Description Cause Corrective Description Cause Corrective

Description Cause Corrective - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
347 views
Uploaded On 2018-10-06

Description Cause Corrective - PPT Presentation

action Liquid andor gas phase seal mechanically damaged Misalignment of TODO resulting in the application of excessive force Unbalanced unloading armhose setup Rough Handling Replace seal ID: 685481

seal todo phase unloading todo seal unloading phase hose arm gas replace due training rehearsal properly set balance force

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Description Cause Corrective" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

DescriptionCauseCorrective actionLiquid and/or gas phase: seal mechanically damaged*Misalignment of TODO resulting in the application of excessive force*Unbalanced unloading arm/hose set-up*Rough Handling*Replace seal*Properly balance any unloading arm/hose *Rehearsal training operatorsLiquid and/or gas phase: seal chemically damagedWear and tear due to not adhering to replacement frequency OR “ersatz “ variety of Chemraz 505*Replace seal*Verify seal certificate TODO-connection difficult to make due to backpressure between TODO/ball valve*Improper flushing of unloading line prior to closing the valves *Leaking bottom AND ball valve*Adequacy procedure to be verified /rehearsed*Overhaul of bottom/ball valveGas /Liquid phase: dustcap available but not mounted ->potential for dirt/sand. Ingress.Not adhering to procedures at loading Terminal (driver/ operator)Use dustcap or dummy set-upLiquid phase leaking ~2/3 drops per minute*Positioning of seal OK?*Misalignment of TODO due to excessive force*Reposition seal*Properly balance any unloading arm/hose *Rehearsal training operatorsLiquid and/or gas phase: unlevelled face of TODO resulting in a leak >10 drops per minute*Improper maintenance during overhaul*Replace seal*Review maintenance procedure

“Safety” issues EO supply – TODO ao

Slide2

DescriptionCauseCorrective actionLiquid and/or gas phase: deformation*Misalignment of TODO resulting in the application of excessive force*Unbalanced unloading arm/hose set-up*Rough Handling?*Replace TODO*Properly balance any unloading arm/hose *Rehearsal training operators“Safety” issues EO supply – TODO ao Slide3

TODO malformationSlide4

Chemical versus mechanical damage