EN-HE  SPS  works  during YETS 2015-2016 EN-HE  SPS  works  during YETS 2015-2016

EN-HE SPS works during YETS 2015-2016 - PowerPoint Presentation

moistbiker
moistbiker . @moistbiker
Follow
342 views
Uploaded On 2020-08-27

EN-HE SPS works during YETS 2015-2016 - PPT Presentation

JL GRENARD on behalf of ENHE 18112015 ENHE Works Refurbishment amp Replacement works PR565 BB5 gt reception 10 th of December PR535 amp PR536 BA80 gt 1418 th of December ID: 804057

2016crpa preventive chariot works preventive 2016crpa works chariot maintenance1 maintenance0 handling 2016crpr operations working kuli fenwick bipoutre foreseen replacement

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "EN-HE SPS works during YETS 2015-2016" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

EN-HE SPS works during YETS 2015-2016

JL GRENARD on behalf of EN-HE

18/11/2015

Slide2

EN-HE Works

Refurbishment & Replacement works

PR-565 (BB5) -> reception 10

th of DecemberPR-535 & PR-536 (BA80) -> 14-18th of DecemberPR-520 (BA3) -> 8-10th of FebruaryPR-542 (BA82) -> 10-12th of FebruaryPA-390 (BA3) -> not yet in the planning

Slide3

Preventive Maintenance (cranes and hoists)

Equip. Ref.

Description

Building

Project type

Duration of the works

IMPACT

Intervention

DateCRPA-00390PALAN + CHARIOT KULI 1,5TBA3Yearly Preventive Maintenance1 days6568705/01/2016CRPA-00391PALAN + CHARIOT KULI 1,5TBA2Yearly Preventive Maintenance1 days6568604/01/2016CRPA-00393PALAN + CHARIOT KULI 1,5TBA5Yearly Preventive Maintenance1 days6568918/01/2016CRPA-00417PALAN + CHARIOT FENWICK 1,5TBA3Yearly Preventive Maintenance0,5 days7037205/01/2016CRPA-00418PALAN + CHARIOT FENWICK 1,5TBA2Yearly Preventive Maintenance0,5 days7036804/01/2016CRPA-00419PALAN + CHARIOT FENWICK 1,5TBA5Yearly Preventive Maintenance0,5 days7037418/01/2016CRPA-00433PALAN + CHARIOT KULI 1,5TBA6Yearly Preventive Maintenance1 days6569006/01/2016CRPA-00442PALAN + CHARIOT KULI 1,5TBA1Yearly Preventive Maintenance1 days6568304/01/2016CRPA-00472PALAN + CHARIOT KULI 1,5TBA4Yearly Preventive Maintenance1 days6568805/01/2016CRPA-00481PALAN + CHARIOT FENWICK 1,5TBA6Yearly Preventive Maintenance0,5 days7037506/01/2016CRPA-00482PALAN + CHARIOT FENWICK 1,5TBA4Yearly Preventive Maintenance0,5 days7037305/01/2016CRPA-00486PALAN + CHARIOT FENWICK 1,5TBA1Yearly Preventive Maintenance0,5 days7036704/01/2016CRPA-00722PONT BIPOUTRE REGGIANE 10T SD8ECA4Yearly Preventive Maintenance1 days6569413/01/2016CRPA-01047CRPA-01047PALAN DEMAG 1.7TBB4Yearly Preventive Maintenance1 days6569205/01/2016CRPA-01454PALAN ELEC A CHAINE MCLEVAGE/REEL 1TBA7Yearly Preventive Maintenance1 days6569106/01/2016CRPR-00533PONT BIPOUTRE S.E.P.A 30TBA80Yearly Preventive Maintenance3 days6569825/01/2016CRPR-00567PONT BIPOUTRE BRUN 40T CIRCULAIREECX5Yearly Preventive Maintenance3 days6569718/01/2016CRPR-00570PONT BIPOUTRE SOCOCER 40TECA4Yearly Preventive Maintenance3 days6569313/01/2016CRPR-00571PONT MONOPOUTRE ITALKRANE 10T ECX4Yearly Preventive Maintenance0,5 days6569518/01/2016CRPR-00782PONT SUSPENDU BIPOUTRE BRUNNHUBER 7.5 T/5TTCC4Yearly Preventive Maintenance3 days6569618/01/2016CRPR-00537PONT BIPOUTRE HAUSHAHN 30TTCC2Yearly Preventive Maintenance3 days7014615/01/2016CRPR-00544PONT MONOPOUTRE BRUN 2TTCC2Yearly Preventive Maintenance0,5 days7014714/01/2016CRPR-00555PONT MONOPOUTRE A.S.E.A 7,5TBB3Yearly Preventive Maintenance2 days7014825/01/2016

load tests of

the overhead cranes and

hoists part of the maintenance

Slide4

Preventive Maintenance (lifts)

14

14

Slide5

Handling operations tunnel

Magnet exchange ~15 (position and exact number know at last minute; as every shutdown)

TT61 -> 4 magnets removed

And plenty of transport and handling support for the various groups (cabling campaigns, CV maintenance, survey…)

Slide6

Handling operations LSS 2

Installation of new detectors for UA9 in TT20 line

Slide7

Handling operations LSS 4

Removal

of one MKE

Exchange of one MKERemoval of the helium pumping units ->LSS6Reconfiguraton of the generators in ECA4-> some co activities

with AWAKE to be expected in ECA4

Slide8

Handling operations LSS 5

Load test of the BB5 75t crane

Removal of all the equipment stored in ECA5

Opening of the wall between ECA5 and ECX5 -> storage in the BB5Handling of the skips for the concreting of the slab in ECA5

Slide9

Handling operations LSS 5

Scaffolding transport for the removal of the water cooled cables

Transport of the skips for the removal of the water cooled cables

Removal of the TCRMP.51737 collimator

Slide10

Manpower

Two teams of 3 peoples for the overall SPS

(1 dedicated for Pt5 activities, 1 for the rest of the tunnel)

Slide11

Contacts

Handling

operations

supervisionPatrick Vallet 163868 (Franck Daclin 164681)Crane maintenanceHelder Lourenco 166012 (Gilles Roche 164084)Lift maintenanceNicolas Perez 169285 (Damien Lafarge 168786)

Slide12

Impacts

For

our

activities -> impacts almost all createdFor handling operations -> please add us as supervisor e-groups: - en-dep-he-hh

- S172-Transport-ALTEAD

Slide13

Any questions or comments?

Slide14

Spares

slides

Slide15

PR-565

electrical refurbishment

Works ongoing since the 26

th of Oct.

Access conditioned to the area during the worksCompletion of the main works foreseen the 10th of Dec.

Opening of the shielding wall between ECA5 and ECX5 to adjust crane positioning system foreseen beginning Dec. Replacement of the auxiliary hoist to be done in 2016

Shielding wall to be dismantled

Working

area

Slide16

Replacement of PR-535 & PR-536 (BA80

)

Working

a

rea

Works foreseen from the 14

th

to the 18th of DecemberThe 2 cranes will be replaced in the same periodAccess conditioned during the works

Slide17

Replacement of PR-520 (BA3)

Working

area

Works foreseen from the 8th

to the 10th of FebruaryAccess conditioned during the works

Working

area

Slide18

Replacement of

PR-542

(

BA82)Works foreseen from the 10th to the 12th of FebruaryAccess conditioned during the works

Working

a

rea

Slide19

Replacement of PA-390 (BA3)

Works foreseen in the last days of YETS.

1 to 2 days of work

Some restriction to access the zone or to use the lift

Working

a

rea