SASD Ad Hoc Committee Current Costs at Memorial Park 20152016 electric bill was 264160 This covered the cost of 18 events in which the lights were turned on for 16 of the events SASD used 3302 kwh of electric at 080 centskwh

Embed this Presentation

Available Downloads

Presentation (PPTX)
Document (PDF)

Download Notice

Download Presentation The PPT/PDF document "Phasing and Maintenance Cost/Coverage" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.