A Kitchen Management Project By Grant Klover 1 Table of contents The Project Goals of the Project The Idea Pros Cons Old and New Floor Plans Cost Projected Sales Further Improvements ID: 816200

f2t floor main table floor f2t table main tapas phase catering total cost check basement 000 bar seats farm

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Proposed Changes for NECI on Main" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Proposed Changes for NECI on Main

A Kitchen Management ProjectByGrant Klover

1

Slide2

Table of contents

The ProjectGoals of the ProjectThe IdeaProsCons

Old and New Floor Plans

Cost

Projected SalesFurther ImprovementsPlan to Phase inConclusion

2

Slide3

The Project

NECI on Main Restaurant Redesign. Students will work with Kevin O’Donnell and Esteban Guevara with a budget of $100,000; on exploring the feasibility of moving the bar from the Chefs Table down to the main floor of NECI on Main, and creating a more open design for the Chefs Table as an event focused dining space. This creates possibilities for swapping Tapas and Farm to Table Dining locations and may have kitchen implications.

3

Slide4

Goals of the Project

To come up with an idea that will present the best solution to fit within the following criteria:Educational ImpactSales (potential)Volume (potential)

Demand (potential)

Staffing (will staffing needs change or stay the same)

Diversity/ flexibilityCatering

4

Slide5

The Idea

Move the Bar down from Chef’s Table to the Main FloorFill the hole between the Main Floor and Basement

Switch service of Tapas to the Main Floor and Farm to Table to the Basement

Remodel Chef’s Table to be a more open catering space

5

Slide6

Pros

Opens up CT to bigger catering/ meeting eventsThe demand for F2T would be “artificially” increased because of less seatsTapas has the potential to do 53% more business because of gaining more seats

Filling the hole between floors gives a greater separation of space by helping decrease the noise level between floors

Because of bar placement the main floor will potentially look busier from the outside

Farm to Table would be more intimate/private diningRemodel’s attract new attention from the general public

6

Slide7

Cons

The market may not support a “white table cloth” or a higher average check for Farm to TableThe basement will discourage large parties from eating Farm to Table, as it is harder to accommodate themFarm to Table will be “hidden” like Tapas is now and could see a decrease in business

Construction on the main floor and filling the hole between floors would cause the restaurant to close

Potential for confusion with long time guests if not marketed correctly

Unless it is marketed better Catering currently doesn’t have the business to support a remodel

7

Slide8

Current NoM Floor Plan

8

Slide9

New NoM Floor Plan

9

Slide10

Current CT Floor Plan

10

Slide11

New CT Floor Plan

11

Slide12

Cost

All cost are Estimated Projections given to us by Eric Seidel:Move the Bar down from Chef’s Table to the Main Floor ($25-30,000)This does not include an estimate on new carpeting or any other décor changes

Fill the hole between the Main Floor and Basement ( about $10,000)

Even if filling the hole only grants the main floor an additional 5 seats it would only take 87 turns at Tapas current check average of $23 to have this project pay for itself.

Remodel Chef’s Table to be a more open catering space ($5-10,000)

Once again this does not include an estimate for carpeting or décor changes

12

Slide13

Projected Sales

 

 

 

 

 

 

 

Current

 

 

 

 

 

 

Covers

Avg check

Sales

 

 

F2T 75 seats

1744

$ 26.07

$ 45,466.08

 

 

Tapas 40 seats

1170

$ 23.54

$ 27,541.80

 

 

Total

2914

 

$ 73,007.88

 

             Flip Flop      CoversAvg checkSales  F2T 40 seats802 $ 26.07 $ 20,914.40   Tapas 75 seats2208 $ 23.54 $ 51,965.66   Total 3010  $ 72,880.06        

       F2T $29 Check avg     CoversAvg checkSales  F2T 40 seats802 $ 29.00 $ 23,258.00   Tapas 75 seats2208 $ 23.54 $ 51,976.32   Total 3010  $ 75,234.32         F2T $30 check avg     CoversAvg checkSales  F2T 40 seats802 $ 30.00 $ 24,060.00   Tapas 75 seats2208 $ 23.54 $ 51,976.32   Total 3010  $ 76,036.32         F2T $32 check avg      CoversAvg checkSales  F2T 40 seats802 $ 32.00 $ 25,664.00   Tapas 75 seats2208 $ 23.54 $ 51,976.32   Total 3010  $ 77,640.32        

These Charts are based on a 5 month average from October 2011, and the previous 4 months of 2012 (Jan, Feb, March, and April)

13

Slide14

Further Improvements

Build a catering/finishing kitchen upstairs (2nd floor)If F2T is showing profitable sales, switch where F2T and catering/meetings events are locatedThis gives F2T more seats and it’s own entrance so it can be a stand alone restaurant

Weatherize Patio for year round service

14

Slide15

Plan to Phase in:

Phase 1 (minimum cost of $50k)Switch what floor Tapas & F2T are served on (“free”)

Move the CT bar down to the main Floor into the space marked “CT Bar” in the above picture ($30k)

Fill the hole between the main floor and basement ($10K)

This would be a great time to make any changes to carpet/ wall paint and also buy high-top tables (this can be taken out of the “un-budgeted” $50K)

Remodel CT to be a completely open floor plan (+/- $10k)

Total Cost of Phase 1 ≈ $50,000

Phase 2

(minimum cost of $20K)

If F2T is showing success with less seats at a higher average check in the basement, Move F2T up to CT

Build Catering/Finishing Kitchen in one of the office upstairs. (With no hood system $10K. With a hood system $20K. This does not account for any ovens or hot-boxes that may need to be bought.)

Move Catering/ meetings from CT down to the Basement

Total Cost of Phase 1 & 2 ≈ $70,000

Phase 3

(+/- $5-10K)

Weatherize the patio to be used for year round seating (+/- $5-10K)

Total Cost of All 3 Phases ≈ $80,000

15

Slide16

Conclusion

Without any construction the projected sales support switching what floor Farm to Table and Tapas are served onThis idea puts the bar in CT to a better use then it is currently being used for, while opening up CT to be a more flexible catering/meeting space.Based on the information given in this presentation we feel that the idea presented would be both practical and a worthwhile investment.

We are only using half of our budget to implement the first phase of the idea, leaving the other half to be used for things like:

New Carpeting

Décor

High-top tables

Paint

Inventory for new bar

Phase 2 & 3

16

Slide17

Questions?