Roadmap amp Milestones Production and installation in LS2 January Production start March Preproduction batch June End of production February End of modules tests August End of Tunnel Installation ID: 798752

february production installation 2017 production february 2017 installation gefe 2018 start beam layout expert june march ls2 2019 commissioning

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "SPS BPM system renovation" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

SPS BPM system renovation

Roadmap & Milestones

Slide2

Production and installation in LS2

January

Production start

March

Pre-production batch

June

End of production

February

End of modules tests

August

End of

Tunnel Installation

February

End of HW

commissioning

April

End of commissioning

with Beam

2021

2020

2019

Slide3

Production and installation in LS2

January

Production start

March

Pre-production batch

June

End of production

February

End of modules tests

August

End of

Tunnel Installation

February

End of HW

commissioning

April

End of commissioning

with Beam

2021

2020

2019

1 Technician/FSU

1 Expert 20% for debug

1 Technician/FSU

1 Expert x tunnel

1 Expert Surface

1 Expert

Slide4

End of 2016 – 2017: issues and delays

November 2016: observed saturation with high intensity trains

Redesign of the analogue front end (see Manfred presentation)

February 2017: confirmation that the expected

r

adiation level is increased

Split of the GEFE in L-GEFE and C-GEFE

July 2017: crosstalk on the input LP filters of the BDF (ADC)Filters moved outside the board

Slide5

Status in October 2017

VFC: contract being awarded. Production in 2018

[L-,C-]GEFE:

36 GEFE available for tests

L-GEFE

layout done. February 2018 first prototypesC-GEFE l

ayout done. February 2018 first prototypesBDF (ADC FMC): full production being assembledAnalogue Front-End (A-FE): see Manfred presentation

Slide6

End 2017 – 2018: roadmap to LS2

October

A-FE Layout start

A-FE Layout review

and approval

2018

2017

2019

December

A-FE prototypes (10)

February

Installation of 2

A-FE and D-FE in BA4

March

End of Validation with

beam of the A-FE

May

Start of production

A-FE V2 (30)

June

Installation of as many systems as possible

September

End of qualification with Beam

November

Slide7

End 2017 – 2018: roadmap to LS2

October

A-FE Layout start

A-FE Layout review

and approval

2018

2017

2019

December

A-FE prototypes (10)

February

Installation of 2

A-FE and D-FE in BA4

March

End of Validation with

beam of the A-FE

May

Start of production

A-FE V2 (30)

June

Installation of as many systems as possible

September

End of qualification with Beam

November

GW ready

End of Radiation Qualification

FESA SW available

FE automated test bench ready