BIHAR Fact File BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED Bihar lies midway between the humid West Bengal in the east and the sub humid Uttar Pradesh in the west which provides it with a transitional position in respect of climate economy and culture It is bounded by Nepal in the ID: 800119

bridge bridges bihar confidence bridges bridge confidence bihar state building construction corporation limited million usd date river cost project

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "BRIDGING THE GAP The Turnaround of Bihar..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

BRIDGING THE GAP

The Turnaround of Bihar State Bridge Construction Corporation Limited

Slide2

BIHAR – Fact File

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

Bihar lies mid-way between the humid West Bengal in the east and the sub humid Uttar Pradesh in the west which provides it with a transitional position in respect of climate, economy and culture. It is bounded by Nepal in the north and by Jharkhand in the south. The Bihar plain is divided into two unequal halves by the river Ganga which flows through the middle from west to east.

The topography of Bihar can be easily described as fertile alluvial plain occupying the northern part of the state - the

Gangetic

Valley.

The northern plain extends from the foothills of the Himalayas in the north to a few miles south of the river Ganges as it flows through the State from the west to the east traversing almost 450

Kms..Bihar has a diverse climate. Its temperature is subtropical in general, with hot summers and cool winters. Bihar is a vast stretch of fertile plain.

building bridges of confidence …

Slide3

BIHAR – Fact File

Bihar is a vast stretch of fertile plain

It is drained by the Ganges River, including its northern tributaries -

Gandak

,

Koshi

, originating in the Nepal Himalayas and the 

Bagmati originating in the Kathmandu Valley that regularly flood parts of the Bihar plains. The Ganges divides Bihar into two unequal halves and flows through the middle from west to east. Other Ganges tributaries are the Son, Budhi Gandak, Chandan, Orhani and Phalgu. The total area covered by the state of Bihar is 94,163 km2 (36,357 sq mi). the state is located between 24°-20'-10" N ~ 27°-31'-15" N latitude and between 83°-19'-50" E ~ 88°-17'-40" E longitude. Its average elevation above sea level is 173 feet (53 m).

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide4

BIHAR – Need for bridges

The topography of the state makes it important to have a large number of bridges

A lot of rivers cut across the state. These rivers have smaller streams which traverses most part of the state

The population is widespread with small villages

Constant flood inundation leaves the bridges as only means of

communication

Many bridges were in bad shape and were replaced

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide5

BACKGROUNDEstablished on 11

th June 1975. Scenario in 2006

Irregular Salaries (500 employees)Decision to wind-up

Loss of Rs.17

CroresToo much Non-Plan expenditureBudget Constraints

Fewer projects to handleTardy executionPoor commercial profitability

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide6

BACKGROUNDSITUATION OF HOPELESSNESS, COMPLETE DISARRAY AND EMPLOYEES WITH LOW SELF ESTEEM

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide7

…APRIL 2006the revival begins

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide8

Fixation of centage

charge – For every work which the Corporation did, it would get a fixed amount in form of

service charge. Two

pronged strategy

– To complete all pending bridges To bag new work order.

As many as fifteen major bridges were under construction for last 15 years or moreRight person selected for the right place Creation of few new divisions without any extra burden on establishment cost

INNOVATIONS

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide9

Outsourced Vehicle

G.P.R.S

enabled mobile phone

Plenty of administrative freedom

Best reward in shape of paid vacation to foreign destination

THE ABOVE MEASURES WERE RECIPROCATED BY ENTHUSIASTIC ENGINEERS – ALL PENDING BRIDGES COMPLETED BY DECEMBER 2008

MOTIVATIONAL STRATEGIES

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide10

The state government awarded Rs.1150 Crores

(USD) under Chief Minister Bridge Development Programme

New Project meant

D.P.R

preparation, quick tender, supervision etc. - all outsourcedStandard Bidding Document introduced for procurement - use of e-tendering

Process of registration of contractors simplified (24 Hrs.) instead of 3 monthsQuality Control

modernisation of Quality laboratory at headquarterthird party quality check

NEW PROJECTSBIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide11

Regular inspection of sites by the Chairman

Installation of “Mobile Inspector” software in the GPRS

enabled mobile phones of engineers - due to this the report along with photographs of the actual work site, accessed at the headquarter (realtime e-mail report)

SUPERVISION

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Key Benefits

Latest up-to-date

information of all

ongoing projects

Documented proof of

work for compliance/

vigilance.

No extra clerical effort

for documentation /

sending reports. Engineers do it on site...while they work.

Slide12

Introduction of online monitoring system - A.E.’s

and above equipped with laptops

VPN and wi-fi connectivity.

Monthly meeting of contractors and third party quality consultants

SUPERVISION

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide13

Roping in professional motivators to pep talk the dispirited engineers

Community lunches

Celebration of major festivals

Regular Yoga Camps

Art of Living Sessions

Mandatory annual health check-upPROMOTION OF “WE FEELING”

POSITIVE REINFORCEMENT

building bridges of confidence …

Slide14

Brainstorming session at regular intervals

Use of all levers of motivation – advancement, recognition, fear and anger

Concept of Foundation Day – 11th

June

Nigam Nite (24

th December)Birthday wishes to employees

State-of-the-art Gymnasium

TEAMWORKBIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide15

JUNE 12 2008 -

INAUGUARTION OF 140 BRIDGES BY Hon’ble CHIEF MINISTER AT ONE GO

COMPLETION

OF MORE THAN 1000

BRIDGES IN 7 YEARS (1975 – 2005 - 340 BRIDGES)

NET PROFIT OF ALMOST 15.924 MILLION USD (RS. 100 CRORES)

DIVIDEND PAID TO GOVERNMENTHIGHEST TAX PAYING STATE PSU IN BIHAR

RESULT AND IMPACT

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide16

CONNECTING LIVES …..

(Corporate Social Responsibility)

CONTRIBUTION OF 65 CRORES TOWARDS CM RELIEF FUND .796 million USD

5

Crs. – 2007 - 08 FLOODS 3.185 million USD 20 Crs

. – 2008 - 09 KOSI CATASTROPHE 3.185 million USD 20 Crs. – 2009 -10 DROUGHT 1.592 million USD 10 Crs

. – 2010 - 11 1.592 million USD 10 Crs. - 2012 -13 ADOPTION OF TEN ORPHAN CHILDREN

RESULT AND IMPACTBIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide17

Number of bridges constructed

IMPACT OF REFORMS

Improvement in measurable indicators

RESULT AND IMPACT

building bridges of confidence …

Slide18

All values in million USD

IMPACT OF REFORMS

Improvement in measurable indicators

(cont. )

RESULT AND IMPACT

building bridges of confidence …

Slide19

NET WORTH

IMPACT OF REFORMS

Improvement in measurable indicators

(cont. )

All values in million USD

NET WORTH

RESULT AND IMPACT

building bridges of confidence …

Slide20

IMPACT OF REFORMS

Improvement in measurable indicators

(cont. )

All values in million USD

ACCUMULATED LOSS/PROFIT

RESULT AND IMPACT

building bridges of confidence …

Slide21

IMPACT OF REFORMS

Improvement in measurable indicators

(cont. )

PROFIT AFTER TAX

All values in million USD

RESULT AND IMPACT

building bridges of confidence …

Slide22

DIVERSIFICATION :

ROADS BUILDINGS : Flood Shelters, Medical Colleges, Hostels,

Convention

Center, Parks, Public Conveniences, IRRIGATION

STRUCTURE EVENT MANAGEMENT

MAJOR MILESTONES

building bridges of confidence …

Slide23

1

.

ACT WITH A SENSE OF URGENCY

“CONSTRUCTIVE IMPATIENCE”

2. OVERRIDING COMMITMENT TO TIMELY COMPLETION AND QUALITY ( ISO 9001 & ISO 14001 CERTIFIED COMPANY)

3. TEAMWORKSOME OF THE DEFINED PRINCIPLES (MANTRAS)

building bridges of confidence …

Slide24

SENSITIVITY

TOWARDS THE NEEDS OF THE EMPLOYEES

MARKET FORCE IS THE DRIVING FORCE BEHIND EVERYTHING THAT WE DO

6. PULL ALL LEVERS OF MOTIVATION - ….

MONEY, ADVANCEMENT, RECOGNITION, FEAR, ANGER

SOME OF THE DEFINED PRINCIPLES (MANTRAS)

building bridges of confidence …

Slide25

7. STRATEGIC CLARITY ……

“If you don’t know where you are going, any road will get you there”

CREATION OF A BRAND

CHANGING THE WORK CULTURE

SOME OF THE DEFINED PRINCIPLES (MANTRAS)

building bridges of confidence …

Slide26

CHANGING THE ATTITUDE AND BEHAVIOR OF EMPLOYEES WAS VERY- VERY HARD TO ACCOMPLISH. ….. WHAT WE HAVE DONE IS THE CREATION OF CONDITIONS FOR TRANSFORMATION

11. CELEBRATION OF FOUNDATION DAY

AWARDS FOR BEST EMPLOYEES, CONTRACTORS

SOME OF THE DEFINED PRINCIPLES (MANTRAS)

building bridges of confidence …

Slide27

PM Award for excellence in Public Administration for the

“Turnaround of Bihar State Bridge Construction Corporation

Limited”

RECOGNITION

building bridges of confidence …

Slide28

Name of Major Bridges under

construction

Cost (in Rs.

Crores

)COST

(IN MILLION USD)Bridge on Ganga

river between Arrah-ChapraRs.676.00107.643Bridge on Kosi river at Baluaha Ghat (

Saharsa)Rs.533.1584.896Bridge on Kosi river at Vijay Ghat (Bhagalpur)Rs.367.0058.439Bridge on Gandak river at Ratwal Ghat (West

Champaran)Rs.358.60

57.102

Bridge on

Gandak

river at

Bishunpur

(Gopalganj)

Rs.317.4350.546Bridge on

Bagmati river at Piprahi (Sheohar)Rs. 56.428.984Bridge on Bagmati river at

Mandhar

(

Sitamarhi

)

Rs.42.28

6.732

Bridge on Arai river between

Bishanpur-Atarbel

(

Darbhanga

)

Rs.34.90

5.557

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide29

Name of Major Bridges under

construction

Cost (in

Rs

. Crores)

COST(IN MILLION USD)Bridge on

Budhi Gandak river at Ranghi Ghat (Muzaffarpur)Rs. 19.83

3.158Bridge on Budhi Gandak river at Jatwa Ghat (East Champaran)Rs.19.823.156Bridge on Budhi Gandak river between Bajitpur-Narhan (Samastipur

)Rs.13.56

2.159

Bridge on

Karmnasha

river at

Kakrait

Ghat (Kaimur)

Rs.12.421.978

Bridge on Barnar river between Kenduar-Balthar (Jamui)Rs.11.191.782

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide30

CHIRAIYANTAND BRIDGE, PATNA

Start Date

03/2003

Completion Date

06/2009

Cost of Project

(Rs.8400.00 Lacs)13.376 million USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide31

ARWAL SAHAR BRIDGE

Start Date

03.10.2008

Completion Date

31.05.2013

Cost of Project

(Rs. 188.78Lacs) 30.311million USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide32

Bridge on Mohane River of Sikandara Bandh, Patna

Start Date

01/2009

Completion Date

06/2010

Cost of Project(Rs.433.16 Lacs).689 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide33

Rasiyari Bridge, Darbhanga

Start Date

10/2008Completion Date

05/2010

Cost of Project(Rs.1900.07 Lacs)

3.025 million USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide34

Larjha Bridge, Samastipur

Start Date

05/2008Completion Date

05/2010

Cost of Project(Rs.2953.69 Lacs)

4.702 million USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide35

Bridge on Maan Dhar, Palsa Macharhatta Bazar Road, Purnea

Start Date

11/2008

Completion Date

06/2010

Cost of Project(Rs.1125.97 Lacs)1.791 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide36

Panchane Bridge Giriyak , Rajgir

Start Date

10/2006

Completion Date

01/2010

Cost of Project(Rs.1855.00 Lacs)2.954 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide37

BALUAHA GHAT, SAHARSA

Start Date

09.12.2009Completion Date

08.12.2013

Cost of Project(Rs. Rs

. 531.15 Crore.) 85.284 million USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide38

Bridge on Birha River, West champaran

Start Date

10/2008

Completion Date

04/2010

Cost of Project(Rs.788.00 Lacs)1.255 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide39

Bridge on Baidi Dhar, Saharsa

Start Date

12/2007

Completion Date

05/2010

Cost of Project(Rs.508.765 Lacs).809 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITEDbuilding bridges of confidence …

Slide40

RATWAL - DHANHA

Start Date

01.10.2009Completion Date

Ongoing

Cost of Project(Rs. 357.67 Cr. )57.429 million

USD

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide41

Kachoura Mahant Sthan

building bridges of confidence …

Start Date

11/2007

Completion Date

11/2009

Cost of Project

(Rs.601.92 Lacs).957 million USD

Slide42

ESTABLISHMENT DAY

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide43

GYMNASIUM AT HEADQUARTERS

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide44

NIGAM

NITE

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide45

CAPACITY BUILDING

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide46

IITF

for last 3 years Amount

.398 million USD

49 Projects

worth 73.873 million USD

building bridges of confidence …

We have just begun…886 BridgesAmount416.588 million USD

23 Parks Amount2.156 million USD146 Nos. Amount 223.877 million USD3 Nos.Amount286.624 million USD

MEDICAL COLLEGES

BRIDGES

ROADS

PARKS

EVENT

MANAGEMENT

OTHERS

Slide47

THE ROAD AHEAD

Expand scope of operations beyond Bihar

Achieve expeditious growth through large, high value projects

Use state of the art construction technology

Technical support from professional consultants Looking for partners, consultants, contractors, Experts in Bridges and Infrastructure Development

Reduction in the Construction time period with provision of incentives

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide48

BIHAR STATE BRIDGE CONSTRUCTION CORPORATION LIMITED

building bridges of confidence …

Slide49

We have miles to go before we sleep, because we not only build bridges between places and people, we build bridges of