a NEW The construction of a new standalone building b MAJOR IMPROVEMENT The alteration of any buildings or structures on a project site which does not expand the buildings or structures and for which ID: 864520

cugu project city building project cugu building city los permit site plans angeles subject plan section check green approval

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "REVISED 41817LEAN UPGREEN UPSUPPLEMENTAL..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 (REVISED 4/18/17)LEAN UPGREEN UPSUPPLEME
(REVISED 4/18/17)LEAN UPGREEN UPSUPPLEMENTAL USE DISTRICTOrdinance Effective JuneCouncil Districts: 7, 14, Comments:Thishall applyprojects thatmeethe Qualifyingriteria below and (a) NEW. The construction of a new standalone building. (b) MAJOR IMPROVEMENT. The alteration of any building(s) or structure(s) on a project site which does not expand the building(s) or structure(s), and for which the aggregate value of the alterations within any 24month period exceeds 50 percent of the replacement cost of the 6 building(s) and structure(s) on the project site, as determined by the Department of Building and Safety. Notwithstanding the provisions of Section 12.23, the existence ofa Major Improvement on a project site shall require the entire project site to be upgraded in accordance with all applicable provisions of Section 13.18 of this Code. (c) ADDITION. The expansion of any existing building(s) or structure(s), with or without other alterations to the building(s) or structure(s), on a project site in which the total aggregate value of work in any 24month period exceeds 50 percent of the replacement cost of all buildings and structures on the entire project site, as determinedby the Department of Building and Safety. Notwithstanding the provisions of Section 12.23, an additi

2 on shall be upgraded in accordance with
on shall be upgraded in accordance with all applicable provisions of Section 13.18 of this Code. (d) CHANGE OF USE. The expansion of or change toa use onthe Subject Use list under Section 13.18. E.2(d) of the Ordinance.2. PROJECT CONTEXT. (a) Project is a municipal project located within 1,000 feet of a Freeway or State Route specified in LAMC Section 13.18.F.4. (b) Project is a Publically Habitable Space adjacent to a Subject Use. (c) Primary use of site is a Subject Use adjacent to a Publicly Habitable Space. (d) Primary use of site is a Subject UseResources:The CUGU initiative links small business to existing green business resources. Permit applicants of manufacturing, industrial, and commercial uses (such as automobile services) are strongly encouragedto contact the CUGU Ombudsperson, Daniel Hackney by phone at 213. 485.3684 or by email at daniel.hackney@lacity.org . Please note that the Ombudsperson is not a resource for permit approval. Permit approval and related questions should be directed to the Department of Building and Safety:1 (from inside the City of Los Angeles)4733231 (from outside the City of Los Angeles)Permit Counters/Addresses:Metro (Downtown): 201 North Figueroa Street, Los Angeles, CA 90012Van Nuys: 6262 Van Nuys Boulevard, Van Nuys, CA 91401West

3 Los Angeles: 1828 Sawtelle Boulevard, We
Los Angeles: 1828 Sawtelle Boulevard, West Los Angeles, CA 90025South Los Angeles: 8475 South Vermont Avenue, Los Angeles, CA 90044San Pedro: 638 South Beacon Street, San Pedro, CA 90731 City staff may contact Hagu SolomonCary for additional information regarding the CUGU developmentstandards.Links and AttachmentsClean Up Green UP Supplemental Use District Checklist Form 78307831 Clean Up Green Up (CUGU) Supplemental Use DistrictOrdinance No.184246 Clean Up Green Up Supplemental Use District Application Instructionsbelow ) Clean Up Green Up Application Packet ��A-1CITY OF LOS ANGELESDEPARTMENTS OF BUILDING AND SAFETY & CITY PLANNINGCLEAN UP GREEN UP SUPPLEMENTAL USE DISTRICT PLICATION INSTRUCTIONS On April 22, 2016, City Council adopted Ordinance No. 184246 adding a new Supplemental Use District (SUD) known as Clean Up Green Up (CUGU). The purpose of CUGUto reduce cumulative health impacts resulting from adjacent and incompatible land uses. The Ordinance was signed by the Mayor and became effective on June 4, 2016. lots are identifiedin ZIMAS with the suffix “-CUGUin the Zoning Designation and is described in the Zoning Information Bulletin2458. CUGUcovers three geographies within the City: Pacoima/Sun lley, Boyle Heights, and Wilmington. f th

4 e property of interest has a “-CUGU
e property of interest has a “-CUGU” designation, please see the information in paragraphs and 2 below to determine if additional information is necessary to submit your plans for Plan Checkin order toobtain your permit. adjacent to a Subject Use (see below) ��A-2SUBJECT USE. Any use listed in the Ordinance under section 13.18.E.2(d). f the answer is “NO” to either questions 2, then your project is notsubject to the regulations of the CUGU SUD and no further action is required pursuant to the CUGUordinance. f the answerto questions 2 are both “YES”, then your project is subject to the CUGU ordinance and should follow the procedure outlined below in applying for and obtainingpermit. ittalof Plans toDepartment ofBuilding and Safety (DBS) plicant will have access to helpfulinformation and handouts regarding CUGU thru ZIMAS.For projects that are subject to CUGU, applicant will submit a complete set of plansand copies ofertificate of ccupancyfor all adjacent properties at submittal/checkin counter. Adjacentproperties are thoseproperties next to, across the street or alley from, or having a common cornerwith the propertyof interestApplicants will pay the necessary Plan Check fees at the time of submittal and the package will bero

5 uted for plan check review. n Checkby DB
uted for plan check review. n Checkby DBS: uctural Plan Check Engineers (PCE) shall complete the review process and the applicant will notified once the review is completed and the package is ready for pickIf the project is subject to CUGU, as determined by DBS, a copy of the Permit Application indicatihe CUGU Project Type(s)Project Context(s), Permit Clearance Summary Worksheet and commentsalong with other applicable Los Angeles Municipal Code requirements will be providedto theapplicant.The applicant will review all of the Plan Check commentsin order to obtain the necessary PermitClearances for all other Departments Agencies including the Department of City Planning forCUGU iew and Approval byDepartment of City PlanningDevelopment Services Counter(DSC): plicant will obtain the necessary approval from DSCfor compliance with CUGU in addition toother regulations as needed.City Planningstaff (Planner) shall provide the appropriate application and checklist form for thoject based on the PCIS Clearancethe roject Type(s), Project Context(s) provided by DBSPlanner shall review the plans using the appropriate forms and will stamp the plans to indicateapproval. Planner will also approve PCIS Clearance and will add commentidentifying the form partof the approval.Planner will th

6 en instruct theapplicant that a copy of
en instruct theapplicant that a copy of the approved form must be incorporated intothe stamped plans and the originalcopy of the forms shall be provided to PCE of DBS.Planner will then advise the applicant that they can return to DBS plan check along with the approveamped plans, applicable formsand PCIS Clearanceto complete their permitting. �� &#x/Att;¬he; [/; ott;&#xom ];&#x/BBo;&#xx [7; 35;&#x.076;&#x 316;&#x.525; 89;&#x.760; ]/;&#xSubt;&#xype ;&#x/Foo;&#xter ;&#x/Typ; /P; gin; tio;&#xn 00;&#x/Att;¬he; [/; ott;&#xom ];&#x/BBo;&#xx [7; 35;&#x.076;&#x 316;&#x.525; 89;&#x.760; ]/;&#xSubt;&#xype ;&#x/Foo;&#xter ;&#x/Typ; /P; gin; tio;&#xn 00;A-3 &#x/MCI; 0 ;&#x/MCI; 0 ;Permitting by DBS:Oncetheapplicant completes all necessary plan check comments, clearanceand any necessary corrections tothe plans with DCP approvals, the applicant can return to Plan Check to finalize the permitting processPCE willverify that the Final Plans bear the Approval Stamp fromDCP Planner along with the applicable forms and PCIS Clearance.Once PCEverifies compliance with all necessary Municipal Codes as applicable, PCE shall advance the project for approval and permit issuance or ReadyIssue status the appli