Bellevue WA June 11 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird PE Chief Engineer WSDOT Consultant Delivery Nickle and TPA 366 421projects ID: 547246

design wsdot build budget wsdot design budget build program business yrs delivery bridges 2015 amp project million construction practical

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "ACEC Annual Meeting" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

ACEC Annual Meeting

Bellevue,

WA

June 11, 2015

Lynn PetersonSecretary of Transportation

Moving Washington Forward

WSDOT

Linea Laird,

PE

Chief

EngineerSlide2

WSDOT / Consultant Delivery

Nickle and TPA366 /421projects , 87% on time and 91% on budgetBaseline = $6.167 B, Current = $6.049, 1.9% under budget

Private sector helped with over 50% of the delivery efforts. 338 Open Agreements163 Different Prime Consultants332 Agreements totally $155 Million Authorized, $500 M on-callGEC Agreements for $748 Million,

Avg 50% of work to sub-consultants 2Slide3

New Revenue Project Delivery Business Practices

Design BuildStrongly encouraged to use Design Build procedures for Public Works projects over ten millionJTC convenes design-build contracting review panel to examine WSDOT’s design build contracting.

Construction Business PlanSustainable StaffingStrong OwnerTeam (WSDOT, AGC, Local 17, ACEC)Practical Design Legislative Oversight

Community EngagementPotential Budget ProvisoWSDOT Interim Staffing 3Slide4

4

Source: WSDOT Capital Program Development and Management

11-3-2014_sr

2015 agency proposed budget highway construction programProgram expenditures and workforce projection* 2015–2017 and beyond: Maximum workforce will be maintained at or below 2,000 FTE’s (Engineering & Technical Core Competency Level), dependent on work load.1866 May 2015Slide5

WSDOT Business

DBE Update Least Cost Planning & Practical DesignTraining Value based

Community EngagementOperation FocusIntegration of Modes Succession Planning

New Recruitments ( Deputy Secretary, RA’s, DBELO)Director Transition PlansTraining5Slide6

Thank you & Questions?

For more information contact:

Linea Laird,

P.E.Chief EngineerWSDOT360-705-7032lairdl@wsdot.wa.govSlide7

Back-pocket Slides

:Slide8

* Based on 2014 Legislative Project ListSlide9

9

Highway preservation investment levels expected to drop significantlySlide10

10Slide11

11

Transportation budget is large, but most of the budget is already committedSlide12

12Slide13

13

3,233 Structures-Avg. Age = 45 yrs.

75+ yrs. old = 310 bridges

50+ yrs. old = 1,339 bridgesSlide14

14Slide15

Structurally-Deficient Bridges

15