Download The PPT/PDF document "EN-HE SPS works during YETS 2015-2016" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
EN-HE SPS works during YETS 2015-2016
JL GRENARD on behalf of EN-HE
18/11/2015
Slide2EN-HE Works
Refurbishment & Replacement works
PR-565 (BB5) -> reception 10
th of DecemberPR-535 & PR-536 (BA80) -> 14-18th of DecemberPR-520 (BA3) -> 8-10th of FebruaryPR-542 (BA82) -> 10-12th of FebruaryPA-390 (BA3) -> not yet in the planning
Slide3Preventive Maintenance (cranes and hoists)
Equip. Ref.
Description
Building
Project type
Duration of the works
IMPACT
Intervention
DateCRPA-00390PALAN + CHARIOT KULI 1,5TBA3Yearly Preventive Maintenance1 days6568705/01/2016CRPA-00391PALAN + CHARIOT KULI 1,5TBA2Yearly Preventive Maintenance1 days6568604/01/2016CRPA-00393PALAN + CHARIOT KULI 1,5TBA5Yearly Preventive Maintenance1 days6568918/01/2016CRPA-00417PALAN + CHARIOT FENWICK 1,5TBA3Yearly Preventive Maintenance0,5 days7037205/01/2016CRPA-00418PALAN + CHARIOT FENWICK 1,5TBA2Yearly Preventive Maintenance0,5 days7036804/01/2016CRPA-00419PALAN + CHARIOT FENWICK 1,5TBA5Yearly Preventive Maintenance0,5 days7037418/01/2016CRPA-00433PALAN + CHARIOT KULI 1,5TBA6Yearly Preventive Maintenance1 days6569006/01/2016CRPA-00442PALAN + CHARIOT KULI 1,5TBA1Yearly Preventive Maintenance1 days6568304/01/2016CRPA-00472PALAN + CHARIOT KULI 1,5TBA4Yearly Preventive Maintenance1 days6568805/01/2016CRPA-00481PALAN + CHARIOT FENWICK 1,5TBA6Yearly Preventive Maintenance0,5 days7037506/01/2016CRPA-00482PALAN + CHARIOT FENWICK 1,5TBA4Yearly Preventive Maintenance0,5 days7037305/01/2016CRPA-00486PALAN + CHARIOT FENWICK 1,5TBA1Yearly Preventive Maintenance0,5 days7036704/01/2016CRPA-00722PONT BIPOUTRE REGGIANE 10T SD8ECA4Yearly Preventive Maintenance1 days6569413/01/2016CRPA-01047CRPA-01047PALAN DEMAG 1.7TBB4Yearly Preventive Maintenance1 days6569205/01/2016CRPA-01454PALAN ELEC A CHAINE MCLEVAGE/REEL 1TBA7Yearly Preventive Maintenance1 days6569106/01/2016CRPR-00533PONT BIPOUTRE S.E.P.A 30TBA80Yearly Preventive Maintenance3 days6569825/01/2016CRPR-00567PONT BIPOUTRE BRUN 40T CIRCULAIREECX5Yearly Preventive Maintenance3 days6569718/01/2016CRPR-00570PONT BIPOUTRE SOCOCER 40TECA4Yearly Preventive Maintenance3 days6569313/01/2016CRPR-00571PONT MONOPOUTRE ITALKRANE 10T ECX4Yearly Preventive Maintenance0,5 days6569518/01/2016CRPR-00782PONT SUSPENDU BIPOUTRE BRUNNHUBER 7.5 T/5TTCC4Yearly Preventive Maintenance3 days6569618/01/2016CRPR-00537PONT BIPOUTRE HAUSHAHN 30TTCC2Yearly Preventive Maintenance3 days7014615/01/2016CRPR-00544PONT MONOPOUTRE BRUN 2TTCC2Yearly Preventive Maintenance0,5 days7014714/01/2016CRPR-00555PONT MONOPOUTRE A.S.E.A 7,5TBB3Yearly Preventive Maintenance2 days7014825/01/2016
load tests of
the overhead cranes and
hoists part of the maintenance
Slide4Preventive Maintenance (lifts)
14
14
Slide5Handling operations tunnel
Magnet exchange ~15 (position and exact number know at last minute; as every shutdown)
TT61 -> 4 magnets removed
And plenty of transport and handling support for the various groups (cabling campaigns, CV maintenance, survey…)
Slide6Handling operations LSS 2
Installation of new detectors for UA9 in TT20 line
Slide7Handling operations LSS 4
Removal
of one MKE
Exchange of one MKERemoval of the helium pumping units ->LSS6Reconfiguraton of the generators in ECA4-> some co activities
with AWAKE to be expected in ECA4
Slide8Handling operations LSS 5
Load test of the BB5 75t crane
Removal of all the equipment stored in ECA5
Opening of the wall between ECA5 and ECX5 -> storage in the BB5Handling of the skips for the concreting of the slab in ECA5
Slide9Handling operations LSS 5
Scaffolding transport for the removal of the water cooled cables
Transport of the skips for the removal of the water cooled cables
Removal of the TCRMP.51737 collimator
Slide10Manpower
Two teams of 3 peoples for the overall SPS
(1 dedicated for Pt5 activities, 1 for the rest of the tunnel)
Slide11Contacts
Handling
operations
supervisionPatrick Vallet 163868 (Franck Daclin 164681)Crane maintenanceHelder Lourenco 166012 (Gilles Roche 164084)Lift maintenanceNicolas Perez 169285 (Damien Lafarge 168786)
Slide12Impacts
For
our
activities -> impacts almost all createdFor handling operations -> please add us as supervisor e-groups: - en-dep-he-hh
- S172-Transport-ALTEAD
Slide13Any questions or comments?
Slide14Spares
slides
Slide15PR-565
electrical refurbishment
Works ongoing since the 26
th of Oct.
Access conditioned to the area during the worksCompletion of the main works foreseen the 10th of Dec.
Opening of the shielding wall between ECA5 and ECX5 to adjust crane positioning system foreseen beginning Dec. Replacement of the auxiliary hoist to be done in 2016
Shielding wall to be dismantled
Working
area
Slide16Replacement of PR-535 & PR-536 (BA80
)
Working
a
rea
Works foreseen from the 14
th
to the 18th of DecemberThe 2 cranes will be replaced in the same periodAccess conditioned during the works
Slide17Replacement of PR-520 (BA3)
Working
area
Works foreseen from the 8th
to the 10th of FebruaryAccess conditioned during the works
Working
area
Slide18Replacement of
PR-542
(
BA82)Works foreseen from the 10th to the 12th of FebruaryAccess conditioned during the works
Working
a
rea
Slide19Replacement of PA-390 (BA3)
Works foreseen in the last days of YETS.
1 to 2 days of work
Some restriction to access the zone or to use the lift
Working
a
rea