SANDY UPDATE CPOC April 2014 Superstorm Sandy October 2012 Storm Damage SIGNIFICANT WINDTREE DAMAGE KNOCKED OUT SERVICE ALONG HARLEM LINE AND NEW HAVEN LINE and the NEW CANAAN AND DANBURY BRANCHES ID: 533111

north metro railroad mta metro north mta railroad power 2014 resiliency underway design repair storm service project line grant competitive local signals

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Metro-North Railroad" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Metro-North Railroad

SANDY UPDATE - CPOCApril 2014Slide2

Superstorm

Sandy October 2012Storm Damage

SIGNIFICANT WIND/TREE DAMAGE KNOCKED OUT SERVICE ALONG HARLEM LINE AND NEW HAVEN LINE and the NEW CANAAN AND DANBURY BRANCHES

STORM SURGE IN MEADOWLANDS COMPLEX (NJ) AND HARMON YARD DAMAGES METRO-NORTH ROLLING STOCK

FLOODING KNOCKED OUT COMMUNICATIONS AND SIGNALS AND POWER SYSTEMS AND FLOODS TRACK AND YARDS

UNPRECENDENTED STORM SURGE ALONG HUDSON RIVER SHORELINE

Note: Local power outages throughout Metro-North territory prevented service from operating during/after storm and hindered return to service.Slide3

3

MTA Metro-North RailroadSlide4

4

MTA Metro-North RailroadSlide5

5

MTA Metro-North RailroadSlide6

6

MTA Metro-North RailroadSlide7

7

MTA Metro-North Railroad

Project

Cost ($M)

Status

Rolling Stock Repair

3.3

Complete

ROW Restoration - Trees

3.0

Underway

ROW Restoration - Shoreline

5.0

Underway

Power – Replace 3 Hudson

Line Substations

40.0Design completion: mid 2014Power – Replace Harlem River Lift Bridge (HRLB) Facility Houses5.0Construction: June 2014Power/C&S Infrastructure 238.030% Design Underway; Design-Build Start: January 2015C&S Equipment Repair19.0Force Account Repair UnderwayTOTAL313.3Slide8

8

MTA Metro-North RailroadSlide9

9

MTA Metro-North RailroadSlide10

10

MTA Metro-North RailroadSlide11

11

MTA Metro-North Railroad

30+ Miles Damaged Cables/SplicesSlide12

12

MTA Metro-North RailroadSlide13

13

MTA Metro-North RailroadSlide14

14

MTA Metro-North Railroad

Communications Node House

Damaged Bond BoxSlide15

15

MTA Metro-North Railroad

Project

Cost ($M)

Funding Status

Metro-North Penn Station Access Resiliency Improvements

516.0

Competitive

Resiliency Grant application submitted – March 28, 2014

Power and Signals Resiliency

50.0

Competitive

Resiliency Grant application submitted – March 28, 2014

Special Equipment

12.0

Discussions with MTA

and FTA OngoingWater Level Monitoring/Alarms/CCTV 25.0FTA Local Resiliency Funding for Scalable ProjectTOTAL606.0Slide16

16

MTA Metro-North RailroadSlide17

17

MTA Metro-North RailroadSlide18

18

MTA Metro-North RailroadSlide19

19

MTA Metro-North RailroadSlide20

20

MTA Metro-North Railroad