/
A Case study in adaptive reuse A Case study in adaptive reuse

A Case study in adaptive reuse - PowerPoint Presentation

liane-varnes
liane-varnes . @liane-varnes
Follow
470 views
Uploaded On 2016-05-21

A Case study in adaptive reuse - PPT Presentation

FROM LANDFILL TO LINKS COURSE SAVE GOVERNMENT CONFERENCE 2012 JILL WOLLER FSAVE CVSLIFE AND WADE MARTIN CVS Background Ferry Point Park was originally land acquired in 1937 to enable the construction of the BronxWhitestone Bridge linking the Bronx to Queens With additional acreage ad ID: 328159

000 cost accepted reduction cost 000 reduction accepted site key settlement golf initial proposals reduces analysis landfill waste maintenance

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "A Case study in adaptive reuse" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

pptx