ Voje 23 Client: Nant de

21 Drance SA Time frame: 2008 – 2020 B
Drance SA Time frame: 2008 – 2020 BG Consulting Engineers CEVA : CORNAVIN – EAUX - VIVES – ANNEMASSE (CH/F)  CEVA is a 16.5 - km rail line (including 6.5 km underground) that aims to connect the French and Swiss railway links.  There are seven stations and open - air or underground stops along the route. Heating, ven

22 tilation and air condition, sanitary and
tilation and air condition, sanitary and electrical equipment as well as fire ventilation for these was handled by BG.  As part of a consortium, BG constructed also a 2 km tunnel section, including a two - track tunnel, a cut - and - cover tunnel and a new underground station ( Carouge - Bachet ). 15/10/2020 A222.21/ Voje 24 Cl

23 ient: DCTI État de Genève/ CFF Project
ient: DCTI État de Genève/ CFF Project studies: 2003 – 2011 Time frame: 2012 – 2019 © CEVA BG Consulting Engineers GENEVA - CORNAVIN MAIN TRAIN STATION (CH)  Capacity increase/expansion of the station  The project aims to enable the:  Continuation of rail operations throughout with a limited surface level impact whil

24 e including provisions for future exten
e including provisions for future extensions The mission of BG includes:  Preliminary studies of the entire project to extend the Geneva railway node,  lead of the JV for architectural studies, civil engineering, BIM Coordination, HVAC and site supervision in the central sector 15/10/2020 A222.21/ Voje 25 Client: CFF Time fr

25 ame: 2017 - 2030 BG Consulting Engineer
ame: 2017 - 2030 BG Consulting Engineers GENEVA EASTERN BYPASS | LAKE GENEVA CROSSING (CH)  According to alternative 3 (c), the project provides for a 2x2 lane motorway with the Chêne - Bougeries tunnel, the Frontenex tunnel, and the immersed tunnel, which crosses the lake between Belle Fontaine and Le Vengeron  Preliminar

26 y studies: Method & Civil Engineering,
y studies: Method & Civil Engineering, safety and impact studies) of the immersed tube tunnel solution  Ventilation: estimation of ventilation requirements, ventilation system and construction provisions  Safety concept, constructional provisions, emergency access, traffic management concept 15/10/2020 A222.21/ Voje 26 © CEVA

27 Client: DCTI État de Genève Project st
Client: DCTI État de Genève Project studies: 2009 – 2010 BG Consulting Engineers NETTUN PROJECT NEW TECHNOLOGIES FOR TUNNELING AND UNDERGROUND WORKS 15/10/2020 A222.21/ Voje 27 © CEVA  Risk Assessment & Monte - Carlo Method  Management of construction time and cost effectiveness by implementation of the DAT software 

28 Decision support tools formatted specif
Decision support tools formatted specifically for tunnel projects  Justification for recognition work  Choice of realization methods  Budgetary choices (provision for risks) BG Consulting Engineers CERN LHC POINT 1 (CH) CERN HL - LHC POINT 1 (CH) FRANÇOIS LAIGLE (EDF CIH)  LHC Point 1 | Design Phase  Design of the UX1

29 5 Cavern | ATLAS  Design of the USA15
5 Cavern | ATLAS  Design of the USA15 Cavern  Numerous Publications  HL - LHC Point 1 | Design Phase  Geological and Geotechnical Expert 15/10/2020 A222.21/ Voje 28 Client: CERN Time frame: 1999 – 2001 Time frame: 2016 – 2018 © CEVA BG Consulting Engineers CERN LHC POINT 1 (CH) EMMANUEL RIGAUD (BEC TRAVAUX SOUTERRA

30 INS | PERFOREX )  LHC Lot 2 | Constr
INS | PERFOREX )  LHC Lot 2 | Construction Phase  Construction Site Manager  Expert Engineer  Completion of Shafts and underground Caverns of LHC Lot 2 15/10/2020 A222.21/ Voje 29 Client: CERN Time frame: 1999 – 2001 © CEVA BG Consulting Engineers CERN LHC POINT 1 (CH) HERVÉ DÉTRAZ (BG CONSULTING ENGINEERS)  LHC P

31 oint 1 | Construction Phase  Geologic
oint 1 | Construction Phase  Geological and Geotechnical Engineer  Geological monitoring of UX15 Cavern | ATLAS Cavern  Geological monitoring of USA15 Cavern 15/10/2020 A222.21/ Voje 30 Client: IMPLENIA Time frame: 1999 – 2001 © CEVA BG Consulting Engineers CERN HL - LHC POINT 1 (CH) JÉRÉMY VOIRON (SETEC CH)  HL - LHC

32 Point 1 | Construction Phase  Geolog
Point 1 | Construction Phase  Geological and Geotechnical Engineer  Management of expected polluted materials  Technical referent in charge of the management of numerous optimizations  HL - LHC Point 1 | Design Phase  Design of the US/UW17 Cavern, and connexions with adjacent tunnels and shaft  Establishment of the

33 specifications  Establishment of the
specifications  Establishment of the Geotechnical Baseline Report (GBR) 15/10/2020 A222.21/ Voje 31 Client: CERN Time frame: 2016 – 2020 © CEVA BG Consulting Engineers BIM – BUILDING INFORMATION MODELLING A CORE COMPETENCE OF BG 15/10/2020 A222.21/ Voje 32 BG Consulting Engineers 15/10/2020 A222.21/ Voje 33 PUB RECRUTEMENT