Design Project #1 Replacement of Vehicle Bridge over Spring Creek Design Project #1 Replacement of Vehicle Bridge over Spring Creek

Design Project #1 Replacement of Vehicle Bridge over Spring Creek - PowerPoint Presentation

unisoftsm
unisoftsm . @unisoftsm
Follow
346 views
Uploaded On 2020-06-15

Design Project #1 Replacement of Vehicle Bridge over Spring Creek - PPT Presentation

Centre County PA Introduction to Engineering Design EDGSN 100 Section 001 Team Stratton O akmont Team 5 Neil Tufano Jeff Irwin John Seidts Dapo Omotoba Presented to Prof ID: 777968

carbon 000 product steel 000 carbon steel product cost bar tube 400 trusses bridge design meter efficiency phase greater

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Design Project #1 Replacement of Vehicle..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Design Project #1

Replacement of Vehicle Bridge over Spring Creek Centre County, PA

Introduction to Engineering DesignEDGSN 100 Section 001Team Stratton OakmontTeam 5Neil TufanoJeff IrwinJohn Seidts Dapo Omotoba

Presented to: Prof. Berezniak Spring 2017

Slide2

Statement of the Problem

100-Year flood

Centre County, PAEmergency services cut off

Slide3

Project Objective

Slide4

Required Design Criteria

Deck span of 40 meters20 meters high.23 meter thick medium strength concreteMust be Howe/Warren

Slide5

The Technical Approach Phase 1: Economic Efficiency

Engineering Encounters Bridge Design 2016 (EEBD 2016)Simulated load softwareCalculated various costs

Slide6

The Technical Approach Phase 2: Structural Efficiency

60 popsicle sticks maximumElmer’s GlueHot Glue

Slide7

The Results Phase 1: Economic Efficiency

Dennis H. Mahan Memorial Bridge

Project ID: 00002A-Iteration #189 (Fri, 10 Feb 2017, 08:58:21)Type of Cost Item Cost Calculation Cost

Material Cost (M) Carbon Steel Solid Bar (16507.6 kg) x ($4.30 per kg) x (2 Trusses) = $141,965.62

Carbon Steel Hollow Tube (1452.7 kg) x ($6.30 per kg) x (2 Trusses) = $18,303.84

 

Connection Cost (C) (22 Joints) x (400.0 per joint) x (2 Trusses) = $17,600.00

 

Product Cost (P) 2 - 60x60 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 65x65 mm Carbon Steel Bar (%s per Product) = $1,000.00

1 - 80x80x4 mm Carbon Steel Tube (%s per Product) = $1,000.00

3 - 90x90 mm Carbon Steel Bar (%s per Product) = $1,000.00

3 - 100x100 mm Carbon Steel Bar (%s per Product) = $1,000.00

1 - 100x100x5 mm Carbon Steel Tube (%s per Product) = $1,000.00

6 - 110x110 mm Carbon Steel Bar (%s per Product) = $1,000.00

4 - 120x120 mm Carbon Steel Bar (%s per Product) = $1,000.00

6 - 120x120x6 mm Carbon Steel Tube (%s per Product) = $1,000.00

6 - 130x130 mm Carbon Steel Bar (%s per Product) = $1,000.00

1 - 130x130x6 mm Carbon Steel Tube (%s per Product) = $1,000.00

5 - 140x140 mm Carbon Steel Bar (%s per Product) = $1,000.00

1 - 150x150 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 160x160x8 mm Carbon Steel Tube (%s per Product) = $1,000.00

 

Site Cost (S) Deck Cost (10 4-meter panels) x ($4,700.00 per panel) = $47,000.00

Excavation Cost (19,400 cubic meters) x ($1.00 per cubic meter) = $19,400.00

Abutment Cost (2 standard abutments) x ($5,500.00 per abutment) = $11,000.00

Pier Cost No pier = $0.00 Cable Anchorage Cost No anchorages = $0.00 Total Cost M + C + P + S $160,269.46 + $17,600.00 + $14,000.00 + $77,400.00 = $269,269.46

Dennis H. Mahan Memorial Bridge

Project ID: 00002A-

Iteration #112 (Fri, 3 Feb 2017, 09:36:48)

Type of Cost Item Cost Calculation Cost

Material Cost (M) Carbon Steel Solid Bar (14881.9 kg) x ($4.30 per kg) x (2 Trusses) = $127,984.48

Carbon Steel Hollow Tube (714.8 kg) x ($6.30 per kg) x (2 Trusses) = $9,006.78

 

Connection Cost (C) (26 Joints) x (400.0 per joint) x (2 Trusses) = $20,800.00

 

Product Cost (P) 5 - 45x45x2 mm Carbon Steel Tube (%s per Product) = $1,000.00

4 - 65x65 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 75x75 mm Carbon Steel Bar (%s per Product) = $1,000.00

1 - 80x80 mm Carbon Steel Bar (%s per Product) = $1,000.00

3 - 90x90 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 100x100 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 100x100x5 mm Carbon Steel Tube (%s per Product) = $1,000.00

4 - 110x110 mm Carbon Steel Bar (%s per Product) = $1,000.00

8 - 120x120 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 120x120x6 mm Carbon Steel Tube (%s per Product) = $1,000.00

10 - 130x130 mm Carbon Steel Bar (%s per Product) = $1,000.00

4 - 140x140 mm Carbon Steel Bar (%s per Product) = $1,000.00

2 - 140x140x7 mm Carbon Steel Tube (%s per Product) = $1,000.00

 

Site Cost (S) Deck Cost (10 4-meter panels) x ($4,700.00 per panel) = $47,000.00

Excavation Cost (19,400 cubic meters) x ($1.00 per cubic meter) = $19,400.00

Abutment Cost (2 standard abutments) x ($5,500.00 per abutment) = $11,000.00

Pier Cost No pier = $0.00

Cable Anchorage Cost No anchorages = $0.00

 

Total Cost M + C + P + S $136,991.26 + $20,800.00 + $13,000.00 + $77,400.00 = $248,191.26\

Slide8

The Results Phase 2: Structural Efficiency

Slide9

The Best Solution

Howe Bridge

Warren Bridge

Slide10

Our Conclusions/

Recomendations Greater Structural Efficiency

Greater Design EfficiencyOverall greater performancePossible design/material changes to further decrease cost Test on a greater scale