What is Voltage Optimisation What do the Experts say A 230V linear appliance used on a 240V supply will take 43 more current and will consume almost 9 more energy and only achieve 55 of its rated life ID: 551718

voltage savings powerstar kwh savings voltage kwh powerstar saving optimisation unit installed annual reduction side consumption energy centre building

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "What does voltage optimisation do?" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1
Slide2

What does voltage optimisation do?Slide3

What is Voltage Optimisation?Slide4

What do the Experts say?

“A 230V linear appliance used on a 240V

supply will take 4.3% more current and will

consume almost 9% more energy …”

and

“… only achieve 55% of its rated life

Savings with Voltage Optimisation completely depends on the load the company has and therefore a full site survey is essential.Slide5

Reduce kWh

Reduce CO

2

CRC, CSR

Save money

In addition,

VO helps with

Targets, obligations, pressures…

Why is it important to optimise site voltage?Slide6

Reduces kWh Consumption

How does Voltage Optimisation help?Slide7

Will everything consume less energy?

NO not everything …

Greatest savings come from inductive loads (Motors, Lighting)

Some loads will yield less savings (VSDs)

Some loads will yield zero savings, but will benefit in other ways

It is important to understand the electrical loading characteristics of your site.

Remember no two sites are the sameSlide8

InstallationSlide9

Optimise at HV side or LV side?

The diagram below shows a typical onsite plant room set-up, without any voltage optimisation technologies being utilisedSlide10

Optimise at HV side or LV side?

The diagram below shows the same typical plant room set up, but highlights where Powerstar voltage optimisation technologies can be installed on either the HV or LV supply

Powerstar voltage optimisation system,

available in fixed or electronic-dynamic variations

High voltage side

Low voltage side

POWERSTAR HV MAX:

An amorphous core

super low-loss transformer with integral voltage optimisation and electronic-dynamic regulation

POWERSTAR VOLTAGE OPTIMISATION SYSTEM:

Available in fixed or electronic-dynamic variationsSlide11

Case studies and testimonialsSlide12

Total before (kWh) (24 days) 34355.3

Total after (kWh) (24 days) 25403.8

Savings (kWh) 8951.5

% Savings 26.1%

Annual savings based on 8p/kWh £10,891

Guoman Hotels Group Ltd – Thistle Hyde Park

“So far the Powerstar installations in our hotels have achieved as much as an amazing 26.1% saving in total electricity consumption at our Thistle Hyde Park Hotel and elsewhere, never less than an 11.5% saving.

David Hannah, Head of Property, Guoman Hotels Group LtdSlide13

Annual energy consumption reduction and cost savings

Unit 1: 24.7% reduction / £8,067 saving

Unit 2: 11.3% reduction / £3,391 saving

Unit 3: 13.65% reduction / £4,537 saving

Unit 4: 8.59% reduction / £6,598 saving Unit 5: 6.2% reduction / £8,204 saving

Department for Business Innovation & Skills

Seven Powerstar units were installed into BIS, the results of five of these installations are shown below. Two of the units currently have no data for savings as BIS changed the meter and have not had data since.Slide14

NHS – Ashworth Hospital

The hospital were looking for a reliable system to effectively reduce high energy costs and consumption caused by lighting, plant & IT equipment in the hospital.

Savings (kWh) 458,272

% Savings 12%

Annual savings

£51,213

Payback period 3 years

Following the installation of four Powerstar units the hospital is benefiting from the following savings

:Slide15

Derby City Council is aiming to reduce its carbon emissions by 25% by 2013/14 as part of a ‘Climate Change Strategy’.

The Council’s Eagle Centre market,

Environmental Services parks management depot

and the Market Hall have had Powerstars installed

.

Savings (kWh) 128.972

% Savings 14.6%

Annual savings £10,000

Emission Reductions 69.2 tonnes

Derby City CouncilSlide16

“The installation of the Powerstar systems has

cut our energy cost by nearly 20%”

Chris Chisman, Engineering Manager, TEV Limited

Two Powerstar units creating a 125kVA system were installed at TEV to optimise the incoming supply to the factory. As a result an actual reduction in electricity consumption of 17.8% was achieved.

TEV Ltd

Total before (daily) 857.8kWh

Total after (daily) 704.9kWh

Savings (kWh) 153.1kWh

% Savings 17.8%Slide17

University of Surrey

The University of Surrey has held sustainability at the heart of its CSR agenda for over a decade. The campus is home to 17,900 students and 2,597 staff and views investing in sustainable technology as a critical component.

Savings (kWh) 189,474

% Savings 8.1%

Annual savings £13,911

Payback period 3 yearsSlide18

% Savings: 13.6%

London City Hall

Home of the Greater London Authority accommodates the Mayor of London, the London Assembly and 600 or so permanent GLA employees..Slide19

Can we help?

YES, we can…

If you are not sure what to do to reduce your energy consumption, contact us and we can organise a free

no-obligation proposal.

Call us on +44 (0)1142 576 200 or

e-mail us at powerstar@ems-uk.orgSlide20

Civic Offices

Installed ~2008/9Large office building with considerable amounts of LF Lighting and various pumps, fans etc.

Paid for through corporate Invest to Save fundExpected 10% savingAchieved: uncertain as new data centre installed around the same time but very likely exceeded 10%

Has now been removed as building sold - will be relocated to suitable buildingSlide21

Oakengates Leisure Centre

Installed

200kVa unit in 2010

Leisure centre with large swimming pool with considerable amounts of LF Lighting and pool equipment including AHU, pumps, fans etcPaid for through Salix – 0% Loan

Expected annual saving of 32,000kWh (~9%) leading to 4 year paybackAchieved: uncertain as building extended at the same time. Likely exceeded 10%Slide22

Oakengates Theatre

Installed 288kVa unit in 2011Mixed use building. Primarily theatre but also children's centre. Large AHU unit with pumps, fans etc.Paid for through Salix – 0% Loan

Expected annual saving of 25,000 kWh (9.3% - guaranteed) leading to 5 year payback. Slide23

Oakengates Theatre – AMR

Achieved savings – 27,063 kWh year on year (~£3,200)Slide24