ADO TC meeting J Malaquin 10december2019 Current baseline likely to be updated 2 ADO TC meeting J Malaquin 10December2019 2019 2020 nSWA readiness Slide extract courtesy of Karl Jacobs ID: 781291
Download The PPT/PDF document "Cavern activities in 2020" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Cavern activities in 2020
ADO / TC meeting
J. Malaquin
10-december-2019
Slide2Current baseline /!\ likely to be updated
2
ADO / TC meetingJ. Malaquin 10-December-2019
2019
2020
nSW-A readiness
Slide extract courtesy of Karl Jacobs
Slide extract courtesy of Karl Jacobs
?
Slide3LS2/2020 : cavern activities (A)
3
ADO / TC meetingSide A : Stable config up to
april at earliest
A
J. Malaquin 10-December-2019
Miscellaneous
:
Scaffoldings modified to follow the needs
Slide4LS2/2020 : cavern activities (A)
4
ADO / TC meetingSide A : Reconfiguration for BIS 78
april at the soonest
A
J. Malaquin 10-December-2019
Movement
:
EBA from large to special opening
(i.e. special opening is standard +1000 mm)
BIS 78 upgrade installation (
6-8 wks)
EBA goes to standard opening at the end of this sequence
From large to special
Slide5LS2/2020 : cavern activities (A)
5
ADO / TC meeting
A
J. Malaquin 10-December-2019
Side A
: Stable config up to
mid-october at best
Miscellaneous
:
Scaffoldings modified to follow the needs
Slide6LS2/2020 : cavern activities (A)
6
ADO / TC meeting
A
J. Malaquin 10-December-2019
Side A
:
mid-october at the very best
SW transport out
nSW transport in
Slide77
ADO / TC meeting
C
LS2/2020 : cavern activities (C)
J. Malaquin 10-December-2019
Side C : Stable config up to
june at least
Miscellaneous
:
Scaffolding for EBC will be modified for LAr needs
SW-C transport toolings will be removed when SX1 is fully available
Slide8Movement
:
Modified JTT installationBeam pipe installationSWC back inside ToroïdECT & light truck backAccess to detectors in standard opening config
8
ADO / TC meeting
C
LS2/2020 : cavern activities (C)
J. Malaquin 10-December-2019
Side C : 1
st
wave of closing
Slide99
ADO / TC meeting
C
LS2/2020 : cavern activities (C)
J. Malaquin 10-December-2019
Side C : Stable config up to final closing
(access same as during YETS)